← Previous lessonFree lesson 2 of 3 · lesson 2 of 56Next lesson →

Unlock all 56 lessons of Structural Design of Highrise Precast Buildings using ETABSFull course ₹40,000 · paid

Price & syllabus
Free lesson · 29 min · no payment

Precast Casting, Typical Elements and Connections

A free lesson from Skill-Lync's Structural Design of Highrise Precast Buildings using ETABS course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Week 1 Session 2”

What will you learn in this free Structural Design of Highrise Precast Buildings using ETABS lesson?

The instructor follows a precast wall from casting bed to site, using a whiteboard to explain tilting tables and why walls are tilted rather than lifted flat. The lesson then shows filigree and hollow core slabs, stairs and sandwich walls, and connections such as wall shoes, insert plates and wire loops.

  • Why precast walls are cast on tilting tables
  • Reduced concrete strength at the lifting stage
  • Filigree, hollow core, stair and sandwich wall elements
  • Wall shoe, insert plate and wire loop connections

What comes after lesson 2?

The next free lesson is lesson 3, “The Sample Building, Architectural Plans and Design Codes” (26 min). Later in Skill-Lync's Structural Design of Highrise Precast Buildings using ETABS course (paid): lesson 4, Week 1 Session 4; lesson 5, Week 2 Session 1; lesson 6, Week 2 Session 2. The full course has 56 lessons (22 h 56 min of video); see the course overview or its price and syllabus.

Lesson transcript

Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.

Moving to the next slide, we have the fabrication to the site process of particular element, be it a wall element. How particular precast wall element goes from shop to the site. So various element, be it a wall element, be it a precast VM, be it precast column or a precast slab element of various sort, it can have different way of actually construction and also the transportation. Here in this particular example that I've just shown you, this actually explains the fabrication method of a precast wall element, how it's being done or cast it at the site and then done at the factory and then being brought to the site the whole process.

So if you look at the very first image at the left, you could see a image or a snap from the plant that we have. Here you could see multiple beds that we have on which the concrete is to be done. You could see factory workers working around those. What is done actually, they lay out with the help of machines also or sometimes manual also, manually also, the reinforcement for those walls that we have. And maintaining the actual distances between the bar, the spacing that is there as per the design, the cover requirement, all those things.

And once that is done, they pour the concrete over it and the concreting is done on that table. Bear in mind in precast is not only about the reinforcement. Since you are building a final wall product and in a wall element, if you look in terms of building perspective, not only the structural engineering perspective, apart from the reinforcement that is there to withheld the wall or for at the service stage, there are other things also there are MP fixtures that need to be placed there are MP conduits that will be taking the wires of the electrical to them, they'll be taking the plumbing pipes, if there are any, all those things need to be already put within the wall element.

Similarly, all other connections that we have, because this is a precast element, this needs to be connected at the site and for that connection to happen, you need to have at least some connections to the adjacent element. If there is another wall element you need to connect it to, there is another column or there is another beam you need to connect it to, you need to be very sure and you need to place all those things at the very time where you are doing the casting.

Otherwise, if you don't do so, you miss out on certain thing or two while doing the casting, then you will have to do a fix for it at the site and you will lose in terms of quality that defeats the purpose of precast that we are doing. So it's the additional cost that you are bearing. So you need to be very sure that all the elements, all those things are very well there on the site. Although that is not part of a structural engineering concept for saying, we are not going to cover that, but that is one phenomenon you need to have in mind that actually what all need to be there in a precast element if it's already going to be there.

So it's mostly well much of concern when we are dealing with wall or slab element or beam or column element. There are very less fixtures that go through them, but mostly for wall element, there are a lot of fixtures that are there. So as you can see over this, I have written this the reinforcement for the walls on tilting table. So there is a reason that this table that I have just that you can see the bed onto which the elements are being casted. This is called tilting table. There is a reason for it.

The reason being is actually it is evident in the next image that you have, which is basically the same table. Once the concreting is done, that element is actually tilted at an angle of around 70 to 75 degree. The reason of doing so is that because if you do not tilt the table to actually lift the wall element through it, what you are going to do is you are going to lift the element either through in plane points. And what it will actually do, let the member take the out of plane bending forces.

Whereas if you know the wall element are usually only designed for in plane forces that they have or in plane bending moment, not the out of plane moments for which the slab elements are usually designed. If you are not able to understand it through these features, don't worry. I'll be taking it for whiteboard session right after this to explain it more clearly that what I'm talking about, that what exactly the tilting table phenomena is and why there is a need for it. So if further we'll be talking about those in after this slide of the slide.

