Pipe Rack Width, Clearances, Materials and Fireproofing Basics

A free lesson from Skill-Lync's Design and Analysis of Piperack Structures using STAAD.Pro course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Seismic and Wind Force Control in High-Rise Structures”

What will you learn in this free Design and Analysis of Piperack Structures using STAAD.Pro lesson?

The lesson gives typical pipe rack dimensions, including 6, 8 or 10 meter single-bay widths, column spacing of about 6 meters, minimum clearances of 4 meters under units and 2.2 meters offsite, and road clearances of 7 and 5 meters. It also compares steel and concrete racks and begins fireproofing, using 537 degrees Celsius as the steel failure point.

  • Pipe rack widths and column spacing
  • Clearances under racks and for roads
  • Steel versus concrete rack selection
  • Fireproofing purpose and 537 degree limit

What comes after lesson 2?

The next free lesson is lesson 3, “Fireproofing Pipe Racks: Passive and Active Systems” (16 min). Later in Skill-Lync's Design and Analysis of Piperack Structures using STAAD.Pro course (paid): lesson 4, Thermal Load Considerations in Pipe Rack Design; lesson 5, Framing of Continuous or Conventional Pipe Rack; lesson 6, Grilled Modeling Technique for Shear Wall Systems. The full course has 49 lessons (21 h 20 min of video); see the course overview or its price and syllabus.

Lesson transcript

Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.

Next is width of pipe rack. So as you can see a typical section of pipe rack showing process lines, utility lines and cable trays. So this is a typical three level or three tier section of pipe rack. And generally the first layer is process layer, then second one is utility and third one is cable trays. Now this will be discussed in details in later on. So this is just to show a typical section of pipe rack with all possible assembly. So over you can see that this is an access way, then this is a equipment placing, then this is some kind of you know pump and these are the pipes which you can see.

These are the pipes which are running through. Okay. So this is just to understand the width of pipe rack. Details will be discussed in the later section. Then width of pipe rack. Then width of pipe rack. The width of pipe rack shall be 6 meter, 8 meter or 10 meter for single bay and 12 meter, 16 meter or 20 meter for double bay having 4 tiers maximum. The spacing between pipe rack. The spacing between pipe racks shall be taken as 6 meter in general. However, it can be increased to 8 meter depending on the size of the pumps to be housed below the pipe racks.

So again there is no hard and fast rule. So again there is no hard and fast rule that what should be the ideal width for the pipe rack. So either it can be 6 meter, it can be 8 meter or it can be 10 meter for a single bay and 12, 16, 20 or maybe 25 and so on for the double bay. So it is totally again depend upon the area available and the scope of the project and the client requirements like how big or how small the project is.

So in general the center to center distance between columns shall not be more than 6 meter. In some cases it can be increased to 8 meter depending upon the size of the pump like if there are some kind of pumps or equipment or some other arrangement equipment arrangement is fouling then it may go up to 8 meter. But generally we are trying to make it up to 6 meter so that we can use section properties at the lowest level. What happens when you are increasing column to I mean center to center distance between column from 6 to 8 then there are possibility that the column size may increase tremendously.

So that all depends upon like how long length you are choosing. Now next is clearance. For units clearance beneath pipe rack shall be 4 meter minimum both in longitudinal and transverse direction means the clearance like you know if the start point of pipe rack and the end point of pipe rack then you have to keep the free space 4 meter in the free space 4 meter in longitudinal direction and 4 meter in the transfer direction or in simple language 4 meter along x direction and 4 meter along z direction so that it will be very easy not to be very easy not to be very easy not to foul with any other equipment or any other equipment or any other equipment foundation otherwise it will be very serious issue.

For offsite clearance. For offsite clearance beneath pipe rack shall be 2.2 meter minimum both in longitudinal and transverse direction. So again for offsite projects at least we should maintain 2.2 meter clearance in both longitudinal and transverse direction. Road clearance shall be 7 meter for main road and 5 meter for secondary road. Also in case if the road is directly accessible to the pipe rack or pipe is directly accessible to the road then there shall be 7 meter clearance to be maintained for the main road and 5 meter for the secondary road. Now this is also not mentioned somewhere but this is the general practice which we are following so that it will be very easy to maintain that ease while constructing a pipe rack.

And also it shall not be so far because when you are installing pipe rack to avoid that transportation cost we shall not place the road far away from the pipe rack. So yeah it shall be easily accessible but we have to maintain 7 meter for main road and 5 meter for secondary road. Next is construction material. Generally pipe racks are steel structures. They can be concrete as well in some cases. 90% of pipe racks are generally steel structures and remaining 10% can be concrete. Now that is also depends upon the client's requirement or how big the client is because when it comes to steel structures they are always very expensive than compared to concrete structure. And also the utilization. If the client is focusing or he is willing to have pipe rack for some lesser duration say 4 or 5 or 6 years then he will choose concrete pipe racks over steel pipe rack to avoid his expenses.

As I said that steel structures. As I said that steel structures. As I said that steel structures are always higher cost. That can be reason. So yeah generally the pipe racks are steel structures and we are going to design pipe racks in steel structures only. As we know steel structures. As we know steel structures are more durable and flexible than concrete structures. Yeah we all know that the steel structures are more flexible than durable. Yeah they are not economical as compared to concrete. But yeah like you know durability is very very more than compared to concrete.

