Choosing a Concrete Bridge Form by Span, Site and Construction

A free lesson from Skill-Lync's Design of RCC and PSC Superstructures using LUSAS course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Designing Concrete Bridges”

What will you learn in this free Design of RCC and PSC Superstructures using LUSAS lesson?

The instructor explains why concrete suits bridges, then how usage, site, labour, construction method, sustainability and looks drive form selection. The lesson compares solid and voided slabs, ribbed slabs, precast beams, box girders, portal frames, composite girders, arches, extradosed and cable-stayed bridges against typical span ranges.

  • Why concrete is chosen for bridges
  • Factors that drive bridge form selection
  • Advantages and limits of each bridge form
  • Reading a typical span range table

What comes after lesson 3?

Later in Skill-Lync's Design of RCC and PSC Superstructures using LUSAS course (paid): lesson 4, Skill Link Course on Bridge Superstructure Design; lesson 5, Performing Analysis and Adjusting Beam Dimensions in Simulation; lesson 6, Structural Checks and Calculation of Ultimate Capacity. The full course has 48 lessons (22 h 51 min of video); see the course overview or its price and syllabus.

Lesson transcript

Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.

Now that we've covered some basics about concrete as a material, and we've looked at a few examples for cracked and uncracked concrete sections, we can apply that knowledge in design of concrete bridges. First of all, let's have a look at why we use concrete in the bridge construction. The first and the main reason for use of concrete in the construction of bridges is its durability. Because concrete is alkaline, it protects the steel reinforcement from corrosion, and there are examples of concrete that has lasted for hundreds of years, and early versions of concrete were invented by Romans, and they've been around for thousands of years.

So it's really a good and durable material if it's designed well, and it is really good for use in bridges, because bridges are important pieces of infrastructure that must stand for at least 100 years or more. The other thing is economy. Concrete is one of the most spread materials, both in terms of material availability, but also in terms of skill availability. Concrete can be worked by a lot of people in a lot of different countries, so it's a good choice for a low-cost and high-quality solution.

It's versatile. You can achieve a lot of forms from concrete, unlike other products like steel, which come in certain size or require a lot more work to fabricate custom components. Concrete can really be used in a variety of different forms, conditions, environments, and aesthetics. There are people who don't like concrete, but concrete in bridges can be very beautiful if designed well. Now, we'll cover some form selection. When it comes to form, there's definitely not a single way to span a gap. There are a number of factors that affect the form selection for the bridge.

First of all, its usage. Is it a cycle bridge? Is it a road bridge? Or does it carry a railway? There are various site constraints. It can be spanning a river, spanning a valley, spanning another road. Labour and material availability is also an important factor. Steel bridges may be popular in some countries, but concrete bridges may be popular in other countries. And some forms are easier to construct in low-skill environments, and some forms are easier to construct in high-skill environments and high labour costs. We operate in the construction industry, and availability is not always there.

Concrete is used in other applications, such as buildings, dams, other projects, so it may not always be available for your project. And that sometimes can define your form. Construction sequence and plant availability are also a major factor, because some forms are easier to construct in certain locations, and some are harder to construct in certain locations. And then some forms are more economical, more sustainable, and more beautiful. So there are really a lot of factors that come into play when selecting a form of a bridge. Let's look at each of these constraints individually.

So usage type is the primary driver for form selection. Whether it's a footbridge, a roadbridge, or a railway bridge, will define all the functional criterias, such as width, and also the loading that it needs to carry. Footbridges will carry a very small amount of load, whereas heavy railway bridges will need to be a lot bigger, a lot sturdier. Here are some examples of really nice bridge forms. Concrete is an ideal material for footbridges, because as well as its structural properties, it can be quite aesthetically pleasing if designed well.

For example, like Millennium Bridge, which is a nice slender stress treatment, or Kingsgate Bridge, which is a classic of concrete design. A good additional property of concrete is that it's quite heavy, and it's got really good dynamic properties. So unlike steel bridges, which can be quite shaky, concrete design bridges are really sturdy and really solid when you're walking over them. Concrete can also be used for road bridges, and in fact, most of the road bridges you see nowadays are actually concrete bridges. These type of pre-stressed concrete bridges are commonplace all over the world, because they're easy to build, they're very available, so the skills to build these bridges and the knowledge about them is available throughout.

