Reinforcement detailing of Columns from ETABS output
The ETABS file for a G+4 building is provided. Run the analysis and design the RCC Moment Resisting Frame. The following challenge deals specifically with two columns at the following grid intersections.
- 3A
- 3B
- Provide details of longitudinal reinforcement for the two columns, from foundation to terrace level. Sketch the column cross sectional & elevation details or draft it using autocad software.
- Show shear reinforcement & lapping details as per special confining reinforcement provision of clause 8.1 of IS 13920 - 2016.
Minimum Longitudinal Reinforcement as per IS-456 2000 As = 2340mm2
Minimum shear reinforcement as per Is 13920-2016 8mm dia at 300 mmspacing
Development Length as per Is 456 2000 Ld = 41*diameter of the bar
Longitudinal Reinforcement

Shear Reinforcement

Storey assignment Tab