Desk Study and Field Reconnaissance for Ground Investigation

A free lesson from Skill-Lync's Sub Surface Exploration and Geotechnical Investigation course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Week 1 Session 2 Part 1”

What will you learn in this free Sub Surface Exploration and Geotechnical Investigation lesson?

The instructor describes the desk study that comes before any testing, including site location, history, geology, utilities and past ground investigation. The lesson explains elevation versus below ground level, then the walkover survey and obstructions such as cables, vegetation and slabs.

  • Information to collect during a desk study
  • Using Google Earth for site history
  • Ground elevation versus BGL and BGS
  • Spotting obstructions during a walkover survey

What comes after lesson 2?

The next free lesson is lesson 3, “Preliminary and Detailed Site Investigation Stages Explained” (23 min). Later in Skill-Lync's Sub Surface Exploration and Geotechnical Investigation course (paid): lesson 4, Part 3; lesson 5, Part 4; lesson 6, Week 1 Session 3. The full course has 51 lessons (24 h 6 min of video); see the course overview or its price and syllabus.

Lesson transcript

Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.

So, till now we have seen what is the site investigation, what is the need for the site investigation, what is the concept and purpose behind the site investigation. Now, before starting any investigation program, we will plan how to do it. So, let's get into in detail. So, the first step in the geotechnical investigation is the desk study. So, here you are going to gather the information about the site, like where is the site located, what is the ground surface, existing ground level of the site. So, all this collective information is called as a desk study.

So, in that, we will be seeing about the site details, site history, site geology, ground related hazards, ground investigation. So, we will be learning about the location. So, where the site is actually located, whether it is in that large area or it is into the city of your, wherever you are located. So, all this details we will be collecting. The purpose to use, in the sense, what is the scope of your project, whether it is a residential building or it is a commercial building. So, what is the type of your project?

Topography, so, it is nothing but the geology of your site. Then, next is survey details. This is nothing but your coordinates, like you have your northing and easting coordinates, as well as you will be having the existing ground surface. You have a site location, in that you will have to see what is the existing ground level. So, the elevation will be always a mark in terms of plus. So, I will be getting in detail how to know about your ground surface or ground elevation in the further slides.

Boundaries, this is nothing but your site boundary, that is your size of your plot. Maybe size of your plot, maybe it is a thousand meters by thousand meters or three hundred meters by four hundred meters. It depends upon your client. And then, utilities, if you have to foresee if there are any utilities, so, suppose you have a firefighting pipe going under your ground surface, so, you need to investigate that also. As well as your, like, drainage pipes, might be going stormwater drainage or sewerage pipes. So, you should not hit that while constructing a building or during a site investigation, you should not hit on the pipe.

So, you have to be very careful in that. Then, environmental status, like, whether the site is much contaminated. So, if it is contaminated, you will have to check your soil and water samples. I mean, the chemical test has to be done. And then, the site history. So, aerial photographs, you have to collect some of the aerial photographs. So, aerial photographs and the satellite images your Google Earth will be giving you, if you Google Earth. And then, you can see your past history, like, before 15 years, how the site was there.

Maybe site was, like, it may be a kind of a pond also. And then, a backfilled later. So, before 10 years, maybe it can be a pond. And then, from there, five years, the site may be filled. So, you need to see all those things in the Google Earth. And then, presence of the water body. So, as I told you, you have to see whether any water body was there. And you have to even foresee if there are any water bodies near the site. So, you have to go for your site visit.

So, when you go for your site visit, you will have to even foresee if there are any local water bodies nearby. And then, potential of the flooding. So, if there are any marine structures, or I said, showed you in the last, during the concept and purpose of site investigation, I've shown you the offshore structures also. So, you should also see if there is any kind of high waves and kind of flooding. So, this will be very crucial for your design. And then, structures nearby. So, this also I explained in the previous slides.

Like, if there are any structures nearby your construction. So, how it is going to affect. So, all this kind of rough works you have to do during your disk studies. And then, site geology. So, geology and hydrological maps and reports. This will be done by your geologist. So, you can get the help of your geologist to know about the geology of the site. And then, hydrogeology maps and reports related with water bodies. And then, past ground investigation. So, this past ground investigation, maybe you can ask your client itself.

I mean, who is going to give the project is your client. So, you can ask if there is any past ground investigation. Maybe he can help you with that. But, suppose your building is going to come at least to the building. And you have existing metro rail. So, maybe for the metro rail, there is for sure they would have done some ground investigation in the past. So, you can collect that information from your client. And then, you can foresee what are all the, like if there are any water bodies.

