Why Site Investigation Matters Before Any Foundation Design
A free lesson from Skill-Lync's Sub Surface Exploration and Geotechnical Investigation course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Week 1 Session 1”
What will you learn in this free Sub Surface Exploration and Geotechnical Investigation lesson?
The instructor introduces the course and explains why every project starts with a site investigation. The lesson covers soil strata with a borehole example, in situ and laboratory testing, engineering parameters, foundation type, excavation and sheet piling, and checking adjacent structures.
- Why geotechnical investigation precedes construction
- Describing soil strata by depth from a borehole
- Disturbed and undisturbed samples, field and lab tests
- Open excavation versus sheet pile shoring
What comes after lesson 1?
The next free lesson is lesson 2, “Desk Study and Field Reconnaissance for Ground Investigation” (26 min). Later in Skill-Lync's Sub Surface Exploration and Geotechnical Investigation course (paid): lesson 4, Part 3; lesson 5, Part 4; lesson 6, Week 1 Session 3. The full course has 51 lessons (24 h 6 min of video); see the course overview or its price and syllabus.
Lesson transcript
Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.
Hello students. I will be delivering a 24-hour video lecture on subsurface exploration and geotechnical investigation. So this is one of the geotechnical engineering topic. So if you ask me who can attend this, so the eligibility would be you should have a basic understanding on the civil engineering area. So the students who have already completed their bachelor's degree or master's degree in civil engineering field or in geotechnical area field can attend this course as well as who have already pursuing their bachelor's degree or master's degree in civil engineering or geotechnical field can also attend this course.
So this course will be mainly on the geotechnical investigation, how the geotechnical investigation is carried out on the field, as well as how from the geotechnical investigation data, how we arrive at the design parameters. So this is what we are going to look into in this 24-hour video lecture. So we have this 12-week video lecture. So we will be announcing the week one, which is a site investigation and planning of a subsurface exploration. So to begin with, I will give a short introduction on the site investigation. Why do you need a site investigation? What is the purpose of site investigation? Why do you want to do it?
So if you wanted to start with any project or if any project is awarded to you, you always start with a site investigation. It's like digging the soil. So you should also understand what is a need, what is the benefit we are going to get out of this. So the site investigation one must perform to explore the ground condition. Where is the water table or any other hazard like cavities are present or any other loose formation deposits are present. So this is why a geotechnical engineer will perform this soil investigation program.
You cannot simply build the structure or a foundation on the soil. If there is a loose crater, then in the later stage, you will have a collapse of the building. So in order to avoid that, you need geotechnical investigation at the beginning of every project. So we will be seeing in a later slides of what is the concept behind the geotechnical investigation. What is the purpose of the geotechnical investigation as well as when you start with any program, you would schedule the program. Same way in the site investigation also, you have planning of the subsurface exploration and this is done in stages. Like you will have to have the desk study, field recognizance, preliminary site investigation and then comes up finally the detailed investigation.
So we will be seeing in this week one in detail how this is conducted. Okay. So let's get started now. So basically site investigation is performed once a project is proposed. So suppose you are in a tender stage or it is the beginning of your project or before the project is awarded to you, you will have to have the site investigation. Like you have to go to the site and check if there is any obstacles for entering the site. Is there any local water body present?
How the site is like neighboring structures? Like if you have a metro station nearby, how is this going to affect your building or how is this going to affect your site investigation? So this small things you have to learn before or study before project is proposed. Okay. So it is also applicable to all kinds of constructions like buildings, you know, for any building like commercial buildings, like IT parks or something, residential buildings or any type of buildings, you will need geotechnical investigation kind of bridges also tunnels, oil and gas structures and marine structures.
So how this oil and gas structure looks like we will see now. So this is the oil and gas field. You know that this is one of the booming field in nowadays actually the structures which is a constructed on land will be called as on shore. The structure which is constructed on sea like the sea will be following the land also. So once a structure is called offshore. Once a structure is nearby shore, which is like a beaches, it is called the marine structures. So this is the oil and gas structure, but ultimately this structure is on the land only.
So you see only water, but you don't know what is the depth of the water. Maybe it can be 100 meters or 50 meters or 10 meters also, but this jacket structure is ultimately resting on the land. Okay. So how the investigation is carried out for this type of structures. So it will be basically on this barge. So your whatever drilling machines or drilling tools will be installed on this barge. And from this barge early, you're going to do your offshore investigation. So this is a kind of bridges. So when you take this bridges, you will have the soil investigation for each pillars also. So you need to determine what is your length of your bridge, what is your way the pillars are going to come.
