Challenge

Introduction to National Building Code and Steps in a Construction project

1 ans :- Building codes or standards essential for modelling or efficiency of

drawings in revit are

* A set of standards that are uniform to all structures in the modelling process

* Protects the construction safety

the storage , resedential , hazardous, institutional buildings etc in ensuring the safety of residence

* Modern construction methods in enhanceing wide knowledge

* Provides building standards to approval from government agencies .

2 ans :- National building code groups that will be essential while beginning

the modelling in autodesk revit

GROUP A Residential buildings

GROUP B Eductional buildings

GROUP C Assembly buildings

GROUP D Institutional buildings

GROUP E Mercentile buildings

GROUP F Business buildings

GROUP G Storage buildings

GROUP H Industrial buildings

GROUP I Harzardous buildings

3 ans :- The major steps in project cycle occuring the steps including from conceptualizing the project to maintainance

and final stage

1 initiation

2 planning

3 execution

4 performance and management

5 closure

initiation - necessary to figure out objective of project , develop statement of work ,

feasibility study, identify the project stake holders, and approval

of the project .

planning - large project is broken or divided into smaller for different requirement stages like

create project plan ,work floor diagram , budgets ,resources, etc

execution - plan to action its the longest phase of the cycle need to execute all the work of bulding

or ... , brefing the work , monitoring the quality work , manage budgets , commumicating

with team about the work .

performance and monitoring

and finally

closure - major things involved in this phase is analyzing the team performance , analyzing the

project performance , conducting the post implementing reviews , finaling the accounts of

the budgets .

4 ans:- The different disciplines involved in the construction of the project are

construction- manageing the building by the civil engineers from begin to end including contractors ,

owners, designers etc

finance and estimation - accounting activities for the work purpose of the project.

contractors and bid

geotechnical condition design foundation and earth quick system to support the soil and transfer

of loads from structutre to settlements

structural - design structure loads for specific like buildings , bridges , towers etc

surveying - measure of physical features to determine the property lines and elevation difference for

producing maps

apart from these the architectural, structural, plumbing , mechanical , civil peoples involved in the different

disciplines in construction of project .

5 ans :- as per NBC norms

four unit apartment - group A residential building

school with capacity of 1000 students - group B educational building

a single unit shop - group E mercentile building

multi storey complex - group E mercentile building

steel machine factory - group H industrial building

6 ans :- * design team

helps to finalise team

evaluationaries in project

implementation of designs

*management team

accomplishment of the project

execute design

achieves the satisfactory completion of project

7ans :- from NBC norms

* the height limitation shld be according to nbc 2005

clause c 2.5 height of building should not exceed 15m

* for area limitation - from nbc 2005 clause 2.3.1

the minimum plot size with ground coverage not exceeding 75% shall not be less than 40nsq .m

in small and medium , towns and not less than 30 sq m in metropolitian areas

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.