Or how was the soil condition. Whether it was a loose sand or medium dense sand. What is the consistency of, I mean the strength of your ground. So, all this are the past ground investigation. Then, comes ground related hazards. So, it is like, as I said, if there is any contaminated land, then you have to go for your chemical testing. Poor ground conditions. This is nothing but, if you have a soft clay, then you have to ground improve it. Or, if you have a loose sand for 10 meters.

It can vary. Your depth can vary. It can be 5 meters or 10 meters below the ground surface. So, you should even know how to ground improve it. So, as I said earlier, you can ground improve by the compaction methods, grouting methods. There are many ground improvement methods. So, if you google it, you will know what all the ground improvements for the geotechnical areas. And then, ground instability. This is also somewhat related to your ground conditions only. If there is a poor ground conditions, your building may not be stable.

So, you have to foresee that ground instability also. If you have the open cut excavation, as I showed you in the previous slides. Then, if you have like a poor soil of 1st to 5 meters, if you go for open excavation, your slope will collapse. So, these are all related to the ground instability. And the environmental risk. This is also related to your contaminated land. So, what all the environmental risk, if contaminated land is there, if pH is not within the range. So, all this you have to discuss with your environmental engineer how to reduce the risk.

So, all this kind of disc studies, you have to go with. Finally, the ground investigation. So, based upon details you have collected before, like the past ground investigation, you have studied about your scope of your project. So, having been collected all this information, you should even just decide what all the ground investigation to be done. So, based upon your building load, you have to even recommend a few tests. So, these tests, what all the field tests to be given, I will be discussing in the future slides.

So, these are all the common information which you have to do in your disc study. So, here I have given you the few pictures. Satellite image. This is from the Google Earth. Okay, suppose this is my site. So, you have to foresee if there are any buildings in the past or you can take this also. This is my small site. So, you have to foresee if there are any local water bodies beside or what are all the constructions. You can see from the Google Earth itself.

Like, you can put a satellite image and then see if there are any buildings nearby or how the road conditions are. So, all these few details which Google Earth will give you. So, from this, you can have a basic idea how your site looks. And then here, as I told you about the past ground investigation. So, you have a proposed project site and this is past which I have already done before five years or something like that. So, you can even note that there is a presence of a loose fill.

During excavation, maybe the loose fill would have passed away and then you have a big cavity like this. So, this is all of geotechnical hazards. So, you have to see how you have to fill this gap. Otherwise, if you have a huge building load, what will happen? This will try to slide and then you will not have enough strength. If you have your building load here, you would have already studied about your pressure bulb. If this cavity is around inside your pressure bulb, so then it is having a tendency to fail.

So, I will put it in an open board. Here, this is your ground surface. And this is your front elevation. I am drawing the front elevation. Okay. So, if there is any building load coming here. So, I will put it in an Aromach format. So, if there is any like uniform load. So, if there is any cavity here. Suppose there is a cavity here. Here, cavity is nothing but the hole inside your soil. Okay. And you have a loading here. You give a load of 100 kPa.

KPa or kilonewton per meter square. Okay. So, what happens? Due to the loading, what will happen? You will have a pressure bulb, right? Which will be having an influence of 2B. So, you will have a pressure bulb like this. So what happens? The pressure will be having a distribution of 2B. So you should have already learnt in your stress distribution chapter in your soil mechanics book. So the pressure will be distributed in the 45 degree angle. Okay. So the same thing and then it will be distributed for a depth of 2B below your loading.

So if there is any cavity, what will happen? Let's see now. This is your cavity. So when you give a load of 100 Kp, what will happen? This will try to settle. So this will try to settle like this. So what will happen? Your building will have a minor cracks. Okay. So this is why you tend to have your minor cracks in your building. So you have to foresee all this kind of geotechnical hazards. So if there is any cavity, you should try to have a ground improvement method to fill this gap. So what you do is, you have to try to fill this with the grouting techniques.

So if you have to fill this with the material should be hard enough to withstand your building load also. Okay. So you have to try to fill this gap. So even if you give your building load, that building will not tend to crack. So this is how this is performed. So now let's get back to the slide. So all this information you will be getting in your past ground investigation. So now this is a survey details. The suppose this is a plot of a 300 meter by 400 meters. So a surveyor should go to the site initially and he has to give you the ground elevation.

So if the surveyor is going and then he is giving you the ground surface and then he might draw in this format. So little zoom of this is given here. So this is exactly the ground surface. So I have given you this few numbers here 16, 17, 12, 10. This is like a variable. So it depends upon your location. Maybe this can be 31 also. It can be plus 100 also. But this all the numbers are represented in plus 12 meter. So you can ask me ground surface will start from 0 meter. No. Every ground surface will have its own elevation.

