Challenge

Projefct 1_Comparative study of different storey buildings for Seismic forces

AIM; TO Provide Factors influencing the Natural Period of a building

  • Effect of stiffness on T: Compare fundamental natural periods of buildings E & F as well as G & H. Why is there a marginal or significant difference in the fundamental natural periods?
  • Effect of mass on T: Compare fundamental natural periods of buildings H, J and K. Have the buildings become more flexible or stiff due to change in mass?
  • Effect of Building Height on T: How does the fundamental natural periods of Buildings A, B, F and H change with change in building height?
  • Effect of Column Orientation on T: How does the fundamental natural periods of Buildings B, C and D change with change in column orientation?



BUILDING A

DEFINE; MATERIAL PROPERTIES FOR EVERY FLOOR SAME AS

GO TO DEFINE; SECTION PROPERTIES AND FRAME SECTION

FOR BEAM EVERY BUILDING HAS SAME DIMENSION

FOR COLUMN ,ADD NEW PROPERTIES

FOR SLAB

GO TO DEFINE; SECTION PROPERTY SLAB SECTION

FOR EACH FLOOR SAME

DRAW BEAM ,COLUMN AND SLAB BY THE ICON

ASSIGN PINNED JOINT AT BASE

ASSIGN; LIVE LOAD ON THE SLAB

FOR LOADING ON BEAM

SELECT ALL THE BEAM GO TO SELECT AND PEOPERTIES SELECT BEAM.

ASSIGN DEAD LOAD ON BEAM

GO TO DEFINE ;LOAD COMBINATION AND ADD DEFAULT DESIGN COMBINATION

DEFINE ;LOAD PATTERN

ONLY DEAD AND LIVE LOAD

AFTER RUN ANALYSIS

FRAME HAS BEEN CHECKED AND DESIGNED

MASS RATIO

Ty; 0.327

Tx; 0.320

Tz ;0.280

for building B

GO TO EDIT HEIGHT OF STORY

AND ADD STORY

AFTER RUN ANALYSIS

DEFORMED SHAPE DISPLACEMENT

Ty ;0.669

Tx ; 0.656

TORSION

Tz; 0.576

BUILDING C

COLUMN DIMENSION =550X300

Ty=0.748

Tx= 0.595

Tz=0.587

BUILDING D

COLUMN DIMENSION=300X550

Tx=0.736

Ty=0.609

Tz=0.565

BUILDING=E

AREA OF REINFORCEMENT

Ty=1.732

Tx=1.676

Tz=1.47

BUILDING F

Ty=1.736

Tx=1.678

Tz=1.462

reading of f

BUILDING G 25TH FLOOR

READING OF G

BUILDING H 25THFLOOR

Ty=2.99

Tx=2.871

Tz=2.344

READING OF H

BUILDING J

READING OF BUILDING J

INCRESING IMPOSED LOAD 10%

READING OF K

AFTER IMPOSING INCREASING 20% LIVE LOAD

Time period A Time period B

Ty=0.327 Ty=0.669

Tx=0.321 Tx=0.656

Tz=0.281 Tz=0.576

Time period C Time period D

Ty=0.738 Ty=0.609

Tx=0.595 Tx=0.736

Tz=0.587 Tz=0.565

Time period e Time period f

Ty=1.732 Ty=1.736

Tx=1.676 Tx=1.678

Tz=1.47 Tz=1.462

Time period g Time period h

Ty=4.17 Ty=4.416

Tx=3.98 Tx=4.22

Tz=3.167 Tz=3.285

TIme period J Time period K

Ty=4.425 Ty=4.435

Tx=4.231 Tx=4.24

Tz=3.291 Tz=3.297

Effect of building height on T, OF BUILDING A,B,F AND H

As the building height increase, time period increased.

Efect of column orientation on T, of building B,C,D

When the longer dimension in y axis as in building d, the time period in y axis less compared to x axis.

Time period C Time period D

Ty=0.738 Ty=0.609

Tx=0.595 Tx=0.736

Tz=0.587 Tz=0.565

Effect of mass on T, on building H,J and K

TIme period J Time period K Time period H

Ty=4.425 Ty=4.435 Ty=4.416

Tx=4.231 Tx=4.24 Tx=4.22

Tz=3.291 Tz=3.297 Tz=3.285

as the the mass increased ,time period increased. and we know time period directly propertional to mass,

so value ofT IN building k more than H and J

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.