Challenge

Week 9 - Attachment Feature Creation - Challenge 2

STRUCTURE TREE

SKETCHES

  • POSITIONED SKETCH

SKETCH-1

SKETCH-2

SKETCH-3

SKETCH-4

  • ISO-CONSTRAINED SKETCH

SKETCH-1

SKETCH-2

SKETCH-3

SKETCH-4

*NOTE:

  • The dimensions were given as a reference from technical engineers as they were not mentioned in the challenge guidelines.

3-D IMAGES:

INPUT/CLASS-A SURFACE

  • ISOMETRIC VIEW

  • FRONT VIEW

  • RIGHT-SIDE VIEW

  • TOP VIEW

FINAL ASSEMBLY COMPONENT

  • ISOMETRIC VIEW

  • FRONT VIEW

  • RIGHT-SIDE VIEW

  • TOP VIEW

DOG HOUSE in ASSEMBLY

  • ISOMETRIC VIEW

  • FRONT VIEW

  • RIGHT-SIDE VIEW

  • TOP VIEW

DRAFT ANALYSIS:

INPUT/CLASS-A SURFACE

  • ISOMETRIC VIEW

  • FRONT VIEW

  • RIGHT-SIDE VIEW

  • TOP VIEW

FINAL ASSEMBLY COMPONENT

  • ISOMETRIC VIEW

  • FRONT VIEW

  • RIGHT-SIDE VIEW

  • TOP VIEW

DOG-HOUSE

  • ISOMETRIC VIEW

  • FRONT VIEW

  • RIGHT-SIDE VIEW

  • TOP VIEW

*NOTE:

  • There are errors in the draft analysis due software version issues.

REPORT:

1. TOOLING AXIS

  • By changing the view on the aixs we can see in which axis-view the CLASS-A is seen clearly.In this case,the y-axis is the best view possible to see the component clearly.

  • Pick the POINT on the surface of CLASS-A surface.

  • Create a line using the POINT in the view direction with the desired lenght which will be the TOOLING AXIS of the component.

2. SLIDING AXIS

  • Create an EXTRACT on the back of the Dog House surface.

  • Pick a POINT on the centre of the surface.

  • Create a line perpendicular to the surface of the extract in the desired lenght called as SLIDING ANGLE which is a different draft angle to the Dog House compared to the Assembly Component.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.