Week 8 - Challenge 5 - Door Trim Lower
Aim :
To create the class B surface, C surface, and tooling axis also publish it as well as close the surface of the given door trims.
Objectives :
Create the Door Trim Plastic component through the given Class-A surface with a thickness of the component to be 2.5 mm
Class A :
Draft Analysis

B surface :

C surface :

Close Surface :

Solid Surface

Draft Analysis