You can also see concrete arches and even some big cable-stayed bridges erected using concrete. Concrete is not uncommon for railway applications as well, such as these are examples here. Glenfinnan Viaduct in Scotland is more than 100 years old. It's been built in the late 19th century, and has been featured in Harry Potter movie. It's one of the earliest examples of modern concrete. As you can see, solid concrete piers and arch spans have been around for a long time. This bridge in China is spanning an incredible valley with really tall piers and incredible spans.

Sight is another important inspiration when choosing the form of a bridge. For example, if you're in a field, like this High Speed 1 viaduct in the UK, shorter spans and more piers will be favourable, because it's very easy to construct foundations in a flat ground. If your site is spanning a massive river estuary, such as this bridge here, Mersey Gateway Bridge in the UK, very long spans and fewer foundations are favourable, because it's very difficult to build foundation in this river estuary. You'll see that as soon as the bridge reaches ground, it will come to a more cost-effective short-span solution.

Labour material and skills availability is also extremely important when selecting a bridge form. In countries where labour is cheap and materials are relatively expensive, such as in developing countries, you'll find that in-situ solutions are preferable, and shorter span, low-skill type of bridges are more common. In more advanced applications, such as in Europe, in the US, you'll find that the labour is very expensive comparing to material, and it's better to prefabricate elements and build things off-site. Construction methods are really important when selecting a form of a bridge.

Depending on who you're working with, depending on your contractor, you might choose an in-situ solution, like in here. The most basic form, of course, is just pouring the bridge on-site, like you see this big slab being poured on-site, using typical formwork. If you have a more specialist fabricator, and if you have big volumes, you might want to invest into a movable scaffold system, like the one here, where you'll be able to reuse formwork. If you're working with contractors that are favouring pre-cast solutions, or if your client favours pre-cast solutions, you can use pre-cast rental construction, or even the whole segments of the bridge, or big bridge beams that are prefabricated.

If you pay close attention to the photos on this slide, you'll see how the site dictates form selection again. On the left, where you have ground access, short segments and bulky members are preferable, because you can simply lift them using a movable tower. In here, where you're spanning a river, lighter but longer segments are preferred. Here, they're using a tandem lift to erect beams very quickly, because I bet they don't want to block this waterway for a long time. Should this bridge here on the left be spanning over a road or a live railway, they might have chosen a completely different solution, because they wouldn't want to disrupt any of the operations.

One thing is certain. As a designer, you can't simply make up a form without considering any of these factors. You have to consult with your contractor to create the most cost-effective and the easiest to construct solution. Sustainability in bridges is also extremely important. You always have to consider the carbon footprint and also how your bridge is affecting the local wildlife and biodiversity. This bridge in Scotland was launched only from one side, the other side in this picture, in order to not disrupt the environment and livelihood of the animals on the other side.

So you can see that because you have a very biologically sensitive environment on one side, you're choosing a construction sequence that's working from the other side. So your wildlife defines how your bridge is constructed. And that's very important consideration when choosing a form. Aesthetics is a major feature as well. Some of the well-known bridges, like these two bridges in Switzerland, are an example of extremely good quality bridge design. When designing a bridge, always think that this structure is going to be there for hundreds of years for other generations to enjoy.

It is not uncommon for bridges to become local or even national landmarks. So, we've talked about all of the factors that affect bridge form selection. Now, let's have a look at some actual structural forms that we can use in bridge design. I'll cover some forms that are discussed later in this course, and I'll also show you some advanced forms, as well as their disadvantages and advantages, so you can select a form of a bridge for your specific site. Let's start by looking at solid slab bridges.

They are perhaps the easiest bridge form to design. They are very easy to build as well. Require... They're in low skills and very simple materials that you can probably buy off-shelf in most countries. These bridges are very good because they don't really need that much skill to design and to build. The disadvantages of them are that they're very inefficient and they're only valid for short spans. They also require formwork, which needs to be supported off something. What you'll find is, if you're supporting it off the ground, that you will be blocking whatever you need to span.

