Introduction to National Building Code and Steps in a Construction project
1. Ans :
- Building codes are essential for all over the Nation one standerd which helps to execute work by following the code for each structures.
- With out using standered which leads to improper design of structure building.
- Easy to work with standards.
2. Ans :
Following groups are essential for Autodesk Revit
- Group A - Residential Building
- Group B - Educational Building
- Group C - Assembly Building
- Group D - Instuitional Building
- Group E - Mercantile Buillding
- Group F - Business Building
- Group G - Storage Building
- Group H - Industrial Building
- Group J - Hazardous Building
3. Ans :
- The major steps for the project cycle is
- Initiation
It is the starting point of the project which helps to find wheater the project is feasible or not , Else is the any problems while strating the project.
- Planning
Once the initation is done then the Next step is Planning which provide detail of the projcet with complete break down of structure to execute with in the given time.
- Execution
This part which is the higher percentage of the project cycle consume which is the over all exection of the site as per planning
- Process and monitoring
This part which is while executing the project there is a step which helps to follow and monitor the work.
- Closer
This is the lost step once the all work done finally closer which termed as the over all completion of the project.
4. Ans :
Different disciplines involved in Construction of project
- Contract and Bid
- Management
- Financial and Estimation
- Constructuion
- Geotechnical
- Survey
- Structural
5. Ans :
The Building are classified depend upon the usage of people.
A . Four unit apartments = Group A - Residential building.
B. School with capacity of 1000 Students = Group B - Educational Building.
C. A single unit shop = Group E - Mercantile Building.
D. Multi story shopping complex = Group E - Mercantile Building.
E. Steel machine factory = Group G - Sotrage Building or Group H - Industrial Building.
6. Ans :
Design Team :
- Coordinate with site Team
- Execution of plan
- Evaluating the project
- Management Team
- Coordinate with both site , design and Financial team
- Execute the project with in the planning period
- Access all type of support to site and design team
7. Ans :
A. Height limitations :
- According to National Building code for residential building should not greater than 15 m
- From NBC code 2005 C2.5 its clear
- Our building is 3 .2 m Height
B. Area Limitations :
- As per NBC code small and medium town should not less than 30 m2
- Our Building is 12m * 6* = 72 m2
- Hence ok
C. Room Sizing :
- As per NBC code 2005 C3.3 size fo room should not less than 9 m2
- Our Builidng room size is 3 m *6 m = 18 m2
- Hence ok.
D. Wall Height :
- As per NBC each room should not less than 2.6 m height
- Our Building height is 3 m.
- Hence ok.
E. Thickness based on the fire life and sfety :
- Our Wall thickness if of 230 mm.
- Hence it satisifies NBC Code 2005.
F. Passageway Requirements :
- As per is code Table 1 4.3 Width to length access.
- Our building access is satisfied the NBC code 2005.
8. Ans :
As per above all discuss the project satisfied all NBC code of all Limitations, Hence it is ok .