So let's go to the ground elevation. So let's go to the whiteboard. Suppose this is your ground elevation. Okay. So this will always be represented with some elevation. So plus 12, some x and y number m and then the elevation might be in terms of chart data. So you should even ask your client to give this elevation. I mean it can be in terms of depending upon your area if you are in inside the India. So you can have some kind of reference like CED. Maybe the municipality will give you this datum. Okay. So if you have in Dubai, Dubai municipality will be giving Abu Dhabi, Abu Dhabi municipality. Same way US, US municipality will be giving. Depends upon the country.

So this chart data. So this chart data might be refer like even Indian standard datum ISD. It can be MISD. Suppose this elevation is like for example. Suppose your ground elevation is at as you have seen in this. So it is 15, 16, 18. So suppose we take this 18. Then we refer this as 18. So this is called as elevation. So this is called as elevation. Like this marking you call it as your ground elevation. Okay. So this is called as ground elevation. Okay. Same way if you call it as elevation. Okay. Same way if you have your ground surface. And then if you want to call below ground surface. Then you don't refer this as plus. Okay.

From here you refer it as 0 meter below ground surface. Okay. Roughly if you want to give a ground surface in terms of below ground level. Then you have to refer it as 0 meter, 1 meter below ground surface. So this is the difference between the ground elevation as well as the below ground surface. Suppose your foundation is at 1 meter below your ground surface. Then you refer it as 1 meter below your ground surface. Okay. So this will be 1 meter below ground surface. Okay. So this will be 1 meter below ground surface. The below ground surface is BGS. Okay. Below ground surface. You can even refer this as below ground level also.

So if you refer below ground level. Then you call this as BGL. Okay. And if you come here and you have your raft foundation. Same 1 meter below. So then you refer this as. Suppose your foundation is below 1 meter. Then you say your raft will be at plus 17 M C D. Okay. So this level would be plus 17 M C D. Okay. So this is the difference between the ground elevation and the ground level. So I sum it up. Like if it is in terms of elevation, ground elevation, then you have to take a plus.

And this elevation you have to get from your surveyor. And this you have to get from your client or from the municipality. Okay. So if you have your ground elevation like this plus 18 or plus 31. So you have to tell your structural engineer or client also that my raft foundation will be at I mean plus 17. That is the bottom of your raft will be at plus 17 M C D. It depends upon your foundation pressure. So if the foundation pressure is less than your surveyor. So you can recommend 1 meter below your ground surface. Or if it is satisfying 2 meter below your ground surface, then you have to say my bottom of the raft will be at plus 16 M C D.

So this will be in decreasing stages. So 18, 17, 16, 15, 14, like that. But when you term in terms of like below ground level, then this will be your zero. Okay. And then you have to say 1 meter below ground level, 2 meter below ground level, 3 meter below ground level. So this is the difference between the ground elevation and below ground level. Okay. So let's get back to the slide now. So this is what I refer it as the survey. So basically these levels elevation levels will be given to you by the surveyors.

Also the surveyor not only gives you the ground level, I mean the ground elevation, he also give you the coordinates. So it can be in terms of northing and easting. So if you want to locate your boreholes, so on your soil investigation layout, you will be recommending few field tests. So those field tests will be represented in terms of northing and easting. So if you have a borehole to be done here. Okay. So this you refer it as VH1. Okay. So surveyor will go to this point and then with the help of survey GPS equipment, he will be finding the northing and easting for this.

So the surveyor has to give you the elevation, has to give you the northing and easting coordinates for doing the soil investigation program. And then next before going into field recognizance, I will show you two pictures now. It is a GPS coordinate mission. So surveyor will use this equipment to find out the northing and easting of that borehole point. It can be any borehole or if he wants to find boundaries, so we have to locate the boundary and put fencing also, right? So he will go, which is like if it is a 300 by 300, he will go to four corners and he will put a fencing on that.

So this GPS mission is to find out the coordinates. Okay. So now let's get back to the slide. The next stage after the desk study will be the field recognizance. So the field recognizance, you have to know about the field. Okay. So you need to study about the site conditions now. So that is what if this is done after the collection of the site information and preliminary proposal for the site investigation are made. So what are the points of consideration you have to take consider during the field recognizance?

So the accessibility of the site to work and the equipment. So this is main important thing. So. So, you have to do frequent site visits or it is called walkover survey to foresee if there are any obstructions for the site to work. So, for example, I will show you a few pictures now. Yes. So, suppose you want to conduct any borehole here or any cone penetration test or any kind of field test. So, this will be an obstruction. Okay. So, this will be an obstruction for the drilling machine to enter. So, you have to foresee if there are any obstructions.

