Menu

IIT Certification Programs

Workshops

Projects

Blogs

Careers

Student Reviews



More

Academic Training

Informative Articles

Find Jobs

We are Hiring!


All Courses

Choose a category

Loading...

All Courses

All Courses

logo

Project 1- Traffic Jam Assistant Feature

Traffic Jam Assistant Feature Introduction to the Feature: Traffic Jam Assistant is one of the most common feature in Advanced Driver Assistance System. Traffic Jam Assistant helps the driver arrive more relaxed at their destination, even in dense traffic or in traffic jams. As a partially automated comfort function, the…

Project Details

Loading...

Leave a comment

Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.

Please  login to add a comment

Other comments...

No comments yet!
Be the first to add a comment

Read more Projects by Pavan Kalyan (13)

Project 1- Traffic Jam Assistant Feature

Objective:

Traffic Jam Assistant Feature Introduction to the Feature: Traffic Jam Assistant is one of the most common feature in Advanced Driver Assistance System. Traffic Jam Assistant helps the driver arrive more relaxed at their destination, even in dense traffic or in traffic jams. As a partially automated comfort function, the…

calendar

26 Feb 2022 05:52 PM IST

  • MATLAB
  • MBD
Read more

Project 2 Adaptive Cruise Control

Objective:

Main Project – Adaptive Cruise Control (ACC) General Overview: Adaptive Cruise Control Feature for passenger cars allows the host vehicle to adapt to the speed in line with the flow of traffic. Driving in heavy traffic or keeping a safe distance to the preceding vehicle calls for a high level of concentration. The…

calendar

15 Feb 2022 06:07 AM IST

Read more

Project 1 (Mini Project on Vehicle Direction Detection

Objective:

bjective of Mini Project: Development of MATLAB Simulink model as per requirement. Tag the requirements to the simulink model; tagging requirement 1 & requirement 2 to their corresponding subsystems is fine. MBD compliant changes, Data Dictionary creation & code generation is added advantage, and that is not scope of this…

calendar

13 Feb 2022 10:08 AM IST

Read more

Week 7 State of charge estimation

Objective:

1.Simulate the 3 test cases from harness dashboard and write a detailed report on the results ans: now at first have to simulate 3 test cases from harness dash board. we need to select the harness dashboard from we downloaded in the reference link.the first case battery model harnash dash is represented below. click on…

calendar

29 Jan 2022 01:57 PM IST

    Read more

    Week 1 Understanding Different Battery Chemistry

    Objective:

      1.Prepare a table which includes materials & chemical reactions occurring at the anode and cathode of LCO, LMO, NCA, NMC, LFP and LTO type of lithium ion cells.Give your detailed explanation on it 2.Compare the differences between each type of Li+ion batteries based on their characteristics   1.ans: Lithium-Ion (Li-ion)…

    calendar

    25 Jan 2022 04:41 AM IST

      Read more

      Project-1: Powertrain for aircraft in runways

      Objective:

       PART A 1.ans:   The different terms represent different weights or masses1. For each flight, the weights are taken into account for several reasons. A brief description about these is below: Manufacturer's empty weight (MEW)Also called Manufacturer's Weight Empty (MWE) or Licensed Empty Weight…

      calendar

      20 Jan 2022 12:06 PM IST

      Read more

      Week-11 Challenge: Braking

      Objective:

      1.ans: decleration conditions are similar to acceleration .acceleration increases in speed and acceleration  is reduction in speed.so similarly way to calculate braking power.  during braking also required the same amount of power required for acceleration so applying those standard equation we can calculate…

      calendar

      13 Jan 2022 11:36 AM IST

        Read more

        Week-7 Challenge: DC Motor Control

        Objective:

        1a.ans:  this model consists of a H bridge with 4 igbt - diode pair.the inputs such as duty cycle and step time are  given from pulse generator block and armature voltage control block In general an H-bridge is a rather simple circuit, containing four switching element, with the load at the center, in an H-like…

        calendar

        12 Jan 2022 05:48 PM IST

          Read more

          Week-6 Challenge: EV Drivetrain

          Objective:

          1.ans: different types of power converter circuits are employed in electric and hybrid electric vehicle: Types of Power Electronic Converters Power electronic converters are classified into four major categories. Out of the four major categories, two are further classified. A power electronic system may have…

          calendar

          12 Jan 2022 03:45 AM IST

            Read more

            Week-4 Challenge WOT Condition Part-2

            Objective:

            1.ans mappeed and dynamic sub system of electric motor/generator:   1.first we open EV Rreference Apllication in matlab with the help of help in matlab and then open passenger car model and then open the eletric plant and then motor block we find  motgenevmapped 2. where data points assigned in lookup tables 3.the output…

            calendar

            11 Jan 2022 05:12 AM IST

            Read more

            Week-3 Challenge: ADVISOR Tool

            Objective:

            01.ans: cosidering the 500 kg cargo mass and after menu of the drive cycle selecting the cyc -ftp driving  cycle.    keeping the all parameters are same    in the above interface we see the  distance is 17.8km. so vehicle can't travell the 45km in single charge.thay why we use 3 cycles . soc…

            calendar

            09 Jan 2022 03:12 AM IST

              Read more

              Week - 4

              Objective:

              1.ans     the power and water available the process is start .if any one that means water and power are absent porocess the could not move further step.       when  switch (both power and water) turned on the process start if those are not available they come to initial state. after completion…

              calendar

              27 Dec 2021 03:55 AM IST

                Read more

                Week -2

                Objective:

                two  challanges completed

                calendar

                24 Dec 2021 06:47 AM IST

                  Read more
                  Showing 1 of 13 projects