← Course overviewFree lesson 1 of 3 · lesson 1 of 49Next lesson →

Unlock all 49 lessons of Design and Analysis of Piperack Structures using STAAD.ProFull course ₹40,000 · paid

Price & syllabus
Free lesson · 26 min · no payment

Pipe Rack Basics: Design Inputs, Layout, Shapes and Future Space

A free lesson from Skill-Lync's Design and Analysis of Piperack Structures using STAAD.Pro course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Failure Mechanisms and Coupled Behavior in Shear Walls”

What will you learn in this free Design and Analysis of Piperack Structures using STAAD.Pro lesson?

The instructor introduces pipe racks as non-building steel structures that support pipes, power cables and instrument cable trays in petrochemical, chemical and power plants. The lesson covers the primary design inputs (plot plan, P and IDs, client specification), why multiple tiers are used, rack shapes such as L, T, U, H and Z, and the 25% or 10% future expansion allowance.

  • Why pipe racks lack a dedicated design code
  • Plot plan and P and ID inputs
  • Single versus multi-tier pipe racks
  • Rack shapes and future expansion width

What comes after lesson 1?

The next free lesson is lesson 2, “Pipe Rack Width, Clearances, Materials and Fireproofing Basics” (16 min). Later in Skill-Lync's Design and Analysis of Piperack Structures using STAAD.Pro course (paid): lesson 4, Thermal Load Considerations in Pipe Rack Design; lesson 5, Framing of Continuous or Conventional Pipe Rack; lesson 6, Grilled Modeling Technique for Shear Wall Systems. The full course has 49 lessons (21 h 20 min of video); see the course overview or its price and syllabus.

Lesson transcript

Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.

Hello everybody. The name of course is Introduction of Pipe Rack, where we are going to learn design and analysis of pipe rack by using Indian Codes. Pipe Racks are structures in petrochemical, chemical and power plants that are designed to support pipes, power cables and instrument cables. The design requirements found in the any building code are not clear on how they have to be applied on Pipe Racks. This course summarizes the design code requirements and industry practice design criteria, design loads and other design consideration for pipe racks that are going to be followed in the design offices.

In this course, we will learn Designing Process of Pipe Racks in the Structural Engineering Software, STAAD.Pro. Modeling the pipe rack and applying load can be a complex and confusing in the beginning, but in this course, you will get to study details about pipe racks with no worry. No prior experience in STAAD.Pro and steel structures is required to get the most out of this course. You will start with the absolute basic that is calculating loads on the pipe racks. Then, we will proceed step by step through the process of modeling columns, beams, bracing, applying loads.

Next, we will move on how to assign the properties to the structural steel members, assigning with the releases and supports. Final stage shall be how to analyze and design command in STAAD.Pro. Now, in this course, you will learn how to design pipe racks by using Indian Cores. Requirement to learn this course is a computer with either Windows or Mac with STAAD.Pro software installed. So, let us begin with the course. So, here we are going to cover this course one in five stages or you can call it an index.

It contains general, design consideration, typical layout of pipe rack, framing of pipe rack and pipe rack specification safety. General, pipe racks are structures in petrochemical, chemical and power plants that are designed to support pipes, power cables and instrument cable trays. As I explained at the very beginning of this introduction, pipe racks are the very important steel structures that are placed in the petrochemical, chemical and power plants. And the main purpose of the pipe rack is support pipes, power cables and instrument cable trays. There may also be used to support mechanical equipment, vessels and valve access platforms.

So, pipe racks are non-building structures that have similarities to structural steel buildings. So, pipe racks are steel buildings itself but they are non-building structures. Like, the purpose of the purpose of pipe rack is different than regular steel building structures. And in some of the cases, they may also be used to support mechanical equipment like boilers or any other equipment than vessels and some valve access platforms. Pipe transfer material between equipment and storage or utility area. So, the main purpose of pipe is transfer material from one equipment to another equipment or from one equipment to storage area or storage to utility and vice versa.

