COIN HOLDER STEPS FOLLOWED:- 1. TOOLING AXIS 2. B SURFACE CREATION 3. C SURFACE CREATION 4. FINAL BODY 1. TOOLING AXIS IN THIS PROJECT, THE TOOLING AXIS IS MADE NORMAL TO THE SURFACE. WE HAVE TAKEN INTERSECTION AND AS WE KNOW IF THE SURFACES ARE AT 90 DEG OR FLAT THEN THE TOOLING AXIS SHOULD BE TAKEN NORMAL…
Roshan Dagade
updated on 03 Jun 2022
COIN HOLDER
STEPS FOLLOWED:-
1. TOOLING AXIS
2. B SURFACE CREATION
3. C SURFACE CREATION
4. FINAL BODY
1. TOOLING AXIS
IN THIS PROJECT, THE TOOLING AXIS IS MADE NORMAL TO THE SURFACE.
WE HAVE TAKEN INTERSECTION AND AS WE KNOW IF THE SURFACES ARE AT 90 DEG OR FLAT THEN THE TOOLING AXIS SHOULD BE TAKEN NORMAL TO THE SURFACE.
HENCE, IN THIS PROJECT WE HAVE TAKEN TOOLING AXIS NORMAL TO THE SURFACE.
B SURFACE CREATION
B SURFACE CREATION IS DIVIDED INTO 4 SUB SURFACES
i. SIDE WALLS, ii. BASE, iii. TOP WALLS, iv. OUTER FLANGE
i. SIDE WALLS
COMMAND USED:- EXTRACT, UNTRIM, EXTRAPOLATE, TRIM, OFFSET
ii. BASE
COMMANDS USED:- EXTRACT, UNTRIM, EXTRAPOLATE, TRIM, OFFSET
iii. TOP WALLS
COMMANDS USED:- MULTIPLE EXTRACT, EXTRAPOLATE AND OFFSET
iv. OUTER FLANGE
COMMANDS USED:- MULTIPLE EXTRACT, EXTRAPOLATE, OFFSET AND TRIM
FINALLY BY USING TRIMS AND REQUIRED FILLETS, WE GET AND FINAL CLASS B SURFACE.
C SURFACE CREATION
COMMANDS USED:- MULTIPLE EXTRACT AND SWEEP
EXTRACT OUTER FACES OF CLASS A SURFACE AND THE SWEEP IT.
THEN BY USING FINAL TRIMS WE GET FINAL OUTPUT
THEN GO INTO PART DESIGN WORKBENCH AND USE COLSE SURFACE COMMAND
DRAFT ANALYSIS
A. DRAFT ANALYSIS ON PARTBODY
B. DRAFT ANALYSIS ON CLASS A SURFACE
Leave a comment
Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.
Other comments...
Week 9 - Project - A pillar Design with Master Section
B PILLAR ALL THE SKETCHES ARE ISO CONTRAINED. DETAIL FEATURE TREE DRAFT ANALYSIS 3D MODEL
20 Jun 2022 04:01 AM IST
Week 9 - Attachment Feature Creation - Challenge 2
SCREW BOSS AND DOG HOUSE DESIGN IN THIS PROJECT WE DESIGN SCREW BOSS AND DOG HOUSE ON PREVIOUSLY CREATED COIN HOLDER SCREW BOSS DESIGN COMMAND USED:- EXTRACT, SKETCH, POINT, PLANE, INTERSECT, PAD, DRAFT AND ASSEMBLE WE EXTRACTED BASE OF COIN HOLDER THEN DRAW SKETCH ON IT. THEN WE HAVE TAKEN INTERSECTION OF THAT PART PAD…
06 Jun 2022 03:47 PM IST
Week 9 - Attachment Feature Creation - Challenge 1
RIB DESIGN TO DESIGN RIB EXTRACT BASE OF THE COIN HOLDER THEN CREATE SKETCH ON IT. AND TAKE THAT LINE AS OUTPUT FEATURE THEN EXTRUDE THAT LINE ALONG TOOLING AXIS GO TO PART WORKBENCH, WITH THE HELP OF DESIGN RULE THICKEN THE EXTRUDE AND GIVE DRAFT TO IT. ASSEMBLE THIS BODY WITH MAIN BODY AND GIVE FILLET. THEN TAKE…
06 Jun 2022 09:14 AM IST
Week 8 - Challenge 5 - Core & Cavity Design
CORE AND CAVITY DESIGN IN THIS PROJECT, BY USING PREVIOUSLY CREATED MODEL i.e. SWITCH BEZEL; WE ARE NOW GOING TO DESIGN CORE AND CAVITY FOR THE SAME. STEP 1 WE ARE CREATING PARTING SURFACE BY EXTRAPOLATING CLASS A SURFACE AND USING CLASS B AND CLASS C SURFACE COMMANDS USED:- BOUNDARY, EXTRAPOLATE, TRIM, SPLIT AND SKETCH…