Introduction to National Building Code and Steps in a Construction project
Q1
AIM: NESSITY OF BUILDING CODES IN MODELING OF DRAWING.
FOR THE SERVICEABILITY,ACCESSBILITY FOR EVERY KIND OF PEOPLE,FOR THE PURPOSE OF AESTHETIC,SAFTY, PROPER VENTILATION, DOESNT COLLAPSE DURING NATURAL CALAMITY OR DUE TO SELF LOAD,AND DO NOT COST ANY HUMANLIFE, WE REQUIRED SOME CODE TO FULFIL THESE REQUIREMENT ,WHICH IS KNOWN AS BUILDING CODES .
Q2
LIST OF GROUPS REQUIRED DURING THE MODELLING OF REVIT.
- group 1 :for development building planning aspects
- group 2: for structural design related aspects
- group 3:construction related aspects
- group 4:building services
- group 5 : plumbing services including solid waste management
Q3
LIST OF FIVE MAJOR STEPS
the five major steps occurs in project cycle are given by project management gropu
- initiation ; preparation of design and taking approval from clint ,mobilization ,site survey,
- planning ; contractor or vendor make planning for execution of work, manpoweer required, preparation of schdule, material and machine requirement ,
- execution: starting of work, excavation ,material,
- monitioring :work going as per schedule or not,approval of material and quality checked by clint person
- project closing:handover of project as per schedule with all concern paper and government authority.
Q4
EXAMPLE OF DIFFERENT DISIPLINE REQUIRED
- architec
- structural engineer
- civil engineer
- mechanical engineer
- electrical engineer
- plumbing engineer
- landscape engineer
- quantity serveor
- urban designer
- town planner
- fire protection engineer
- enviornment specialist
Q5
CLASSIFICATION OF BUILDING
- residential building
- commercial building
- industrial building
- assembly building
- educational building
- institutional building
- mercantile building
- storage building
a four unit appartment : residential building
b school with capacity 1000 student : educational building
c single unit shop:commercial building
d multi shopping complex: assembly building or commercial building
f steel machine factory :industrial building
Q6
DIFFERENCE BETWEEN DESIGN TEAM AND MANAGEMENT TEAM
design team responsible for design in each field like structure, archi, elec, mech, plumb,hvvac, and taking of approval from owner or clints
whereas management team is responsible to impliment the the design in the field.
Q7
MODELLING REQUIREMENT FOR THE PROJECT.
a height
b area of room
c passage
d wall height
e thickness
all are under nbc