Challenge

Introduction to REVIT concepts

1.

AIM:To open a new file and save it giving an appropriate name

PROCEDURE:

  • Open revit
  • open new file
  • open the file
  • save it with approporiate name

STEP1

  • Open REVIT software.

STEP2

  • Under the file menu
  • Click "New"
  • Select the type of template u want //(Construction/structural/architechtural)
  • Click on Project
  • CLick on ok

STEP3

  • Click on save option
  • Name the new file as "revit intro"(as your choice)
  • click ok

RESULT:

2.

AIM:Save the new project file. Close and open using icons from file toolbar

PROCEDURE:

  • save the file
  • Close revit
  • open again
  • click on the open icon
  • click the file to open

STEP1

  • click on save from the previous file "revit intro"
  • Close the file
  • Click on the "open" file icon
  • a new window will open
  • click on the file u want to open(in this case "revit intro.rvt")
  • Click open

3.

AIM:From the architecture/ structure toolbar familiarize with options to draw a wall. Create a rectangular layout of walls of about 40’-0” X 35’-0”

PROCEDURE:

  • open the file
  • go to draw panel
  • draw the rectangle

STEP1

  • Open the file revit intro.rvt
  • Click on architecture panel
  • select any one wall type (architectural selected) //Architectural,structural,wall by face

//Now a cursor will be shown in the drawing space

  • draw a horizontal line of 40' //Starting from the top left corner
  • pull the cursor down and draw a line of 35'
  • go 40' towards left (in horizontal direction)
  • connect the ends of the walls //it'll join the walls

RESULT:

4.

AIM:From the Annotate toolbar use the aligned option to add dimensions to the layout

PROCUDERE:

  • go to annotate bar
  • select the aligned dimension

STEP1

  • Go to annotate bar
  • select the aligned dimesion

STEP2

  • select the endpoint of horizontal direction wall //Shows 40' length
  • click "shift" to change the direction of the dimension to take //Switch between horizontal and vertical direction
  • Click on vertical direction wall from one end to another end

RESULT:

5.

AIM: Use the project browser to switch to different wall types

PROCEDURE:

  • open project browser
  • go to families title
  • search for walls title

STEP1

  • open th project browser panel

STEP2

  • Go to families title
  • Expand the title

STEP3

  • go down to the walls title
  • expand the wall title
  • subtitle will be 1.basic 2.curtain 3. stacked walls
  • Choose the one u like to use

6.

AIM: Create a 3D view from the view toolbar and save the view with the appropriate name

PROCEDURE:

  • view bar
  • 3d view toolbar
  • Properties

STEP1

  • Go to the view bar
  • click on the 3DVIEW //To go to 3D view of the drawing
  • Now the 3D view will be shown

STEP2

  • Go to the properties panel //Properties panel at the right side of window
  • Click on "Edit Type"
  • A new panel window will open
  • Go to "rename" and change the name to "walls 3d view" //To input the new name

RESULT:

7.

AIM: Navigate through the 3D model using the view cube. Orbit/pan through the model layout created

PROCEDURE:

  • Use theview cube
  • Use the navigation tool to navigate

STEP1

  • Click on the View cube on the top right corner.

STEP2

  • Left click on view cube
  • move the cursor around in the different direction to move the obect in orbit

STEP3

  • Click on navigation panel
  • A panel will open as shown above

STEP4

To Pan

  • Click on pan
  • left click and move the cursor around to pan the object on window //to pan the object

To Orbit

  • CLick on the orbit
  • move the cursor in circlular or any direction to change the orbit

8.

AIM: Use the visibility settings option below to switch model to shaded, realistic, hidden lines options

PROCEDURE:

  • Go to Visual style
  • select different modes

STEP1

  • Go to Visual style located at the down left bar //In shape of 3D rectangle
  • Click on the icon

STEP2

  • Different visual style wil be shown
  • a.Wireframe
  • b.shaded
  • c.hidden
  • d.realistic
  • e.consistent colors
  • Ray trace

STEP3

  • Go to Hidden
  • It hides the lines which are behind an object or walls

  • Go to Shaded
  • It shows the shaded view of the object

  • go to realistic
  • it show the realistic view of the object

9.

AIM:Turn the sun path on and off to view shadings in the layout created

PROCEDURE:

  • Go to sun path icon
  • turn on the sun path

STEP1

  • Go to bottom left corner
  • Click on "Sun icon" i.e. the sun path icon
  • click "Sun path on" //To turn on sun path

  • Sun and the direction will be shown //Adjust the path of the sun according to the requirement

RESULT:

10.

AIM:Use the Manage toolbar to enter project settings, project name, and project issue date (choose according to your convenience).

PROCEDURE:

  • Go tot manage toolbar
  • Project information
  • edit

STEP1

  • Go to the manage toolbar
  • Click on "project information"

STEP2

  • A new window will open
  • Type the info as convinient

RESULT:

11.

AIM: What is the Analyze toolbar used in Revit? How it is beneficial for design and modeling

ANS.

  • Analyse toolbar helps you to perform analysis on our structural building.
  • The boundary conditions enable you to define point line and area boundary conditions in an analytical model.
  • It also helps in applying structural loads to your analytical model to assess possible deformations and stress in your design.
  • You can apply point, line, and area loads to your analytical model.
  • It also helps in applying different load combinations t the structure.
  • it helps in adjusting setting for automatic checking analytical/physicalmodel consistency,tolerances and analytical physical model consistency checking.
  • Apply structural loads to your analytical model to assess possible deformations and stress in your design.You can apply point, line, and area loads to your analytical model.

12.

AIM: What are the links that Revit supports to be linked to the model?

ANS: There are many links provided by revit ,This is provided to work on other files and edit/modify it in the revist software.

Some of the links provided by the revit are:

Go to the INSERT toolbar Now there will be shown the links as

  1. Link REVIT: It helps to link one revit file into another current files .It helps in combiling the different disciplines of the files
  2. Link IFC :IFC files are building information modeling files used to take the information for developing designs in revit
  3. Link CAD: It helps in importing the 2D cad files into the revit ot draw 3d models out of it.

13.

AIM: Why do you need the Collaborate tab in Revit? How it supports modeling and its efficiency

ANSWER

  • You can link multiple Revit models together, allowing team members to work in context.
  • Through worksharing, users on the same local area network (LAN) can work together in the same Revit model.
  • When collaboration needs to occur among users who are not in the same geographic location, use Revit Server or Revit Cloud Worksharing.

a.Revit Server connects offices who share a network but are not in the same geographic location.

b.Revit Cloud Worksharing is a cloud-based service that allows any Revit users inside or outside a network to collaborate on a Revit model.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.