The material which pipe is passing through may be liquid material, semi-liquid material or semi-solid material. It depends upon the requirement of clients. The design requirements found in the building codes are not clear on how they are to be applied to pipe racks. So, we have several design codes. For us, we are generally using IS codes that is Indian standard codes. Then, there are Euro codes, there are British codes, there are American codes and there are IBC that is International Building Codes. But, nowhere it's mentioned about pipe racks like pipe rack as an individual structure.

So, it is very uncertain over in all codes that nowhere it is mentioned the design requirement for pipe racks like how the loads to be taken or how the loads to be applied. So, we are going to cover that design requirement in this particular course. Several industry references exist to help the designer apply the intent of the code and follow expected engineering practices. So, as we discussed in previous topic, so there are no particular code for pipe racks or in nowhere it's mentioned for specific for pipe racks.

So, there are some references available. So, with respect to that, we are designing pipe racks. This course summarizes the building code and industry practice design criteria, design load and other design consideration for pipe racks. So, here we are going to learn about some kind of building code, then how the industry is practicing the design, like how and what point are considering while designing. Then design load, like what are the loads to be applied when we are designing a particular pipe rack and their conditions, then load combinations and other design consideration like site parameters or some other things which we are going to cover in this course.

Now, design consideration. So, what are the factors which we are considering for design consideration, those are as follows. The primary data required for detailed development of a pipe rack, layout or plot plan, P and IDs i.e. process and instrumentation diagrams, client specification, construction materials and fireproofing requirements. So, in this design consideration, these five points which mentioned over here are the primary data required for the detailed development of pipe rack. Like before starting of analysis and design of pipe rack in actual, we are requiring these data.

So, let us discuss about them in details. Layout or plot plan. So, this is very important parameter to be considered. So, as you can see, layout of pipe rack. This is an AutoCAD drawing where you can see, this is a start point of pipe rack. It is going straight. Then it is turning left. Then again it is going straight. Then it is turning left. Again it is going straight. Then it is turning right. Then again it is going straight. And then right. And then it sends.

So, you might be having question, why the shape of pipe rack is like this? Or why it is such an irregular shape? So, layout and plot plan is completely given by clients. Now see, when client is giving us some particular data, so there might be possibility that at the start point of the pipe rack, as you can see over here. There might be one equipment. And from that equipment, these pipes are running. From this equipment, the pipes are running. And the other equipment is placed over here.

And to that point, the flow is flowing via like this. To transfer the material or the liquid from this equipment to this equipment. So, there are several possibilities actually. Or there might be possibility that, you know, in this area that is already occupied by other equipments. Or it just like the client have this kind of space available for pipe rack only. So, there are several criteria regarding that. So, this is been given by the clients only. So, let us discuss more about layout or plot plan.

Here we are. Here we go. An elevated multi-level pipe rack may be required for plant layout, equipment or process reasons. Multiple levels are not mandatory. It is simply a question of space. Now as we define that an elevated multi-level pipe rack may be required for plant layout, equipment or process reasons. So they may be required as we discussed like you know flowing pipe material from one portion to another portion or one unit to another unit or one equipment to another equipment or vice versa. Then the very important point over here that multiple levels are not mandatory. It is simple a question of space. Now see many people, students are confused regarding this point. Like why they have multiple level or they have multiple tier. So there is no hard and fast rule for this.

See it is all about utilizing the space. See it is all about utilizing the space. If you are defining multiple level pipe racks, then there are maximum chances to get the space utilized. Like there are multiple levels. So at multiple levels you can assemble multiple level of cables or instrumentation, trees, then cable trays or whatever. So that is just a point that how to utilize this space. As long as the required space beneath the pipe rack for the accessibility and the road crossing has been taken into account. The rack can remain single level.

So again there are possible. So again there are possibilities that the pipe rack is a single level itself which is passing just a pipe rack itself. For example, the pipes which flowing water like our regular water supply, they are mostly single level only because the purpose of that pipe rack is just to flow running, drinking water or any kind of water. So it is like what is your purpose in designing the pipe rack. Also when the pipe rack is defined or the layout or a plot plan is made, the road crossings are very important to take consider because the road should be you know not so far from the pipe rack arrangement.

