Origins of DFMA: History and the Goals It Supports

A free lesson from Skill-Lync's Design for Manufacturability (DFM) course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Manufacturing Basics with DFM”

What will you learn in this free Design for Manufacturability (DFM) lesson?

The instructor defines design for manufacture, design for assembly and DFMA, then walks through a timeline from Oliver Evans' conveyors in 1793 to Whitney's interchangeable musket parts, Henry Ford's assembly line and early industrial robots. It closes on the three aims of DFMA: manufacturability, interchangeability and automation.

  • Definitions of DFM, DFA and DFMA
  • Timeline of assembly automation from 1793 onward
  • What interchangeable parts mean, with everyday examples
  • Why automated assembly needs supporting design features

What comes after lesson 1?

The next free lesson is lesson 2, “Benefits and Cost Impact of DFMA on Product Design” (17 min). Later in Skill-Lync's Design for Manufacturability (DFM) course (paid): lesson 4, Mechanical Design Process Overview; lesson 5, DF Analysis Worksheet: Theoretical Minimum Part Count; lesson 6, Determining Base Parts and Evaluating Assembly Movement. The full course has 30 lessons (11 h 8 min of video); see the course overview or its price and syllabus.

Lesson transcript

Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.

Hello everyone. I believe everyone is doing good. I'm here to give you training on manufacturing basics with DFMA and I also assume that you all belong to mechanical background so that you can understand the mechanical terminologies used in this entire training module. To give an introduction, this entire training module is divided into four divisions. Each division is for a week and we are going to explain about each week whatever topics we are going to explain in the entire week that will be explained in the beginning only.

And yes, we can start now moving on to slide two. So here are the table of contents which says that we are going to explain the birth of DFMA, how DFMA came into existence, then the purpose and benefits of using DFMA, what exactly is concurrent engineering and how the mechanical design process goes on while doing a mechanical component design or entire conceptual design. And in that will also be touching design for assembly in this week and you will be learning a lot in this. Moving on to slide three. So learning objective for this entire week says that we will be going in detail on basics of DFMA and then we will be explaining how the conventional design engineering, it transformed into concurrent engineering, what was the reason, what is the difference and then what are the mechanical design process all the stages, all the stages and mechanical design process. Also in which stage you can be applying DFMA and of course to apply DFMA you must be understanding what is DFA that is designed for assembly. So we will be explaining that too and then moving on to the details of design for assembly will be explaining guidelines for overall assembly evaluation and component retrieval.

So these are the few things which we will be touching in this entire week. Moving on to slide four, the birth of DFMA. So if you are a very good engineer, then you will not be satisfied with any answer. So you will be just keep on asking like why, why we are doing this? What is the cause of this? So those things will be explained in this topic, the birth of DFMA. And this all started with the era of colonization. So when the European countries were doing colonization. So when the European countries were doing colonization and there were internal wars going on Europe. And you all know that if you are in a war, you will be needing resources. The resources can be military machineries. The resources can be the demand of the processed food. Anything it can be. It can be military automotives, military aircrafts.

There were a huge demand in the European countries. There were a huge demand in the Europe side. And we all know that US is a very good supplier. So US came forward to supply and meet these demands. So this entire thing started in the Western and people who are intelligent minded, they started coining new terminologies or new methodologies. Once it is implemented, it is experimented. And then it left a benchmark, created a milestone. Among those methodologies, there was TFMA also. And we are going to learn about it.

Moving on to slide five. So first we will try to understand what exactly is the definition of DFMA. It can vary from sources to sources. But here I can say that design for manufacture. This basically refers to the design of the elements that will make up the product after assembly for simplicity of fabrication. So the meaning of this phrase is that we are going to design the components in a way that it can be manufactured easily. And once it is assembled into making a product that product should be functional and there should be some profit in it. So design for manufacture, I believe this is clear.

Now coming to design for assembly. Design for assembly, it refers to products design for the simplicity of assembly. So when you have few components in hand and you are going to assemble it, you should not be beating your head on the wall on how to assemble it and how to find a good zig and fixture to assemble it. It should be easily assembled. So that you can go and enjoy your rest of the life after office. You will not be in attention. So just to make your life easy, in those days, DFA was coined.

And when you are having both design for manufacture and design for assembly used together in a proper direction, that's what we call as design for manufacture and assembly, that is DFMA. Further, we will discuss the people and when they have done something related to DFMA or which leads to DFMA and why they have done this. Moving on to slide six. We have tried to keep only few events. If I'll start noting on each and every event, then it might be a differentiation. So we have just coined a few of it so that you can just get a tiny timeline view of what is done, how the thought process changed from which year it started. So first 1793, we had a genius Oliver Evans.