So, if and also you have to see if there are any local water bodies near the site. So, these photos were taken during my professional practice. Then occurrence of obstructions like overhead or underground cables and pipes, fences, vegetations. So, maybe as I shown here, this can be a fencing also. So, in order to protect this area, they would have given this as a fencing. So, you have to foresee that. And then this kind of vegetation bushes if you have a borehole point here. Then you have to remove this. You have to bring an excavator or a bulldozer to hit this. And then you have to try to make your machine enter here.

Or else, if you don't have bulldozer or something like that. You have to foresee if there are any other way for the machine to enter. So, these are the few sensors you have to feel during your walkover survey. Okay. Then here, suppose you have a ground slab here. Okay. Then how do you do it? How do you do your borehole test? Only option is you can, you have to cut open this slab or break this slab. So, for the borehole diameter of 150 mm diameter. So, at least you need a 300 mm by 300 mm. So, by use of core cutter, you have to break open this by 300 mm by 300 mm.

And then you try to put your borehole machine here. So, this is the only way. And now here, if you see the left hand side figure, there is a sub base on the investigation point. So, if you see a gravel here. So, on the gravel, if you do a site investigation, then there is no point in it. So, you have to bring a manual excavator to open this so that the test is directly conducted on your virgin soil or a natural soil. Okay. So, little bit common sense. You have to take a decision on your own. So, how to remove the obstruction so that your site investigation could be done.

Okay. Next is the points of consideration again. Inspection of the surface conditions at each exploratory hole location. Special consideration to be taken while conducting the field test on the payment area and the liability to restore the payment. So, as I said in this figure, you should foresee that you are cutting opening this slab as well as you have to place back. That is why you have to give a dimension. So, you cannot cut as you like. So, you have to give a dimension of 300 mm by 300 mm. After, once you finish your borehole, you have to replace it back.

Okay. So, all this kind of responsibilities you have to take. Presence of surface water and groundwater table. So, I have shown in the previous, I mean, this slide. If there are any local water bodies close to the site, even you have to go near, not only on the site, even maybe it can be 2 km away, 3 km away. So, once you have seen in the Google Earth, if there is any water bodies, then you have to prolong your site investigation, I mean, the site visit for another 2 km, 3 km, if there are any local water bodies present.

Because, these surface waters will try to come into your site, I mean, the location of the site, which will be very crucial for your design. Okay. So, you will have to take your water table into your design, right? So, you will always take a submerged weight into your design. So, all this kind of consideration, you have to foresee before you start your design. Presence of structures in the site and surrounding with their condition. That is what, if you have any site, if you have a multi-story building near your construction, so you should also see the existing structures also.

Possibility of immediate hazards to the public health and safety or environment. So, this is the most important thing. When you have a metro rail, then it is really challenging for you to do your project. Suppose, a metro rail is already existing and you want to have excavation there, then you have to stop your traffic. So, it will be more challenging also. You have to plan how to stop your, how to divert your traffic, all those things, such that there is no hazard and then threat to the public.

So, all these kind of actions you have to take before your site investigation. And then, this is uneven ground surface. So, if you see, this is a desert area. See, you have on this, if you construct your building home, it will be. So, it will be looking funny. So, in this case, a geotechnical engineer, first he has to do some earthworks. So, you have to make your ground surface level. So, this is all kind of wavy, wavy, wavy, wavy, wavy like this. So, first, with the help of some excavators, you have to first fill all these gaps and then you have to level your surface first.

So, client will be giving you some elevation. Suppose, this is maybe plus 20 and this can be plus 19 also. So, he might give you plus 20 as your level or he might even give plus 19 also. If this is a plus 19 and plus 20, then you have to try to cut this or you can evenly spread this so that it comes to evenly 19. So, this plot you have to evenly spread around and then you have to use your excavator to pass through. And then you have to bring your level, these level to plus 19 M chart datum.

Okay. So, all this kind of things you have to ensure before you start your construction.

Want the rest of Sub Surface Exploration and Geotechnical Investigation?

Get the full course syllabus and fees.

The full course is paid (₹40,000). We'll send the syllabus and call you back within one working day.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Full course · paid

Unlock the full Sub Surface Exploration and Geotechnical Investigation course

The remaining 48 lessons, mentor-reviewed projects and a certificate come with the paid course (₹40,000). Leave your details: we'll send the syllabus and fees and call you back.

Get the syllabus and fees

A counsellor calls you back within one working day.

By submitting you agree to our Terms and Privacy Policy.

Grow by Skill-Lync · free lesson

Start watching

Free, no payment. Leave your details once and every free lesson on Grow plays straight away. A Skill-Lync counsellor may call you about the full Sub Surface Exploration and Geotechnical Investigation course.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.