Challenge

Week -2

Door bell simulink model explanation:

  • pulse generator is used to create square wave pulse at regular intervals.
  • pulse generator is connected to the switch block, switch block is used to controlled by external physical signal.
  • battery block is connteced, the positive terminal of the switch is connected to positive side of battery and negative terminal of switch is connected to negative side of battery.
  • the solenoid bloack is connected with switch and battery and get's complete circuit. the port c is connected to the mechanical resistance.
  • the ideal translation sensor is connected with the soleniod block to observe the movement of plunger.

 scope block is connected to get output  

Thermistro model explaination:

  • repeating sequence stair is used to give the input to the thermistor, A controlled temperature source block is connected through which input values are given to thermistor.
  • battery block, resistor block and voltage sensor block is connected to the thermistor. the voltage sensor is to measure the voltage change during different temperature inputs.
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.