So depending upon that you will need a soil investigation here also. So this is a kind of embankment. So embankment is like you can use it for a water dam also. So this embankment or this a line of embankment. So this may be going for 10 kilometers or 5 kilometers. So at each spacing, maybe you can say like a 10 meters spacing or 5 meters spacing. If your embankment is further like 10 kilometers for each 20 meters or 30 meters, you will have one borehole. So for these type of structures, you need a soil investigation. Okay, so if this embankment is like a load on the soil, so it cannot directly rest on the soils, you need to determine the strength of this ground. So that is why your soil investigation is needed.
Let's go back to the slide now. So the site investigation is the process of collecting information about the subsurface conditions. So how do we conduct the these informations? So basically we do some testing on the subsurface, I mean the ground surface and then collect the data and from the data call whatever the information or the sample we collect or is called the factual data. Okay, the factual from the factual data only we are going to interpret the soil parameters. So basically it is used to determine the soil deposit below the ground level. So we need to know what is present below the ground surface, whether it can be a loose fill like a soft clay or a loose sand or a dense sand or a very stiff clay.
So this is all determined only by means of the site investigation. So from the field test. So basically in the site investigation, we are going to conduct the field test and from the field test is soil samples are transported to the laboratory and from the laboratory we are going to do some more testings. So from these we are going to determine our engineering parameters. Engineering parameters are nothing but you would have learned about the cohesion, you would have learned about the angle of internal friction in your semesters. So these are called engineering parameters of the soil and rock.
So in under the ground surface you might encounter any soil profile or you can even encounter the bedrock also. So site investigation plays a vital role in this. As I said earlier, the engineering properties are determined by means of the in situ techniques as well as the laboratory techniques. So you call this in situ as a field. Whatever you do at site, you refer it as in situ. So in a professional way, you call it as a in situ technique or a field techniques. So let's see what is the concept behind this subsurface exploration. Why do we do this? So the main thing we need to determine the geological strata.
That is the thickness and extent of the soil strata groundwater conditions. So thickness in that sense, what is the depth of your soil layer? For example, let's go to the whiteboard. So suppose you have a borehole here and then you have, okay, so you are doing this borehole test here. So you are going to, so, so, so from the borehole test, you, you determine that from the ground surface from here to here, maybe here it can be like one meter, you can say one meter, okay.
So now you call this as two meters. So this is your borehole, okay. This is your borehole. You have conducted some field test. and then now you are going to, so you are going to. And to determine the depth of the each layer. Suppose you have done the borehole test and this might be, this one meter might be loose fill. Okay. So this might be a loose fill. And then second one meter might be some kind of soft clay. Okay. And then this can be some silty sand. From here it can be bedrock. Okay.
You call rock as a bedrock. So to determine the thickness or the depth of the each strata, the site investigation is needed. So using your borehole test or the SPT test, you just find out what is your, the stratification. You can say like below the ground surface, one meter I have loose fill. Below two meters I have soft clay. Below three meters I have silty sand. And from below four meters I have bedrock. Or you can put in this way. Zero to one meter I have loose fill. So one meter to two meter I have soft clay.
Two meter to three meter I have silty sand. And from three meter you have a bedrock. So you represent your thickness of your geological strata in this way. Like zero to one, one to two, two to three, three to four. It depends. Maybe loose fill may be present zero to 0.5 meter also. Soft clay may be present from 0.5 meter to three meter also. It depends from your borehole test. So let's get back to the slide. And you need to determine your groundwater conditions. When you do your field test, you will be knowing where is your water table present.
Okay. So I will even discuss how to determine your groundwater table in the later slides. And also when you do your subsurface exploration program, you can even collect your disturbed and undisturbed soil and rock samples at desired intervals by means of in situ test. So you have a designated samplers for that to collect your disturbed and undisturbed samples. When the client or due to the project needs, if you have wanted to collect your undisturbed sample, then you have different sampling techniques how to collect your undisturbed samples also.
So from the field test, we would collect this disturbed and undisturbed samples. And these samples will be taken to the laboratory. So from the laboratory, what you do? You carry out the laboratory test on the selected samples. Okay. To assess the engineering parameters of the samples for the geotechnical analysis. As I said earlier, the engineering parameters are like unit weight, moisture content, like poisons ratio, cohesion value, angle of internal friction value. So these parameters are determined from the field test as well as from the laboratory test.