So he was working into a flow mill and what he found that the people are finding difficulties in moving wheat bags from one place to another. So in his mind, he thought of an idea and he introduced three different types of conveyors. Those conveyors were used for transportation of wheat from the source to the tools, machines. So basically it was for moving materials from one location to another without physical labor. And this was a new advancement because this was assembly automation in 1793. So rest of the thing, of course, it will be easy. Once you have reduced the effort, you have reduced the time, then eventually you will be producing more in less time and the cost will also decrease. So the overall idea should be to decrease the cost and time.

Moving on to slide seven. In 1798, there was substantial number of muskets which was required by US and this was to satisfy the demand due to impending conflict with France. So it was getting impossible to import further supplies from Europe. So in those days, of course, the transportation was also a little difficult. So another genius, Ilya Whitney basically started the mass production and he signed a contract to produce 10,000 muskets over a course of 28 months. So what basically he did, he started creating the components in a general use. Like for example, if you have one particular assembly in that you have four components and you have another assembly also you have four components.

But both the assembly components are different from each other. So in that case, you will be producing total eight different components to make two assemblies. But Ilya Whitney avoided it. In these two assemblies, out of four four, he created two common parts. This is just an example of number of parts which I am telling it can vary. But yeah, this is just to make you understand what Ilya Whitney did. So he commonized few of the components of different assemblies as well as he commonized the method of assembly for these components.

So in that case, the components became interchangeable. So like how you see in your day to day life, you have a mosquito repeller in your home. There can be different companies like all out. There can be different companies modern. Few of the companies have their own specific refill, but few of the companies they use a common dimension of the refill so that any company's refill can fit in any mosquito repeller. There can be another best example is your home lights, the bulbs which you use in your home.

You get a bulb fused in your home, you go to market, you buy any company's bulb and you can fit that LED bulb or fluorescent bulb or the filament bulb. You can keep it and you can fit it in the same holder where the previous bulb was fitted. So these things are the example of interchangeability. This is what is done by Ilya Whitney. I believe I made it clear what was done in the year 1798 to 1801. Moving on. There is another year 1849 and we have one more genius, Elihu Root. So what exactly he did? So there were Colt 6 shooters. This was a form created by Elihu Root. For example, in an assembly, you have two sub-assemblies and those two sub-assemblies are assembled in a third line to create the entire assembly.

But just imagine if you are assembling one sub-assembly in a line and then after that one sub-assembly, you started assembling the second sub-assembly and once the second sub-assembly is finished and then you started both the first and second sub-assemblies together. So each assembly times are adding up with each other and finally it is summing up with the final module assembly time. So the overall time length you can imagine. Now let's assume if you are having one sub-assembly being assembled in parallel to it, you have another sub-assembly being assembled in the same timeline.

So once these two sub-assemblies are assembled in the same timeline, after that the second stage will be assembling the final module. So in this way, when you are splitting a work, then your time is getting reduced, the worker's skill can be divided and in that case, the overall production will increase. And if you are doing a work, you are getting pro into it, then the likelihood of doing an error will also decrease. So this was the concept of LO route to split the work and multiply the result.

So overall, these people, when they were doing these activities, they were not knowing that in future, there will be a term formed as DFMA and which will include all these activities as a standard. Moving on to slide 9. When we are talking of mechanical, how can we miss automobile, if we are talking about automobile, how can we miss Henry Ford? So Henry Ford, as it's written in the statement, Henry Ford unquestionably played a major role in the creation of contemporary assembly and manufacturing techniques. He organized the flow of machinery, labor and material so that assembling a flywheel magneto took only 5 minutes instead of 20.

Ford continued to develop new techniques resulting in the manufacturing of one car every 10 seconds. These are just examples. The examples can be plenty, but I chose this example just to give you an overview. How people used to think those days, how innovative they were thinking and how they standardized the global process of mechanical component design. Moving ahead, at a meeting between the creators George Deville and Joseph Engelberger in 1956, the ultimate, the first contemporary industrial robot was designed. Now, in 1956, we are moving towards automation.

Already, we had seen one example of Oliver Evans for conveyor belt for automated transportation of materials from one location to another. And here we are reading about the industrial robots. The ultimate began processing die castings on the General Motors assembly line in 1961. So, moving on, they started implementing industrial robots for material handling tasks like die casting and punch press work. And by 1968, they were also being used for assembly. In 1972, there were 15 manufacturers producing more than 30 distinct types of robots. So, let's move to slide 10.