It's not feasible if you're building over the river. And what you'll find is, if you're trying to span over the river, you'll need to build a formwork first, which in itself is a bridge. So why do you need a slab? If you're building over the road, you need props underneath the bridge, which will block the roadway. So it's not always the most suitable scenario for the bridge. But if you're building short spans in a field, it's an ideal type of bridge. Next, we'll talk about voided slabs.

Voided slabs are very similar to solid slabs, but you'll have voids formed by specific filler. They're much more efficient because you're saving some weight in the middle of the bridge section, where it's not very effective, and you're keeping the material where it's really needed. It's considerably more lightweight than a solid slab, but the voids formers tend to be quite expensive, and so they diminish the savings on cost. So voided slabs are not hugely common. They're only common where you need to span a slightly longer length than the slab, but you don't want to go for a more sophisticated solution.

Next type of bridges that will be covered in this course, in week 4, is the ribbed slab. They're a lot more lightweight than solid slab, in order of a couple of multiples lighter than the solid slabs. They can be used in locations where your spans are bigger than solid slab and bigger than voided slabs, but where you don't want to go for a precast solution. A precast module of formwork can be used to construct economic bridges, but you tend to find that this form sort of sits in between the voided slab and the precast solution, so you tend to go for one or the other.

However, this type of bridge is very useful to demonstrate concrete design, and it will demonstrate the efficiency of this sort of form, so it will be covered in our course, regardless of its use. The other very popular type of bridge is a precast beam bridge. This utilizes pre-stressing strands rather than reinforcement, and it's a very common type of bridge. The beams tend to be prefabricated and delivered on site in big pieces, with a slab cast afterwards. You can see recess here for the formwork that allow the fabrication of the slab on top of the existing beams, so it requires minimal formwork comparing to the solid slab.

You'll find that pre-stressing is much more efficient than reinforcement, and it also allows you to design without cracks in SLS. In many countries, standard precast sections are available and are easy to buy and procure. Precast sections also mean that you achieve a much better quality concrete, and you also can construct your bridge very fast without disruption to the traffic, as we saw with a tandem lift over the river in previous slides. It minimizes wet works on site, because it only needs a slab that is cast in situ.

The rest of the components are prefabricated. You'll learn a lot more about why casting in situ is not always a good idea. For one, you'd have to wait for 28 days for concrete to reach its full strength, delaying the construction, whereas if you bring a beam, it only takes a day or even less to lift. Wet concrete is also not very good for health when you have construction workers on site. It's much better to fabricate concrete in controlled factory environments. The only real disadvantages of these type of bridges is if you're delivering big beams, for example 25 meter long beams, they can be very heavy and not very easy to transport.

You'll require specialist transportation and also require specialist lifting equipment. And specialist lifting equipment can be quite difficult to procure. It's not always available on site. That's why all of the savings in terms of program can be lost if you can't procure the right equipment. In many countries, transportation of big pieces requires a complex process of approvals, and that can also delay your construction. But if you're very familiar with the process and you have good availability of kit and plant on site, this type of bridge can beat almost anything.

However, there is a limit on the spans that can be achieved with this type of bridge. Where precast beams cannot span the required gap, you tend to go for big, bulky, box girder bridges. This type of bridge is very efficient for long spans, and it can be built in situ, prefabricated, depending on your requirements. Another huge advantage of this type of bridge is that it's very good in torsion. We'll discuss it in week 6 when we're covering this bridge form. But just remember that fact. There are many ways in which box girder can be constructed.

For example, using a false work, like a slab bridge, using a movable scaffolding, span by span, precast segmental, like we saw in one of the slides before, and by loaching, by balanced cantilever. So it's a very versatile and very efficient bridge form. The only problem is, it's quite complicated in terms of form work required, and in terms of skills needed, especially for pre-stressing strands in situ. It requires really stringent quality control. Because of the spans, the risks are much higher. The other big disadvantage in terms of safety is that it's a closed box, and a closed box is by definition a confined space.