So here you can see once the element that the reinforcement is in place, the connection embeds, all those things are in place. They pour the concrete over it, they also put if there is any opening a door opening or a window opening, they also put some sort of thermal call or so that that area of it is not actually casted when they are doing the concrete. Also, you could see in some of the projects, they fit the door and window frames right at the factory only.

And when it's being brought to the site, it actually already has the frame. So you actually save time there as well. You would find those things in a good quality projects where they have planted well. So there you are actually gaining in terms of free cast. In the next image, you could see the tilting table is tilted at an angle of around 70 degrees or so. And then wall elements are lifted through over here. So when you are lifting that wall element, what exactly happening? Wall element is not actually coming under flexure.

It's usually lifted off vertically. There is still be certain suction that it could get, but it won't come under flexure properly and it won't bed under its own dead weight. And you can actually overlook that design that you need to have. If you would have lifted this right out of the laying down manner, that should not be the correct way. The correct way is fill the table like that and lift it. There are some projects in which the elements are ground lifted also. But again, there what happens is actually you have to reinforce your walls much.

I'll talk more about this when we cover this in the next part. Then once these elements are lifted from the form, they are actually put onto a frame to be transported onto the side. So if you look closely onto this vehicle that you have, you have a sort of a frame, something of this. This could be a timber or a steel frame. This actually used for stacking the wall elements. So wall elements cannot be stacked one over another because again, if they are stacked one over another, what would happen that they would actually again bend under their own weight and actually would be have to be designed for more reinforcement.

But if you stack them like these vertically, they can actually be whatever service reinforcement that they have from the design stage, they can work with that and they could be okay to have it like that. You can see once these elements are put on a frame, they'll be taken to site. There are certain size restrictions also in terms of how long the truck would be so that accordingly, the wall element also has a constraint from the transportation. Similarly, in the fourth image, you oversee over here at the right bottom is actually how the elements are at the site.

So if you look closely, the elements when at the site, they are actually connected to the adjacent member for which they have to be like that. The service is they have to be propped. Certainly. So as you can see here in this image at the right bottom, you can see a bracing prop. Once the element is there, although it has been placed there, but since it's not connected, whatever bolted, welded or a concreting connection that you are planning to do outside you, if you have not done that, you'll have to prop that element so that it doesn't go off from its actual position.

Then it's planned because of some, any notional load that could come, any horizontal load that can come actually affect and move the element from its original position, which will actually affect the quality of the overall projects. You cannot, that cannot be like, you cannot bear that to happen at least. So here you can see there are multiple props that are being placed just to support the elements. You don't need that much, but at least what per wall element, at least two props are required to have that in place.

And again, there are some counterweights which are placed supporting the element so that it can bear the load of the wall if it's going off. So this is something. Now, as I was telling you the same phenomena, I'll go over a whiteboard and explain to you like how exactly this thing is covered. So again, I am just switching to a whiteboard just to explain the phenomena of precast wall element being constructed onto a tilting table. So let's move on to whiteboard. Yes. So here I have taken an example from the, just you can see it's a very rudimentary example that I've taken, very basic.

Here at the left, you can see the casting stage. How a precast element, which is basically, let's say, in the, this rectangular box in black that I've shown is actually a tilting table. And over that, you can see a reinforcement bar going through it. There'll be multiple of it because I have done a section of it. So you're only able to see one bar, but there'll be multiple bar placed at a certain spacing as per the design. Similarly, here you have a reinforcement bar from other direction.

Similarly, in actual, if you're talking in real life, when you are actually doing the element, there'll be many other things to focus apart from the reinforcement. There'll be connection to the adjacent part. There'll be any fixtures. In fact, I'll just give you a list of it, what all things are there when you are working with a precast project that precast wall element. Similarly, you have the form shutters, which is already connected with the tilting table. And once you have placed your reinforcement, you have quality checked it and everything is in place, then what you do, you do the concreting of it.

And you start pouring the required concrete onto it. And once the concreting is done, something of this sort, you have your element being casted. So you have poured the concrete. Uh, it. It takes some time to settle down. But bear in mind, unlike doing and like we do in the cast on site concrete projects where which basically it's left for 14 days or sometimes 21 days also for querying for curing and so that it gets the actual strength that on in a precast project, the curing process is actually speeded and it's only the matter of two or three days.

the elements are done and taken right off the table. But bear in mind, it does not reach its full strength that it would have at the service stage. So let's say if a particular wall element is supposed to have design strength of M40 at the service stage, so at the lifting stage, you could assume that it will only reach to maybe M25 or M20. These are the things that you actually need to ask if you're designing an element for lifting stage and you need to ask that what exactly the accomplished strength would be when it's being lifted because they do not actually sit and let the element cure for that longer period.

