1)a) Observations:-
- Concrete crushed and the reinforcement is exposed.
- Concrete spalled beyond the reinforcement which may be a sign of rupture.
- Beam top portion looks safe because of the flange advantage from the slab.
- The crack develops from bottom to top means rebar yeilding occurs in support bottom only.
Answer:-
- Its form of Flexural failure due to reversal of stress during earthquake.
- During stress reversal, Support top experiences compression and bottom experiences tension.
- Top compression is managed by slab advantage. Bottom tension was not satisfied by the provided reinforcement.
- Since the reinforcement got yielded, It can not be repaired.
b) Observation:-
- Cracks along beam column edge.
- Cracks seems to have been developed through the structure as it looks much wider.
- Beam looks seperated from the column at joints.
- Concrete is not severly crushed.
Answer:-
- Its beam pull out failure due to insufficient development length of reinforcement in joint.
- During earthquake, The horizontal movement of structure makes this condition worse and detached the beam member from column.
- Providing anchorage length between two existing concrete is very difficult. So not repairable.
c) Observation:-
- Cracks are exactly at the joint of column and beam.
- Crack in beam developed through its entire width.
- Slab also developed more cracks along the beam width direction.
Answer:-
- Its a plastic hinge faliure.
- The damage only occured in the join zone.
- Cyclic lateral loading & stress reversal at the joints led to the damage.
- Even the slab participated to its best to handle the tension (Slab is severally cracked means it has undergone tension with its flange condition). But unable to control the damage.
- The joint can be strengthened.
2)a) Observation:-
- Concrete damaged at top of a column.
- Concrete damaged all around the column face.
- Beams are safe.
- The location of column looks at edge of the building.
- No walls are built along the column menas it is probably at ground dloor for parking car movement access.
Answer:-
- It's a soft storey failure, Technically plastic hinge formation.
- Due to absence of infill walls at the ground floor, the plastic hinge forms at the top of ground storey columns during lateral movement.
- Based on the development of crush of concrete it can either be repairable or Non-repairable.
b) Observation:-
- Concrete developed complete breakage diagonally.
- Longitudinal reinforcement are intact.
- Shear reinforcement spacing looks wider(Which means probably lesser shear rebar provided)
Answer:-
- It's a pure shear failure.
- Inadequate shear reinforcement comples concrete takes all the shear stresses.
c) Observation:-
- Column failed completely.
- Faliure at top of column.
- There are two slabs/Beam connceted to the column, Probably one at mid height of the column.
- The wooden piles might be a post failure support after column failed, Providing temporary prop to avoid collapse of the entire structure.
- The vertical reinforcement has been crancked.
Answer:-
- It is a short column failure.
- An additional slab or a beam connceted to a column in mid-height leads to this effect.
- This leads to failure especailly if the connection is unintentional and not accounted in design.
- The reinforcement quality has to be increased and the thickness.
- The failure given in the picture is not at all repairable.