Project 1 - V&V SW Analysis - I
Test Plan to test the features of mobile –
Test cases
- If (power is off) --> black screen
else --> display on
- If user wants to turn mobile on --> long press the power button
If success --> company logo will appear at the center
Else --> repeat step 2
- If the step 2 is successful -->
Can user see the Apps/icons on the screen --> yes --> Success
- No --> Step 3 re-development
- If step 3 is successful -->
If the orientation of the icons is correct? --> yes --> Success
(like first icon is – call the phone 2nd is dictionary)
No - Step 4 Re-development
(check the orientation as per the requirement document)
- If Step 4 is successful -->
Is call my phone is visible --> Yes
-->is contacts are present in chronological order -->Yes
-->Step 5 Success
-->Re-development
Is call my phone not visible --> Re-development
- Is Dictionary lets user search for the words --> yes
-->Is orientation is correct --> Success
-->No -->Redo the Orientation
If dictionary is not visible --> development repeated
- Long pressing the Power button
-->is phone on --> yes -->Turn off the phone(phone screen should go black once the Goodbye message is shown on the screen)
-->is phone off -->yes -->Phone power should be turned on and check for step one should be repeated
- If the all the above steps are successful --> Yes -->
Then font size and font type selection should happen.
Check for font type – calibri
Check for font size –12
If yes --> success
Else --> update the details as per the requirement
- Is the UI is touch responsive --> yes -->
Is the all the touchpoints of the screen are working -->yes
If not --> check the hardware
If UI is not touch responsive --> check the hardware.
- Is the phone having button -->Yes
-->all the buttons should be replaced with touch responsive screen rather single screen on which multiple touch input points will be available
-->if not buttons --> the requirement is satisfied and successfully tested.
As per the requirement sheet the orientation of the apps/logos/search bar is tested successfully. UI is checked and once approved following step will be taken care of
Note --> Re-development is hardware means checking the hardware for some faults in the components.
--> For software Re-development, the code will be rectified for all the modules which deviate the requirement document.
- If all the steps are successful the device should be sent to User acceptance test.