It's quite difficult to inspect girders that are not at least a full person's height. So it can be less favorable in some of the countries where health and safety is very important. And that health and safety culture should actually spread to the entire world. Luckily, box girder bridges tend to be most economical, where the gap is at least a person's height anyway. So that problem is often removed by default. So it's a very competitive bridge form for long spans, and it's very common in design. Its closed solution also provides a nice clean section on the outside.

So it's favored by the architects and clients alike. A very common form of bridge for short spans is a porthole bridge, which is effectively embedded into the soil. This is not a section of a bridge like we saw before. This is actually a long elevation of a bridge. So you can see you have an abutment wall and a bridge that's spanning between the two walls. The big advantage of it is it doesn't need any bearings and joints, and so there's less maintenance or virtually no maintenance required for it.

However, it does have limited spans, and it is quite complicated to design. We will cover the design of border frames and other types of integral bridges, or bridges without bearings, in week 9. Although this course focuses on concrete bridges, we will also briefly cover composite construction, where you use steel girders or other types of steel elements with a concrete slab that's composite. This is a very common type of bridges, and it's got many advantages over some of the concrete bridge forms. It utilizes the advantages of both materials, steel being really good in tension, and concrete being really good in compression, and it is even more lightweight than the most efficient concrete bridge, like box girders or ribbed slabs.

So, it is very useful in applications where weight matters, for example, when you don't want really heavy foundations, or if you have limited availability of lifting equipment, steel beams are much easier to lift on site, because they're much lighter comparing to their span. The typical Igerder bridge with a concrete deck is a big competitor of the precast type bridges. You'll often find them over railways and over live roads, because they're very easy to construct. They are slightly harder to design, because steel is very slender and is prone to buckling, especially during construction, so there's a lot more consideration that go into the construction sequence.

It's also requiring design of two different construction materials, using two different types of codes, and it can be a little bit more difficult in design. However, an experienced specialist will most likely design any type of bridge without any problem. And so should you, after week 10, when we cover this type of bridge. There are other advanced bridge forms that will not be covered in this course. For example, stress ribbon bridges are extremely slender and efficient. They result in a beautiful form, but they're quite complex to design.

They rely heavily on tendons embedded into the concrete, and they're quite advanced. Some of the bridges can use even carbon tendons instead of steel. The shape of the bridge precludes it from being used on road and railway bridges because it relies on this sagging form for it to work. And so they're not very popular because if a car drives over a bridge like that, they would notice bumps. However, it's unrivaled in aesthetic appearances in pedestrian bridges. The other disadvantage of these types of bridges is really high horizontal tension at the ends.

Because it relies on this catenary action, there's a huge horizontal pull at the supports, which must be resistance and transferred to the ground level. Art bridges are perhaps the most ancient and the most effective views of concrete. Arches work completely in compression and they utilize concrete in its strongest. They require less reinforcement because they virtually have no tension in them except for the deck and they're very beautiful. However, they do require a big depth in order to form an arch. They're more common in deep valleys where you have big spans and you have a very big construction depth.

They'll be less common over bridges and railways where you prefer flat solutions such as beams and slabs. And you also have limitations of gradients, so you want to minimize the difference in levels between the two road surfaces. However, in mountainous applications, these types of bridges are very common. The design of bespoke arches is quite complex and the analysis required is quite advanced. So they won't be covered in this course. But do bear in mind that these types of bridges are also quite common. An important issue when considering an arch shape is that there's a big horizontal thrust that's required for the arch to act.

As you push an arch down, it's trying to spread. And if it's not resisted by another arch or by a rock foundation, it is quite difficult to achieve. In some cases, you can use a tie to resist that thrust internally, but that closes up the gap between the two supports and it might diminish the purpose of an arch bridge. We'll not be designing these arches, but do bear that in mind. Another common type of bridge is an extra-dose bridge. This type of bridge is very specialist and it's allowing you to span much larger distances.

It is an in-between land for girder bridges and cable-stayed bridges because it uses the deck and bending and the towers for support as well. Using extra-dose bridges, as opposed to box girders, can reduce depth over the piers, making it appear very slender and sit at a much lower level, for example, as in this application. They're very cost-effective for moderately high spans. And the final type of bridge that we will discuss is a cable-stay bridge. These bridges are very specialist and they're only used for extremely long spans, specifically to cross over big obstacles like rivers and some massive highways.