Also the lifespan of steel structures. Also the lifespan of steel structure is more than concrete structure. Also the lifespan of steel structure is more than concrete structure. As we know that the lifespan of steel structure is more than concrete structure. So that is plus point. To choose steel over concrete structures. The fabrication parts of pipe racks to be done near site to avoid transportation expenses. So when you are designing steel pipe racks. then fabrication parts of pipe rack is better to do at site on your site only so that we can avoid the transportation expenses now what is this fabrication parts so when you are designing a complete pipe rack so we are giving some kind of members size you know for example we are giving column of ISMB 500 then we are giving beam of you know ISMB 300 so what they are doing like they are making one complete frame and they are directly installing at the site so that is called fabrication those are generally to be done on sites or any fabrication of factory so it's better to have that fabrication factory near to the site only to avoid the transportation expenses because that will also cost the project only the grade of materials to be used as per clients requirement now the grade of material that is also a very important part lesser the grade more size of members we have to use and higher the grade we can use lesser size of the sections so that is all depend upon because we are talking about concrete then we are generally using m20 m25 for the footing but if we are using m14 instead of m20 then then the price go double or triple actually so that is also a consideration part that the grade of material and for steel we are generally using fe250 which is very easily available in market now next is fireproofing so let us discuss more about fireproofing the term fireproof does not necessarily mean that an item cannot ever burn it relates to major performance under specific conditions of testing and evolution now many people and many students are confused about fireproofing that they do consider that if we are applying some kind of fireproofing criteria that does mean the material or the project we are preventing material or the complete structure or and we are going to see here at this side in a row From burning. But it is not like that. It is like that as we have discussed like it relates to the major performance under the specific conditions of testing and evaluation.

Fireproofing does not allow treated items to be entirely unaffected by any fire. Fire. As conventional materials are not immune to the effect of fire at the sufficient intensity and or duration. So, if fire happens to any of the structures, so that does not mean that if we are applying any kind of fireproofing criteria or fireproofing technique, then your structure will remain as it is. No, this is not like way. This is very wrong actually. So, it is like, yeah, when we are using the fireproofing technique, yeah, we are helping to prevent them for the fire.

But, yeah, there might be possibility that, you know, the effect of fire at the sufficient intensity can be visible. Like, you know, there might be some kind of failure or some kind of loss in that case is possibility. Fireproofing is employed in refineries and petrochemical plant to minimize the escalation of the fire that would occur with the failure of structural supports and the overheating of the pressure vessels. The damage that fire could potentially do very early on could add on significant fuel to the fire. So, we are providing fireproofing technique or fireproofing design just to avoid any kind of failure or any kind of damage of structural support or the overheating of pressure vessels.

See, in case of overheating of pressure vessels, there might be a possibility for the bigger accident or the sports or any kind of hazards. So, we can prevent that, like, by giving the fireproofing technique, we can get time so that some arrangement will be made. So, that is the main purpose of providing fireproofing criteria. So, main purpose is like, you know, to prevent the damage. Like, we are not providing any kind of fireproofing technique, then there is possibility at very early stages, there is possibility that, you know, failure of supports or failure of any member, then failure of vessels, then failure of any kind of, you know, machine which could turn into the bigger hazard or the bigger problem.

So, we can avoid that by using some kind of fireproofing techniques. So, the purpose of fireproofing, therefore, is to buy time. So, this is the best way to explain fireproofing that the main purpose of fireproofing is to buy the time. So, that we can get the time and we can do some further hazardous management thing and all that to prevent the fire or to make it under control. So, let us discuss why fireproofing is used. Typically, fireproofing is designed to protect the structural steel which supports high risk or valuable equipment.

The failure point is generally considered to be 1000 degree Fahrenheit, that is approximate 537 degree Celsius as this is the point where steel has lost approximately 50% of its structural strength. So, that is what we have discussed, the main purpose of fireproofing is to protect the structural steel from failure. You know, as the study indicates that 537 degree Celsius or 1000 degree Fahrenheit is a failure point of steel or it's a failure point of structural steel where steel has lost approximately 50% of its structural strength.

So, the fireproofing arrangement is made in a way that at least it will not cross 537 degree Celsius temperature or 1000 degree Fahrenheit. The aim then is to prevent structural steel from reaching 1000 degree Fahrenheit for some period of time. Tanks, tanks, tanks, pressure vessels and heat exchangers may experience a significant cooling effect from liquid content also. Less fireproofing protection is generally required. So, the main aim of the fireproofing is to prevent structural steel from reaching 1000 degree Fahrenheit, that is 537 degree Celsius for some period of time.

Now, they have their own study regarding that, may be that period of time could be half an hour, an hour or 1.5 hour or 2 hours. It totally depends upon how they design the fireproofing criteria. Some thermal insulation systems may serve a dual role as fireproofing and this is common with some pressure vessels. So, piping may be insulated but not generally considered to be fireproof. So, to avoid the fireproofing, there are some thermal insulation systems that are to be applied or adopted in case of some kind of pressure vessels or equipment.

If you want to avoid this, then what you are using, it depends upon how you've productiveאר or塗.' So, when you are using this, you can see the재hair nehmen that is our elemental system of cooling proceedings. So, in this case, if you want to thrift with a premium tool, you can see the same amount, as multiple foot萬 вам return to your site, you can see the same amount. мало.

Want the rest of Design and Analysis of Piperack Structures using STAAD.Pro?

Get the full course syllabus and fees.

The full course is paid (₹40,000). We'll send the syllabus and call you back within one working day.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Full course · paid

Unlock the full Design and Analysis of Piperack Structures using STAAD.Pro course

The remaining 46 lessons, mentor-reviewed projects and a certificate come with the paid course (₹40,000). Leave your details: we'll send the syllabus and fees and call you back.

Get the syllabus and fees

A counsellor calls you back within one working day.

By submitting you agree to our Terms and Privacy Policy.

Grow by Skill-Lync · free lesson

Start watching

Free, no payment. Leave your details once and every free lesson on Grow plays straight away. A Skill-Lync counsellor may call you about the full Design and Analysis of Piperack Structures using STAAD.Pro course.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.