Week 10 - Challenge 1- Attachment Feature Creation (Ribs & Screw Boss)

WEEK 10 - CHALLENGE 1

AIM - Create the Screw boss for the Drill Handle considering the design rules.

General Guidelines for Bosses:

  • Draft - 0.5 degrees on the walls of boss
  • Thickness - Typically 40%* of the nominal wall at the base.
  • Height to Diameter Ratio - 3:1
  • Radii - 0.25mm maximum radii.

REPORT

  • Class A surface is given as CATpart and .stp file along with the question.Draft analysis of Class A surface has been done.
  • Created a dummy tooling axis with point and line creation commands. With the help of Intersection and plane command the exact tooling axis is created in respect to bisecting method.
  • Class B surface has progressed with Extract, Boundary, Extrapolation, and Surface Untrim commands. Final trim and offset are used to create the partbody of 3mm thickness.
  • Sufficient fillets are provided with subtracting 2.5 - 3 mm from the Class A surface for proper alignment during final trim.
  • Class C surface creation with Boundary, Sweep and trim commands followed with Class A and C join as to trim it with Class B surface for the final product generation.
  • After the creation of Class A, B, C surfaces, had started the designing of ribs and screw boss as per given in question.
  • Ribs are designed with,
    • Draft - 0.5 deg
    • Thickness - 40% of Wall thickness = 0.4 x 3 = 1.2 mm
    • Height < 5*wall thickness = 5 x 3 = 15mm
    • Minimum thickness at Top = 0.75 mm
    • Fillet = 0.25 mm
  • Rib root thickness is measured with tritangent circle creation and is of 3.2 mm with 3 mm of wall thickness. Along with that, Minimum height at top is of 0.968 mm.
  • And for Screw boss,
    • W > 0.5T; W need to be greater than 1.5 mm and given of 1.65mm.
    • Height = 3T = 9mm
    • Draft - 0.5 deg
    • Fillet = 0.25 mm
    • Spacing of 3: 1 ratio
  • All the designing procedure are properly followed and published all according to time of completion.

IMAGES / SCREENSHOTS

  • CLASS A SURFACE

  • CLASS B SURFACE

  • CLASS C SURFACE

  • FINAL PRODUCT

  • COMPONENT WITH RIBS AND SCREW BOSSES AS PARTBODY

  • FINAL COMPLETE PARTBODY

  • DRAFT ANALYSIS

  • TREE STRUCTURE

NOTE:

  • Positioned sketches are used and are Iso-Constrained
  • Proper Tree Structure is maintained
  • Geometrical sets are properly named based on the sketches present inside.
  • All the sketches are created under the Geometrical set.
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.