The reason behind this, see now when the pipe rack is getting installed or when the material is coming and all that. So just to avoid the transport cost and it will have to be easily accessible to the roads. However, in most cases multiple level will be required. Within plant unit most process pipes are connected to related unit equipment. Placing these pipes in the lower levels result in shorter pipe runs, savings on pipe cost and better process flow conditions. So again we have discussed why multiple levels are required and what is the purpose of giving multiple level pipe racks.

Mostly pipe racks are placed at the lower layer or lower tier to have shorter pipe runs than saving on the pipe cost. Now how saving will affect if they are in a first tier. So when it will go to say second layer, third layer or any upper layer, then the length of the pipe rack will increase. And it's not about 1 meter or 2 meter because sometimes the pipe rack are like you know 35 meter, 40 meter in length. Sometimes they are 50 meter then 80 meter. So even for 1 bay it is a 1 meter then it will go many meters ahead. So there is no requirement of pipe racks to be placed in the above layers.

So generally they are placing at the lower level only. Also it cost better flow process. As the height increases the flow will be reduced. Like we do require more pumping or we need to work on the more for the continuous flow. So it's better to place them at the lower level. Now next is P and ITs. That is process and instrument diagrams. Now as you can see there are line passing. So you can call it as a line diagram. And you can see that there are several lines passing. So you must be confused or you must be thinking that what these lines are. And what about this circular and cylindrical portion.

And also if you see that there are some kind of arrows that are shown in this diagram. So these lines that are reciprocating the pipelines you can call it. Then this circular and this rectangular. They might be some kind of equipment or boiler. Or any kind of vessel. Or tank you can call it. The flow of material passing through the pipes. So in simple language if you consider this particular equipment. Now one arrow is coming from this side. One arrow is coming from this side. And one arrow is coming from this side.

Now you consider this as an individual pipe rack. And from here the flow is passing. So if you consider then the flow is passing through like this. Then it is coming to this. Then it is coming to this. Then it is coming like this. So you can say that this. So you can say that this is a collecting tank or collecting equipment of the material or the fluid. And the fluid is passing through by these pipes. Similarly in this way. The flow is coming via this. Then via this.

So this shows like flow. So this shows like flow in details. So let us discuss more about P and IDs. That is process and instrument diagrams. A piping and instrumentation diagram. That is P and IDs. P and IDs is a detailed diagram. That is a detailed diagram in process industry. Which shows the piping and process equipment together. With the instrumentation and control devices. They usually contain information about process, piping, sizes and identification. Including pipe classes and piping line numbers, flow direction, interconnection references, pipelines and flow lines.

So as we discuss. So as we discuss. They are contain information about process, piping. Like how the flow is coming from all possible direction. Then sizes. So what about sizes? See it is again depends upon the client and the process department to choose number of sizes. Like it will be just one number of pipe size. Like it will be just one number of pipe size. Or to use multiple level of pipe size. That is being done by them. Like the process team. And they have their own team to design this particular point.

Then pipe classes. P and then pipe classes. P and then pipe classes. P and then pipe classes means you know it depends upon the material passing through. So maybe. So maybe. It is a. You can say semi liquid passing. Or sometimes it may be liquid thing. Or sometimes it will be a simply water. Or sometimes it will be a hot water. Or sometimes it will be a hot material. So maybe. So that is all. That is all included in pipe classes. Then piping line numbers. Also. Likewise we are defining beam numbers. In the format of B1, B2, B3 and etc. And column number in terms of C1, C2, C3. So they are having their own format of. You know defining line numbers.

then flow direction and interconnection that we already discussed interconnection means you know where the equipment and the pipes are meeting then pipelines and flow lines so this is all about P and IDs oh now shapes so again there is a no hard and fast rule about shapes of pipe racks they can be oh like you know various shapes and know where it's mentioned like you know shapes of the pipe rack so here I have put some images which shows different shapes of the pipe rack so over here if you see then you can call it like you know it is going straight actually and the arrow shows two ways like there might be possibility that the flow is coming from this side The flow may come from this side. So that indicates the two-way arrow. Like you know, the flow is possible in the both direction in simply language. But this end is fixed. Like you know, the flow will come from this side only. But this is a fix. So this may be some kind of equipment or some kind of you know, again vessel or some kind of collecting material you can call it.

