Challenge

Identification of Cracks

Question 1:

a)

Observations:

  • Concrete crushed and the reinforcement is exposed.
  • Concrete spalled beyond the reinforcement which may be a sign of rupture.
  • Beam top portion looks safe because of the flange advantage from slab.
  • The crack develops from bottom to top means rebar yielding occurs in support bottom only.

Answer:

  • Its form of Flexural failure due to reversal of stress during earthquake.
  • During stress reversal, Support top experiences Compression and Bottom experiences tension.
  • Top compression is managed by Slab advantage otom tension was not Satisfied by ineorOvided reinforcement.
  • Since the reinforcement got yielded. it can not be repaired.

b)

Observations:

  • Cracks along Beam-Column edge.
  • Cracks seem to have developed through the structure as it looks much wider.
  • Beam looks separated from the column at joints.
  • Concrete is not severely crushed

Answer:

  • Its Beam pull out failure due to insufficient development length of reinforcement in Joints
  • During earthquake, The horizontal movement of structure makes this condition worse and detached the beam member from column.
  • Providing anchorage length between two existing concrete is very difficult. So not repairable.

c)

Observations:

  • Cracks are exactly at the joint of Column- Beam.
  • Cracks in Beam developed through its entire width.
  • Slab also developed more cracks along the beam width direction.

Answer:

  • It's a Plastic hinge failure
  • The damage occurred only in the joint zone first of all.
  • Cyclic lateral loading & stress reversal at the joints led to the damage.
  • Even the slab participated to its best to handle the Tension (Slab is severely cracked means it has undergone tension with its flange condition), But unable to control the damage.
  • The joint can be strengthened.

Question 2:

a)

Observations:

  • Concrete damaged at top of a Column.
  • Concrete damaged all around the Column face.
  • Beams are safe.
  • The location of column looks at edge of the building.
  • No walls are built along the column means it is probably at Ground floor, for Parking Car movement access.

Answer:

  • It's a Soft storey failure, Technically Plastic hinge formation.
  • Due to absence of Infill walls at the Ground floor, The plastic hinge forms at the Top of ground storey columns during Lateral movement.
  • Based on the development of crush of concrete it can either be repairable or Non-repairable.

b)

Observations:

  • Concrete developed complete breakage diagonaly.
  • Longitudinal reinforcements are intact.
  • Shear reinforcement spacing looks wider (which means probably lesser shear rebar provided)

Answer:

  • It's a Pure Shear failure
  • Inadequate shear reinforcement compels Concrete takes all the shear stresses.

c)

Observations :

  • Column failed completely.
  • Failure at top of column.
  • There are two slabs connected to the column, Probably one at mid height of the column.
  • The wooden piles might be a Post failure support after column failed, providing temporary prop to avoid collapse of the entire structure.

Answer :

  • It's a Short Column failure.
  • An additional slab or a Beam connected to a Column in mid-height leads to this effect.
  • This leads to failure especially if the connection is unintentional and not accounted in design.
  • The failure given in the picture is not at all repairable.
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.