So actually the whenever you are designing for the lifting stage for whatever forces be whatever support mechanism what you are doing, you'll have to actually have the strength or reduce strength not exactly the full strength is very seldom that people wait that much long because then again the time saving factor is actually lost. As we were talking about the lifting of it, let's say if this element, if this element is not casted all to a tilting table, it is casted on a form only then this will have to be lifted like here or from here or maybe you can lift it from here as well.

You can put the lifting insert here as usually lifting inserts are push put but again once you lift it like that and this part will be resting on tilting table what would happen that the whole element would bend under its own weight and you'll have you'll need heavy reinforcement which is in a wall element you can actually live with very lesser reinforcement also if the in plane forces are not much and you can actually be with minimum reinforcement also. But if you are lifting it like this, this would actually cause the element to bend but as I told you this is not the conventional way of doing we do not actually lift the element through these we actually on a tilting table what do once the casting is done after two or three days the elements are actually tilted at an angle of 70 degree with the help of the tilting table and then they are taken off the tilting table.

That's all they are done and once that element is taken off the tilting table then it's not no longer bending in its own weight and then it need not to have that much reinforcement that it would have have if we are lifting it through like a ground lifting. Once the demolding is done you have taken the element of this mold then you need to put it onto the A-frame which is something like this as I had already shown you in the image also this is an A-frame that we have and once we have that A-frame that A-frame that A-frame is actually also so here in blue that you see is the A-frame and all to onto the two wall elements are stacked and these will be taken to site so that's the mostly phenomena that we follow that is there there could be some in some projects in which actually the elements are ground lifted those are the projects which we have in which are site based plant which is basically the as I told you in the first two three slides that there are few projects which are actually not factory and not factory beds plant we have we have side beds the plant very near to the project site their element might be lifted from the ground for that that reinforcement would have that wall would have much reinforcement because it will have to be checked for bending on spout of lane bending so again this is one thing that to focus that you always ask your project manager or the manager or the manager or the manager or the manager or the manager or the manager that how they are planning to lift this element these are need to be answered right at the beginning of the project because it affects some of the things one more thing that I did talk about which was I think this part which is basically what additional embeds that we have in the wall element apart from the reinforcement it will be MEP conduits MEP fixtures MEP is nothing but I think some of you would already know but just to make it clear MEP is nothing but mechanical electrical and plumbing fixtures MEP conduits could be there MEP fixtures could be there connection components structural connection components to connect it to the adjacent element that we have there are lifting inserts and there are propping inserts also that we did see in the fourth image in the last slides now again we will move back to the slides so moving back to the slides next we take some typical precast elements that we have in a project so in a project there could be multiple types of precast element here we take certain examples but bear in mind these are not this is not an exhaustive list in fact there cannot be an exhaustive list to per se because there could be enormous amount of element in fact when you have worked a lot in a precast project you can say that you can actually customize the elements that you have you can actually think the element of your own in terms of when you need them to be how you need to actually think in terms of solutions not dwell much more there and let's focus that for what all typical precast element that we are taking so here you can see a precast typical precast element which is a free filigree slab panel some of you would have heard about this so it's not exactly a purely precast system it is a semi precast here you can see a precast bed of a thing and over that you can see the v shape rebar going like that so it's actually a semi precast system so maybe let's say for design wise if you want for a particular span of let's say 5.2 meters or 5.3 meters you needed a slab thickness of maybe 200 let's say it might be less or more depends upon the load though but let's say if you need it 200 so you can what you can do you can actually have a filigree solution a filigree solution is what let's say 70 mm of it actually would be precast and it will have some protrusion of the reinforcement coming out of it and the rest of the concrete which is basically let's say it's needed 130 mm is further needed 70 mm is there the rest 130 mm is actually done at site what you are gaining out of it because if you are doing it 130 mm with the site you are actually gaining in terms of that you don't need to do the form work for that particular element right because this element itself can act as a form and you can do the concreting over it but bear in mind the concreting has will take some time again again I wouldn't say that this how you can ask that how it precast is you are doing something on site also but yeah as I told you this is semi precast it's actually done depending upon the requirement of a particular project and I must tell you these are also very very useful slab element that one does similarly we'll talk more about this in the coming when we take on detail precast element type of various type of precast element we'll talk more about these as well here you can see the hollow core slabs some of you would have heard the hollow core slabs there is a reason why these are called hollow core because if you look at these images over here what it has actually it's usually the typical slab element distribution of load is in one way rather than a two way spanning slab because that's the mostly the way precast slabs are we'll talk more further as we dwell into the design but here you can see usually the hollow core slabs are 1.2 meter wide uh the 1200 mm is the width that you have of a typical hollow core slab uh the thickness I must say can be varying depending upon the manufacture that you are working with but again uh it varies from 200 to 220 to 270 projects you can get 300 320 300 380 uh 400 in fact now people are promising in hollow core up to uh depth of 500 or so now what you are gaining here what you are gaining here what you are gaining is basically since as per the bending phenomena at the neutral axis we don't need that rain that concrete section to be there because it is less in stress we need more stresses at the edges so that's an innovative solution they basically they have reduced uh they have put the course which is basically a hollow sec uh course between the uh the slab element and the slab element and the slab element and actually they are gaining in terms of because they have reduced the load of the slab itself uh but actually what you are gaining is you are gaining much more since the dead load is less the actual load it puts onto the design will be lesser but it can support a higher span further these slabs that you have could be priestess could be non-priestest also but nowadays you will seldom find projects where you are non-priestest holocaust slabs are used usually almost uh in almost uh in almost all the projects the pre-stress all of course labs are used uh onto the third image over here you can see a nice looking precast here a flight this is basically half of a stair it could be the other flight uh is not shown in the image but it is as you can see it actually has a certain sets and riser uh going from uh here to here and it's actually working as a particular uh beam one way beam supporting one way slab though supporting like that uh having one support over here and one support over here further these elements are supported on a wall or a beam below the complete reinforcement and the finish that you get to the precast chair is uh much much more than a cast in situ project we will uh slightly talk about this but won't dwell much onto the design but uh there are various manufacturers who are doing actually the precast chairs now coming on to the uh i think this is the most interesting thing uh the sandwich walls sandwich walls as the name say is actually a sandwich sandwich Why they are sandwiched is basically, here you can see, here you have three layers in fact, one layer is actually of concrete, in between you have insulation and then outside you have a facade and in this particular image it is also shown there is some lucrative facade which is also there.