The conclusion, I can say, is we are doing this entire changing or innovation for the ease of manufacturing, for the ease of assembly. And eventually, we are decreasing the cost also. And as well as a lack of time to market plays a major role. So, we are reducing time of production also. The birth of DFMA, now you have the reason that why DFMA was coined. So, the first reason says, lack of time to market for quality products is one of the key factors that gave rise to the need for DFMA.

The DFMA methodology is developed to support the following three factors, ultimately minimizing the time to market for quality products. Of course, the product quality is the utmost important. You can take time, but the product should be of quality product. If you are delivering anything in a hurry, and that fails in the real-time use, then that's gonna hamper your reputation, your sale. So, first of all, you need to maintain the trust with the customer. And how can you maintain the trust? That is by giving quality products.

And how can you ensure quality products? In less time. So, to make this possible, we will use DFMA methodology. Now, how we are doing this? DFMA, it gives a help or a push to manufacturability, interchangeability, and automation. Moving on to slide 11. So, the first one, manufacturability. What exactly it says? The design should be easy to manufacture and assemble. The design of the parts must be improved in a way to support the other two. That is, interchangeability and automation. And thus, reducing time, of course. If you are getting a task, which is easy, and if you are getting another task, which is a little bit difficult, but the ultimate result of both the tasks are the same, then, of course, who is gonna be happy with which particular process?

The easy one, right? Because you are doing an easy task and getting the same result. It's just like a current going through resistors. So, if you have a current going through resistors, then the current will obviously choose the least resistance path. Or you can imagine, when you have a flowing water, you are putting an obstruction in the flowing water. The water will always choose the easiest loophole from where it can leak out. So, similarly, you need to think here. If you are giving a design, which is easy to manufacture and assemble, the shop floor people will be the happiest.

And ultimately, it will give results in terms of cost and time. Moving to the next slide. Now, for everyone who is having a query on interchangeability, I think this slide can help you out. And the image in the right can explain it very well that what interchangeability means here. So, if we go with the statement, without special fittings, like fillets, meted pieces, can be freely replaced. So, if we are mating the pieces by the same mechanism and all the pieces are different and all those different pieces are meted at one particular interface using same mechanism without any special fitting, then that is what we call as interchangeability.

So, replacement parts are easily accessible on the market. If I can give you another example, you have seen tires on the rim in the wheel of cars or bikes. So, let's imagine one of your car tires is damaged. So, you have to change that tire from the car wheel and then you go ahead in the market and try to find out which is the best quality tire and which comes in your budget. You find one which may not be of the same company of the tire which you are currently using.

So, in that case, you can buy any company's tire of that particular rim size and you can fit in your rim. This is what we call as replacement parts are easily accessible on the market. And if you have the same method of assembly for all different types of pieces, then of course, the competency required for that particular assembly will be less because it is known to everyone and whosoever is doing this task. So, if they have done for one particular tire, they will know for every other tire how to replace it.

So, the competency requirement will decrease. Less competency is needed during the assembly. And it will also make the maintenance simple. A manufacturer can cut costs and labor hours. And of course, that may be missed here. But yeah, of course, the training hours will also be reduced because if you are training different mechanism to a labor or if you are training one mechanism to a labor, the time will reduce for the training as well as the cost. This is slide 13. Here, we are seeing some robotic hands in the right side image and those robotic hands are doing the assembly on its own.

This is called automation of your manufacturing or auto. of your assembly and why it is required earlier also people used to do this right manually but why it is required of course we have already discussed it is because we need to have supply meeting the demand and if the demand has increased to increase the supply we need everything to be done quickly to follow the process with optimum quality and if you are considering a human assembly although you can do mistake proofing design but still a human can make mistake because this is not a fixed programming in our minds our mind is like a free machine which is roaming everywhere in thoughts so to avoid such human errors to maintain quality and to decrease the time we move on for automation it is required to have a design methodology to provide features that support automated assembly because machine don't have eyes if they are holding anything in a wrong way there should be some mechanism for the machine to understand that they are holding it in a wrong way

Want the rest of Design for Manufacturability (DFM)?

Get the full course syllabus and fees.

The full course is paid (₹40,000). We'll send the syllabus and call you back within one working day.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Full course · paid

Unlock the full Design for Manufacturability (DFM) course

The remaining 27 lessons, mentor-reviewed projects and a certificate come with the paid course (₹40,000). Leave your details: we'll send the syllabus and fees and call you back.

Get the syllabus and fees

A counsellor calls you back within one working day.

By submitting you agree to our Terms and Privacy Policy.

Grow by Skill-Lync · free lesson

Start watching

Free, no payment. Leave your details once and every free lesson on Grow plays straight away. A Skill-Lync counsellor may call you about the full Design for Manufacturability (DFM) course.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.