It is the most efficient form in terms of material use, but it's quite complex to analyze, design and construct. And although you're spending less on the material per square meter or per meter of span, the construction cost and design costs can often result in a more expensive solution. So you'll often find that these types of bridges are only used when other forms of bridges are impossible. For spans that are much longer than this, you tend to use steel bridges, such as steel cable-stayed bridges and steel suspension bridges.

Now, we've discussed quite a few different forms, and I decided to summarize them in this table, which is an extract from a Concrete Bridge Development Guide, Technical Node 14, Best Construction Methods for Concrete Bridge Decks. Each column represents a typical span you will see for a bridge, and each row will explain different bridge form. Solid cells indicate a typical and the most cost-effective span range for a bridge. For example, solid slab will be effective for about 10 meters, and cable state will be effective at about 200 meters.

Where the cells are slightly shaded, this is where a bridge form is possible. For example, a precast portal arch or a weather slab are possible up to 30 or 40 meters, but they're only economical up to 20 or 30 meters. Please study this table really carefully and take a note of it, because it will be very useful when doing quantum design for bridges. Now that we've discussed different types of bridges and bridge forms, and we've talked about their disadvantages, advantages, and we've seen the span tables, let's look a little bit more into depth of sizing the bridge to a specific site.

Full design of a bridge is a time-consuming process. It can take between weeks and months and even years to design a bridge. We can't wait so long to give our client an approximate solution. And we often, as engineers, use simplified examples, or as we call them, rules of thumb, to size the bridges in the first place. The rules shown here and in the next couple of slides are approximate and shouldn't be replaced by years of experience, but they give you a really good start and will allow you to size a bridge for a specific site without spending too much time on it.

The first very common rule to use when you're designing a concrete bridge, or in fact any bridge or any sort of beam, is span-to-depth ratio. Span-to-depth ratio is a ratio between a span of a bridge, between the two supports, and its height. As I've already mentioned, this is a very, very approximate rule, so it doesn't replace your design. It's just allowing you to give its initial size. These tables are shown for continuous bridge construction, so where a bridge is continuous over support, but for shorter spans you can use it also for simply supported cases.

For example, if you're designing a road bridge as a composite slab, you can use a 1 in 20 rule. So, if your span is, let's say, 20 meters, then you want your overall construction depth of 1 meter. Or, if you're designing a railway bridge in concrete, let's say we want a box girder. Have a look back in our span tables, let's see. Say, a 100 meter span. 100 divided by 12 is about 8.3 meters, which is quite deep and seems unreasonable. So, you probably want to consider a much more efficient form, maybe an arch or maybe a cable state bridge.

Or, you can use other tricks to make your box girder more efficient, and I'll discuss them in the following lectures. Another rule of thumb for continuous bridges is limiting the end span to about 0.6, 0.7 of a typical span. And I'll explain why. If you look at the bending moment diagram for this bridge, you'll see that if you made all of the spans equal, the middle spans are continuous. So, the peak moment at the pier is relatively small. But for the end span, it's kind of partially simply supported.

So, from one end it's simply supported, and from the other end it's restricted by rotation. So, this support will attract more load, and it will also attract more bending moment. So, what you tend to do is you tend to shorten the end span to reduce the moment and to allow you to use the same section throughout this bridge, which will cover you for typical piers and for typical spans, as well as for the end span. Another rule I want to show you is haunches. So, in the example of that railway bridge that I said would require a very deep section, we can still use box girder without having such a huge and deep section, but you can use haunches to make the structure thicker at the piers and thinner at the spans.

This makes the construction a little bit more complicated, but it does provide you a more efficient section, and it saves you on material. So, it's a balance. You might save a little bit on material, but it will be more expensive on construction. So, overall, the price will probably be unaffected anyway. But typically, you'd want to use it only for spans over 40 meters, because for shorter spans, it's much simpler just to build a simple, continuous, equal depth span. And for 100 meter spans, like we've used in the example, this type of efficiency saving is essential.

