Usage of Navigation tool , Timeliner and Clash Detection test using Naviswork
1) Use the Architecture/ Structure Project file developed by you in Week 6 to 8. Export the Revit architecture and structure model to Navisworks Cache file following the export settings discussed in class
AIM :
Using the Architecture/ Structure Project file developed by you in Week 6 to 8. Export the Revit architecture and structure model to Navisworks Cache file following the export settings
COMMANDS USED :
- Export
- file
- 3D view
PROCEDURE :
- Opening archietectural model previous weeks and viewing in 3D

- Clicking on export option in the file tab and selecting the NWC

- The File is in now NWC format and repeating the same procedure to other files

RESULT :
Architecture/ Structure Project file is Exported Successfully.
2) Use Navigate Tool to walk around the model and walk through the rooms created and record your moving as animation in your Navisworks file
AIM :
Using Navigate Tool to walk around the model and walk through the rooms created and record your moving as animation in your Navisworks file
COMMANDS USED :
- Walls
- View point
PROCEDURE :
- Exporting the structural and archietectural model to navis work

- Creating a view point

- Selecting the record option from the view point and clicking on walk command and walking through rooms created

- clicking stop after walking through all rooms

RESULT :
Created a walk through in rooms is created successfully in navis work
3) Use Navigate tool to use Realism feature to walk through the model and record your moving as animation in Navisworks file
AIM :
Using Navigate tool to use Realism feature to walk through the model and record your moving as animation in Navisworks file
COMMANDS USED :
- View point
- Realism
- Record
PROCEDURE :
- Opening the exported archietectural file in navis work

- Creating a view point and clicking on record

- Selecting the Realism option and clicking on third person option

- Staring on walk by clicking on record option

- Clicking stop after Walking through all rooms

RESULT :
Created a realism and walk through successfully.

4) Embed both architecture and structure *.nwc file to your Navisworks file. Create a clash detection test between the two models
a. Run the Clash Detection Test
b. Study the clashes between the two models
c. List which of the clashes could be approved
d. List which of the clashes could be neglected ( will be taken care later)
e. List which of the clashes can be resolved
f. Save the results after color coding the clashes to the Navisworks file
g. In case of resolution annotate the clash and save the view to defined views in Navisworks
AIM :
Create a clash detection test between the two models
a. Run the Clash Detection Test
b. Study the clashes between the two models
c. List which of the clashes could be approved
d. List which of the clashes could be neglected ( will be taken care later)
e. List which of the clashes can be resolved
f. Save the results after color coding the clashes to the Navisworks file
g. In case of resolution annotate the clash and save the view to defined views in Navisworks
COMMANDS USED :
- Clash detective
- Add test
PROCEDURE :
- Opening a exported Archietectural and Structural file
- Selecting the clash detective Model on Home tab

- A tab in which two new tabs are appears

- Clicking it on add test and remaining it as structural and archietectural and clicking run test

RESULT :
Clash detective test is run successfully.

5) Using the Timeliner feature in Navisworks prepare a schedule for the project developed in week 6 to 8 by adding reasonable assumptions for task start date and end date and simulate the task completion as a visual simulation. Record it and save the timeline simulation to Navisworks file
AIM :
To Using the Timeliner feature in Navisworks prepare a schedule for the project developed in week 6 to 8 by adding reasonable assumptions for task start date and end date and simulate the task completion as a visual simulation. Record it and save the timeline simulation to Navisworks file.
COMMANDS used :
- Time linear
- Add task
PROCEDURE :
- Opening the exported structural model to the navis work

- clicking on the time linear option and selecting the selection tree


- Selecting the add task and remaining the appropriate components

- The planned start, the planned end , actual start, actual end is filled with appropriate dates
- specifying the task type as construction

RESULT :
Time linear option is used succesfully with selection tree with scheduling of column.