Now, this is also straight pipe rack. But as you can see, the both end are you know, over here, both ends are passing the material. And over here, it's written two-way. Like there is possibility that you know, it can flow either from this side or that side. Depends upon you know, the flow is being designed by the respected team. Then it's a L shape actually. So you can see the shape. So you can see the shape. So over here, it's again written that you know, it's a two-way. So again that thing and over here, you can see the T shape.

So flow can come from this side. Then it may go from this side. Then again there could be some kind of collecting material. So now let us discuss more about shapes of pipe racks. There are various shapes of pipe racks. Like L, T, U, H, Z. These shapes can be considered based on the area available. Now as we have seen in the previous slide. So you can see that you know, there is no hard and fast tool for on the shapes of the pipe rack. It can be L, it can be T, it can be U, it can be H, it can be Z, or it can be straight pipe rack.

You know, around 80, 90 meter depend upon the requirement of clients. So it's totally depends upon you know, the area available. When it's a big plant, the structures are more complicated and you know, they are very closely placed. So they must be having different kind of units. So you know, they have to work out, you know, from one unit to another unit to another unit, then how to process these and all that, then levels and all that. So that is all depend upon the area available. These shapes of pipe racks or configuration is based on overall facility layout and arrangement of equipments as well as site physical conditions.

So again, it depends upon, you know, the layout and arrangement of equipments as we discussed many times earlier. Also, with the physical condition of site. So it depends. Sometimes the site is, you know, very congested. Sometimes it's very big. Sometimes it's medium. Also, physical condition as in the terrain factors. If the pipe is, you know, running through regions. So it will be very difficult to maintain the flow. So in that case, we have to make some kind of arrangement in slopes and all that. So that is what all depends or how it will work.

Pipe rack, it design with location based on the incoming and outgoing pipelines. So while designing or while considering the location, it is also important to take consider the incoming and outgoing flow, especially in a hilly area. Because if the slope is there, then it will be very difficult from the lower level to higher level. So we have to make such kind of arrangement in that particular case. Then next is a future scope. The total width of the pipe rack shall include 25% extra space for the future expansion modification in the unit for rack width up to 16 meter and 10% for rack width above 16 meter.

The future space percentage is normally based on the client requirements. Now future space. Why future space is important? Now we have been given one kind of pipe rack layout and plot plan. Okay, so we have designed likewise. So the main purpose of keeping the future space is there might be possibility that in future there might be some kind of future expansion of the existing structure. So that we have to consider other parameters like footing not to be clashed and all that. So that we are just keeping 25% extra space for the future expansion when a rack width is up to 16 meter and when it's above 16 meter, we are putting it up 10%.

And that is also depend upon the client requirement only. What if he is not having that 25% or 10% of the area under his control? Because if the space is very limited, the project is very small, then you can't be assured about you know keeping the thing. But yeah, one thing is like that when you have the plot plan, at least make sure that you know to keep some percentage of the space free.

Want the rest of Design and Analysis of Piperack Structures using STAAD.Pro?

Get the full course syllabus and fees.

The full course is paid (₹40,000). We'll send the syllabus and call you back within one working day.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Full course · paid

Unlock the full Design and Analysis of Piperack Structures using STAAD.Pro course

The remaining 46 lessons, mentor-reviewed projects and a certificate come with the paid course (₹40,000). Leave your details: we'll send the syllabus and fees and call you back.

Get the syllabus and fees

A counsellor calls you back within one working day.

By submitting you agree to our Terms and Privacy Policy.

Grow by Skill-Lync · free lesson

Start watching

Free, no payment. Leave your details once and every free lesson on Grow plays straight away. A Skill-Lync counsellor may call you about the full Design and Analysis of Piperack Structures using STAAD.Pro course.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.