Aim: Aim is to Design the slab and foundation of the model. Outline the thought process for designing of the elements (column, beam, slab and foundations).
Procedure:we have to follow the folowing steps:-
Step-1
- First We to first floor in scene view.
- In scene content, untick grid lines and members, so that only slab members can be seen.
- After run analysis, select slab 12 to check panel.
Step-2
- area of reinforcement provided is more than the area of reinforcement required, go to property window, change reinforcement spacing to 175mm for 10mm diameter bar.
- Now again check the panel
Step-3
- As it is select the identical slab of SL12
- In the property window, change the reinforcement spacing to 175 mm as provided
- remove the slab portion and again provide slab on beam
- put dead and imposed load on the newly created slab.
- the model to check any error.
Step-4
- again provide overall depth 150 mm and reinforcement diameter of 10mm at 175mm centre to centre.
Step-5
- For roof floor, provide secondary beams between grid line A, B and C.
- Delete the slab portion and again provide slab on beam
- Apply dead and imposed load on the newly created slab.
- Validate the model to check any error.
Foundation Design
- Under Isolated Foundation, select pile cap for reinforcement settings.
- Set minimum loose bars as 16mm diameter.
Step-6
- Go to base floor, set pile type in catalogue.
- Edit data, materials and pile capacity for piles.
Step-7
- in the property window, change the property for PC1 pile.
- Size 2.05m x 0.8m x1m. M30 grade of concrete
- Pile spacing= 1250mm with reinforcement diameter of 20mm at 150mm c/c spacing
Step-8
- Select isolated pile cap column
- Pick the C2 location to create column isolated pile cap position.
- Design the member
- In the property window, change the property for PC2 pile.
- Size 2.05m x 0.8m x1m. M30 grade of concrete for 2 pile
- Pile spacing= 1250mm with reinforcement diameter of 20mm at 150mm c/c spacing
- Check the member satisfy the design condition.
- In review view, check the status of the pile cap.