So, this is again a requirement of a region which is geographically having much much heat insulation requirements. So, if it is a very cold environment as we have in our Indian climate during near the mountains and all where it is very much cold and you need to conserve heat of your building and you can gain much from it. So, that's it. Otherwise, in European countries or in western countries where it is much more important to actually conserve heat of your system so that you don't spend much on in terms of electric equipment to heat your building further.

So, the insulation is used. Here you can see that this panel that you have in the inside is actually the structural panel which is actually taking the load. Insulation which is actually working as a barrier for heat that is inside and outside so that it can conserve the temperature and this is the facade of all that here which is basically only for reviewing purpose. Now, you will, why these are precast and this is not because this element is casted separately and this is insulation is poured separately and this is done separately.

Actually, as I told you the tilting table phenomena, the whole thing, the whole assembly, the insulation, the facade, the opening, everything can be done at the very tilting table, cast it together and brought to the side. But, bear in mind the way of construction is a bit different that I told you. The way of construction that I told you on a tilting table, I told you for an inner wall only which is basically it doesn't have an insulation element which is with insulation is casted differently.

You first cast this, then you place insulation over it and then you place this, this facade layer and then you connect them. It's basically, it's, that's the way it's usually done, not the conventional way of doing a precast inner wall. So, these were mostly the things, types of elements that we covered but there will be many elements that we can have in a precast project. It's not very limiting to these four that I've shown, it's an exhaust, it's not an exhaustive list, there can be a lot of elements that you can have.

In fact, as I told you at the very beginning of the slide, you can have, you can actually propose of your own. That's the way actually, once you grow to be a good and effective precast structural design engineer, you'll actually start listing your solution in terms of connections, in terms of elements. Now, the next slide, we are talking about connections, I talk about few connections of, from a certain, so that you just get a big, although we'll be talking much in detail when we move further into our building that we have.

So, here you can see some nice looking connections that we have, here you can see a wall shoe connection, why is it called wall shoe, I'll just tell you. So, here you can see a pad foundation, a strip foundation for wall, above that you have wall element and above that you have another wall element. So, wall shoes are something of this sort, so here, if you try to understand this as one assembly, not two assemblies, so this square pocket and the long bars that are going with this, that is one part of the assembly and another part of the assembly is already put in the foundation, which is as an anchor bolt.

So, from the foundation, if it's mostly cast on place, you will be having the anchor bolt coming out and within this precast element, which is actually already done at site, you will be having this box along with this rebar going out and then you will be placing your element here and bolting it. And further, this element, this box is grouted off so that there is no chance of corrosion or anything. The connection is very effective in terms of taking good amount of tension when there is any uplift at this, the wall shoes are preferred.

