Project 1- Traffic Jam Assistant Feature
1. The model was developed as per MBD guidelines and given requirements and submitted as .slx file with a detailed report.
first configuration parameters changed as per requirements.


3. Created SLDD with the given signals and parameters and submitted.

Created a subsystem as per requirement 1 as below:

Created 2nd subsystem as per requirement 2:

The overall model is developed as given below and the file attached.

3. Moder advisor report has been generated and found no failures and resolved the warnings and reduced to 14.

4. The model is converted into code using an Embedded coder and zip folder submitted