Otherwise, you're using unreasonable amounts of material, and you're increasing costs by quite a lot. So, let's use that 100 meter example. If you have 100 meters main span, then divided by 15, or a bit more, maybe 16, you'll get a 6 meter depth at pier, which is still quite a lot, but it's not unreasonable for a big bridge. At mid span, divided by 50 or 30, you get in between 3, 2 meters in the middle, which is about a person height, and that's an ideal sort of size for this type of bridge.

And if you have a 100 meter main span, you'd probably want to consider your spans. Side spans to be 60 or 70 meters. You can see this sort of rule clearly on the Chinese bridge example here. I guess this span is about 100 meters, judging from the size of the cranes. So you can see they're using efficient materials to make the structure most slender in the middle and deeper at the piers. You'll also notice that taper down to a reasonable depth at the end pier, and the spans are a nice ratio of about a half or 60% of the main span.

What you'll also see is that as soon as they reach the abutment, they start to use very slender and short spans, which is probably governed by cost. Here again, you see a very constant depth because the spans are short. There's no point for introducing haunches. And I guess that span is about 25 meters. And you'd probably see that that is about 1.2, 1.5 meter depth, following about 1 in 12, 1 in 14 height to span ratio, which is not uncommon for high-speed railway bridges. For high-speed railway bridges, the span to depth ratio should be kept fairly reasonable because it affects the dynamic behavior of the bridge.

When looking at bridge cross-sections width-wise, there are also some rules we can apply. For example, for composite construction, you don't want the slab to span more than 1.5 to 3.5 meters transversely for it to be efficient and for the depths to be maintained. You shouldn't also use cantilevers that are more than 1.2 meters if they're not supported somehow or reinforced. For precast beam solution, you tend to have a distance of 1 to 2 meters and maybe only a half-meter cantilever. If you want to use a bigger transverse depth, you want to use some cross-members, like this cross beam.

What you can do is you can use these span to depth ratios even for the transverse members. They still hold in place. For example, if you have a shallow transverse girder spanning between two main eye girders in steel, you would probably want a 1 in 20 depth, which is compatible to a composite bridge sort of ratio. If you're talking about concrete ribs spanning between two main concrete elements, 1 in 15 ratio will be more reasonable because of its weight. For cantilevers, you tend to go for 1 in 7, and it's a very good idea to taper your cantilevers so that they're more efficient.

We're now coming to the end of the lecture. The only thing that I want to share with you is some useful resources on sizing of bridges. Concrete Bridge Development Group have developed this technical node 14, which is very useful, and this is where the span table came from. They also have very good commentary about bridge form selection and efficiency. For composite bridges, there are plenty of resources from SCI and BCSA. A particularly good resource is this website. It's all free of charge, and you can access it quite easily through the internet.

So, let's summarize what we've covered today. We've gone into theory, and we've talked about what concrete is made of. We have looked at some concrete properties and how they develop with time and with different material additions. We've talked about strength classes and how materials are classified and tested. We've talked about behavior, mode of failures of concrete. We've looked at uncracked and cracked section property examples. We have discovered about limit state design for concrete. And we've looked at some form selections and how you can size the bridges quickly and reasonably without spending any considerable amount of time.

Thank you very much for listening, and I will see you in the next week. We'll see you in the next week.

Want the rest of Design of RCC and PSC Superstructures using LUSAS?

Get the full course syllabus and fees.

The full course is paid (₹40,000). We'll send the syllabus and call you back within one working day.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Full course · paid

Unlock the full Design of RCC and PSC Superstructures using LUSAS course

The remaining 45 lessons, mentor-reviewed projects and a certificate come with the paid course (₹40,000). Leave your details: we'll send the syllabus and fees and call you back.

Get the syllabus and fees

A counsellor calls you back within one working day.

By submitting you agree to our Terms and Privacy Policy.

Grow by Skill-Lync · free lesson

Start watching

Free, no payment. Leave your details once and every free lesson on Grow plays straight away. A Skill-Lync counsellor may call you about the full Design of RCC and PSC Superstructures using LUSAS course.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.