Identification of Cracks
1a
ANS:
observations:
- concrete crushed and the reinforcement is exposed
- concrete spalled beyoond the reinforcement which may be a sign of rupture
- beam top portion looks safe because of the flange advantages from slab
- the crack develops from bottom to top means rebar yielding occurs in support bottom only
causes of failures
- its form of flexure due to reversal of stress during earthquake
- during stress reversal, support top experience tension
- top compression is managed by slab advantage. bottom tension was not satisfied by the provided reinforcement
- since the reinforcement got yielded it cannot be repaired
1b
Ans:
observation:
- cracks along beam -column edges
- cracks seem to have developed through the structures as it looks much wider
- beam looks separated from the column at joints
- concrete is not severely crushed
causes of failure:
- its beam pulls out failure due to insufficient development length of reinforcement in joints
- during earthquake the horizontal movement of structural makes this condition worse and detached the beam member from column
- providing anchorage length between two existing concrete is very difficult so not repairable
1C
ANS
observations:
- cracks are exactly at the joint of column beam
- cracks in beam developed through its entire width
- slab also developed more cracks along the beam width direction
causes:
- it's a plastic hinge failure
- the damage occurred only in the joint zone first of all
- cyclic lateral loading &stress reversable at the joints led to damage
- even the slab participated to its best to handle the tension (slab is severely cracked means its has undergone tension with it flange condition but unable to control the damage
- the joint can be strengthened
2a)
ANS:
OBSERVATION:
- concrete damaged at top of a column
- concrete damged all around the column face
- beams are safe
- the location of column looks at edges of the building
- no walls are built along the column means it is probably at ground floor, for parking car movement acesses
causes of failure:
- its's a soft Storey failure. Technically plastic hinge formation
- due to absence of infill walls at the ground floor the plastic hinge forms at the top of ground Storey columns during lateral movement
- based on the development of crush of concrete it can be repairable or non -repairable
- 2b)
Ans:
observations:
- concrete developed complete breakage diagonally
- longitudinal reinforcement is intact
- shear reinforcement spacing looks wider (which means probably lesser shear rebar provided)
causes of failure:
- it's a pure shear failure
- inadequate of shear reinforcement compels concrete takes all the shear stresses
2c)
Ans:
observation:
- column failed completely
- failure at top column
- there are two slabs connected to the column probably one at mid height of the column
- the wooden piles might be a post failure support after column failed providing temporary prop to avoid collapse of the entire structure
casues of failure:
- it's a short column failure
- an additional slab or a beam connected to a column in mid height leads to this effect
- this leads to failure especially if the connection is unintentional and not accounted in design
- the failure given in the picture is not at all repairable