Similar connection is opted when you have wall to work connection, which is basically, this could be one foundation part, the second element is this and the connection is done and the third element is just above it. Here, onto the next image, it's another very nice looking connection, which is a hollow core slab and wall connection, the slab element, hollow core slab element is actually supporting onto the wall. Here, you can see the wall is actually a notched wall, the whole wall is hidden and thick, but here you have a notch.

Now, when you say that, why do we put a notch, something like that, there is a reason to it. Also, I'll just tell you about it more when we move further. As you can see, there is a cast in place concrete also over this cast in place screen that is called. The reason for that is actually with precast blank, since these are flexible and casted separately, you need to actually have some reinforcement to be placed with them, some cast on site concrete placed with them, so that actually you can generate a good diaphragm action and make it a semi-rigid diaphragm to transfer the lateral roots.

Here, you have some reinforcement coming out from the wall and another sort of a U-bar being placed at the site and the concreting is being done. Everything has a reason and that's why it's looking like this. We'll be talking much more in detail once we move further, but as of now, you can think of this as a wall slab connection. There could be multiple ways. If you don't have a hollow core slab, let's say you have a filigree slab, the connection could be a bit different, but the principle remains same.

So, we need, the idea is that one needs to, one learns the principle. Another connection, wall wall insert plate connection. So, here we looked at the connection, which is basically wall wall vertical connection. Similarly, if let's say there is an implant, there is another wall going like this. So, what is going to be the connection looking like, looking with this. Here, 3 and 4 is actually the two example of that, which is basically, here, one you have the insert plate, which is going something like this, which is basically two walls, how it's going to be connected.

It is a welded sort of connection. And here, it's a wire loop connection. Wire loop is another very special type of connection, which you wouldn't have worked, wouldn't have heard if you have not worked with precast. It basically gives, here, first let's talk about this connection, here, this connection that you have, this wall over here has, has an insert plate. Similarly, the other plate has an insert plate. Insert plate is nothing but a steel plate exposed to one side so that it can be connected to the others, to some exposed member somewhere, somewhere over here.

And then it had some stud going into the concrete so that it can be developed for whatever forces it has been designed for. When you bring these two elements inside, very close to each other, then you put the reinforce, then you put your steel plate and weld it. Further, similar as we grouted this joint off to avoid any corrosion, this key also is further grouted off. One more thing, always remember, two precast element of any sort, they won't be just put together. There will be always some tolerance between those two, because if you don't leave the tolerance and if you put them very close to each other, let's say if you put this wall directly above this wall, then there will be always seepage, there will be water issues.

So, always the two precast element are left at a certain space and then those things are actually grouted so that you actually leave any chance of seepage or water leakage that could happen. Similarly, over here, the same connection here, it's a bit very good connection with in terms of key that is there. All the wire loops are not helping much in terms of capacity, but this key that you have, once you pour concrete from top and fill it, then it will have much more capacity because of this indentation that it has because of this key only, not the wire loops that are helping.

So, wire loops are something of this sort, which is basically, as you can see, there are three wire loops going through this wall and there are three wire loops going through this particular wall. So, this actually work in pair and in between, you can see a small bar, which is a dowel pin, which the purpose of is actually it's hold to hold this complete wire loop in place. And once you put the dowel pin in, this dowel pin is actually brought at site once these wire loops have been assembled one over another and you put dowel pin into it and then you further do the concreting.

What it is actually helping is, it's helping you get a good connection in terms of out of lane share or in plane share also. Out of lane share is not much achieved with the help of wire loops per se, but key does help. So, these were mostly about a few connections that we did talk about. So, now let's move to the next slide.

Want the rest of Structural Design of Highrise Precast Buildings using ETABS?

Get the full course syllabus and fees.

The full course is paid (₹40,000). We'll send the syllabus and call you back within one working day.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Full course · paid

Unlock the full Structural Design of Highrise Precast Buildings using ETABS course

The remaining 53 lessons, mentor-reviewed projects and a certificate come with the paid course (₹40,000). Leave your details: we'll send the syllabus and fees and call you back.

Get the syllabus and fees

A counsellor calls you back within one working day.

By submitting you agree to our Terms and Privacy Policy.

Grow by Skill-Lync · free lesson

Start watching

Free, no payment. Leave your details once and every free lesson on Grow plays straight away. A Skill-Lync counsellor may call you about the full Structural Design of Highrise Precast Buildings using ETABS course.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.