Project 2
1) we downloaded door & the required data from TE.com & Hellarman tyton website.
Assumption-
1)We used 2 pole connectors 2 nos for name plate ligting
2)Used 4 pole conectors for tail LH & RH both lamps
3)1 nos 8 pole connector for inteconnection from roof harness
also after downloading, we defined as electrically & stored in a catlouge,snapshots as follows-











2) After defining electrically we arranged the connectors,clamps & clips at a proper location in assembly workbench by using smart move & manipulation command as follows-






3) After placing components, we start routing by considering actual practices & considering interferences as






4) We checked for bundle continuty & that found ok-


5)Snapshots for geometrical bundle-


6)After we go for harness flattening in flattening workbench by confirming parameters & maintained the orientations of branches as-



7) We create drawing view for flattened tail gate harness as-
