Door Trim - Dog house closed surface model with standard views, Door Trim - Dog house closed surface model with draft analysis, Dog house draft analysis w.r.t side core axis, Dog house position in Door Trim, CAS Draft analysis, CAS has surfaces that are not clearing the tooling direction. Those surfaces need to ensure…
Arun Kumar
updated on 02 Apr 2023
Project Details
Leave a comment
Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.
Other comments...
Read more Projects by Arun Kumar (11)
Week 11 - Project - A pillar Design with Master Section
A-pillar master section standard views, Analysis of the A-pillar master section for draft analysis, Dog house creation in A-pillar master section, Analysis of the Dog House A-pillar master section for draft analysis, The A-pillar master section of the final component,
28 May 2023 07:28 AM IST
Week 10 - Challenge 3 - Door Trim Lower with Engineering Features
Draft analysis of the Door Applique model in standard views, Nominal standard views of the Door applique model, (with Heat stakes & locators) Heat Stakes & locators are designed as per design rules in the given location guidelines,
26 Apr 2023 02:05 AM IST
Week 7 Challenge - Assembly Workbench
Quick return mechanism assembly, CV joint assembly,
16 Apr 2023 09:51 AM IST
Week 10 - Challenge 2- Attachment Feature Creation (Dog House)
Door Trim - Dog house closed surface model with standard views, Door Trim - Dog house closed surface model with draft analysis, Dog house draft analysis w.r.t side core axis, Dog house position in Door Trim, CAS Draft analysis, CAS has surfaces that are not clearing the tooling direction. Those surfaces need to ensure…
02 Apr 2023 07:55 AM IST
Week 9 - Attachment Feature Creation (Ribs & Screw Boss) - Challenge 1
Door handle plastic component design in standard views, Iso-metric view Draft Analysis of plastic components, CAS Draft Analysis report In this red highlighted area tooling axis creation is not possible need to ensure the CAS
04 Mar 2023 12:21 AM IST
Week 8 - Challenge 6 - Core & Cavity Design
Draft Analysis report on the final plastic component of the Switch Bezel, Core and cavity design for a switch bezel component Cavity design Core design The plastic component in the cavity block,
12 Feb 2023 07:38 AM IST
Week 8 - Challenge 5 - Door Trim Lower
Draft Analysis report of given Class-A surface with color code of draft angle, Various orientations of Class-A surface, Draft analysis report of final plastic component, Various orientations of Final plastic component, In the Draft Analysis of the final plastic component, the inner contour of the Class-C surface can't…
12 Feb 2023 07:10 AM IST
Week 8 - Challenge 4 - Bumper
BUMPER PLASTIC COMPONENT …
24 Dec 2022 02:14 PM IST
Week 8 - Challenge 2 - Switch Bezel Design
Q-1 ANS-1: Draft Analysis report for Class A surface Draft Analysis report for Final plastic Switch Bezel component …
10 Dec 2022 05:54 AM IST
Week 8 - Challenge 3 - Coin Holder Design
Q-1 ANS-1: Draft Analysis report for given Class-A surface Standard Views for Class-A surface …
06 Dec 2022 04:48 PM IST
Week 8 - Challenge 1 - Base Bracket Design
Q-1 ANS: Draft Analysis report for Class-A surface Draft Analysis report for Plastic component
03 Dec 2022 04:06 PM IST