Next comes the purpose of geotechnical analysis or geotechnical investigation. So here we have to understand the ground. So what is really present below the ground surface? Geological, hydrological condition. Geological conditions, this is given by the geologist actually. So you need to study about the past history of the project location. What is the age of the soil? How? You have a rock also. So you have to study about the past history of the rocks. So these are specially done by the geologist for you. So this hydrological term comes into more important in offshore structures.
In the offshore structures or in the coastal area, your hydrological data will play important role. Because once the structure is in sea, you will be considering waves, wind, tide, etc. So in those conditions, hydrological data become more important. To assess the geotechnical parameters for the design and construction purposes. So once you are using from your geotechnical investigation, you arrive at the geotechnical parameter. And these parameters will be used for the design. And even during the construction purpose also, you use this value for the later stage also.
So to check the suitability of the site for the proposed project. So that is what it is the suitability of the ground alternately. So if you have high rise buildings, you should also understand whether the building load ultimately is going to be foundation pressure. So the soil should withstand the building load. So you should check the suitability of the ground conditions of the site for the proposed project. To ensure the site falls below the level of the acceptable risk. So maybe you have like environmental conditions.
In case of environmental conditions, if the soil is too much of environmental impact. So you should also see that it is within the acceptable risk. So you should also have this chemical testing on the soil and water samples. So to see whether it is all within the environmental limits. To obtain the relevant information on the ground water conditions. So as I said earlier, you should also see if there are any local water bodies present. Or you may even have the existing soil data when you start your project.
You may even have the existing soil data from the nearby projects or from the nearby areas. So you can even foresee if there are any ground water encountered in that soil data. Next is to determine the required type of foundation based on the loading conditions. So you have like strength of the soil from loose to medium. Okay. From loose to medium. And then you have G plus 22 building. So you can't go for a shallow foundation. So you are in the range of loose to medium strength.
And if you have a G plus 22 building. And if it is resting on the shallow foundation, your building might collapse. So in that case, you should have a deep foundation. So that is why we have to decide on the type of the foundation based on the loading conditions also. So loading conditions are like a dead load, live load, wind load on buildings. So if you take a offshore structures or coastal areas, instead of including this dead load, live load, whatever load. You have even wave load, heating on the structures also.
So you take this into consideration. But you can't avoid. In offshore structures, you have only deep foundation as an option. So you cannot have a shallow foundation in offshore structures. Okay. So this basic sense you should have once you decide your foundation. To provide adequate support for the structures during the design of temporary works. So temporary works is something like that. If you want to construct a small raft foundation and you have dig the soil. If your raft foundation is like just one meter below the ground surface, you will have open excavation.
So let me put it in the drawing board. So let's get started now. So you have this ground surface here. Okay. And your raft is going to come here. So this is going to be one meter I say. One meter below your ground surface. So you always measure, I mean, put your ground surface in this symbol. Okay. Suppose this is your ground surface below one meter from your ground surface. How do you excavate this? So you have this ground surface. First thing you do a open excavation from here.
And then you give a slope. This is called open excavation. And then you give a base here. So this is where your foundation will be casted. I mean, your raft foundation will be casted. So this is called as open excavation. So it is applicable not only for the foundations to any type of the structure. If you have a five meter below your ground surface, you should understand whether open excavation will withstand because due to the strength of your soil, your soil might collapse here. So you will have your failure surface here.
So you need to even see if this slope will withstand for five meters. This is only for one meter. And this can withstand. But if it is for more than three meters or five meters, you should ensure this open cut excavation is applicable or not. So in that case, what you do is, suppose you have your raft at five meters below your ground surface. So what you do is, so your ground surface is like this. So in that case, what you do is, you will have your sheet piling, which is a concept of a shoring system.
So you will have your sheet piling. Sheet piling is nothing but steel structure. Okay. So you don't have a concrete pile. It is a steel pile. If you Google what is the sheet pile, you will be knowing. So you will be inserting the or installing the sheet piles in a row. And then on the ground surface, you will be first installing your sheet pile. And then what you do is, you will try to excavate like this. You will be excavating till five meter. So this excavation depth is five meters.
Okay. And then you will be casting your. So now you know the difference between the open excavation and shoring system. So sheet pile installation is one of the shoring system or excavation system. We call it as excavation system. But you cannot simply install this sheet piling. You need to design the sheet piling. You need to what is which sheet pile to be installed based upon your strength of I mean based upon your ground conditions. You should design your sheet pile also. So if there is more than three meters or five meters, you should have some support systems. It is like a retaining wall basically. So this is how we have a detailed like geotechnical program in this. Let's go back to the slide now. So that is why I told. So to provide adequate support for the structures during the design of the temporary works including the open excavation, sheet piling, sheet piling I told right, sheet piling or tower crane. If there any tower crane to be installed for like you use tower crane for many building types right.
So when tower cranes are installed, you should even have the foundation for that. So these are all temporary structures. It is not installed permanently. So once the project is over or coming to the close, you have to uninstall all this. I mean dismantling everything. Okay. Next to check the soil suitability for its use as an engineering fill material. I suppose you have a foundation material and you're going to fill it. So let me put it in a white board. Suppose you have excavated the soil for the foundation. So suppose I have a like isolated foundation. Okay.
This foundation is basically one meter below your ground surface. If you have a isolated footing below one meter, you need to fill your soil back. So you should even see that the fill is engineered material when you call it is engineered material is like your soil which you are putting back should have a equal strength. That is the equal strength as of this. Maybe the top meter, one meter would be very loose. In many construction projects, at least the top few meters will be loose like 0.5 meter or 0.25 meter or one meter also maybe it is loose.
So when you excavate out what you should do is even this soil which is pulled out or excavated out should have equal strength equal to this. Okay. So because using your foundation pressure, you know that this foundation pressure should be very less than your safe bearing capacity. That is why you are we decide on the depth of your foundation. If your foundation pressure is less than a safe bearing capacity. We ultimately decide that one meter below the ground surface is enough. So we should also have the same idea that your even the lateral pressure should have a equal strength as a bottom area. I mean the bottom material. So this is what you called it as a engineered material.
Let's go back to the slide. So to check the soil suitability for its use as an engineered material to decide the proper ground improvement method. Once you have done your field test and you have come out that the soil below the ground surface is very poor like very soft clay for the first five meters or loose sand for the first 10 meters. So you should also have the ground improvement techniques. You have many ground improvement techniques but what all the ground improvement techniques. You should be aware. So you can even Google it and see what all the ground improvement techniques.
The few techniques come like a compaction, deep compaction, shallow compaction, vibrot flotation, jet flotation, grouting methods. So these are all the ground improvement techniques. And also you should ensure you have an adequate and economical design. So suppose your footing can rest at two meters below the ground surface. You cannot design the foundation at three meters. So it is like giving the additional cause you have to excavate. So the additional one meter will add on the cost. So you should always have adequate and economical design. This is called as a value engineering. This adequate and economic design is termed as a value engineering. In professional way you call it as a value engineering method.
Okay. To investigate the safety of adjacent structures during the construction stages. This is very very important. When you ensure the safety of the adjacent structure. Then even there will be no complaint on your structure. Something like in the middle of your construction stage. If you encounter adjacent building is having some crack. What will happen? Adjusting building person will come and give complaint on you. They'll give so much of complaint on you. So in order to avoid all those things. You need to ensure whether the adjacent structure will be safe in the beginning stages. If that is why you need to go for a walkover survey in the beginning of your I mean during your site investigation program. You have to go walkover survey to ensure if the adjacent structure will be safe during the construction phase. Okay. So I will just give a introduction on how this safety should be ensured.
So for example suppose you have ground surface here. Okay. And you have your huge building here. Okay. You have your huge building here. And you are going to excavate. You have a basement here. So what will happen? You will be having your suppose the basement can be like 10 meters or something like that. Like two level three level of basements. So what will happen? So what will happen? You will try to ultimately try to excavate. So you will have your sheet piling as I said earlier. Excavation. You go into your excavation system. So you need to decide on your sheet piles everything.
So you ultimately excavate this amount of soil. So what will happen? So what will happen is now this sheet pile when you design this sheet pile you have to take into the consideration of this load. So once due to this building load. So once due to this building load and due to the lateral pressure of the soil. What will happen? The sheet pile will try to deform. So in that case you will have a deformation curve like this. Okay. So in that case what will happen? When your sheet pile is pushing. I mean moving away from your soil. That is in the passive side. What will happen? Your building foundation will try to settle like this.
Kind of settle. Okay. So this one you need to ensure that there is no excessive settlement on the building. Okay. So that is why you always have to ensure that there is adequate space between the building as well as your existing construction. Or else you can simply put a sheet pile with an anchor. With an anchor like this. So that it will retain this sheet pile. I mean the it will not allow the excessive deformation of this sheet. So all this this is the safety of the adjacent structure. Okay. Let's go back to the slide.