Introduction to National Building Code and Steps in a Construction project
1 ans :- Building codes or standards essential for modelling or efficiency of
drawings in revit are
* A set of standards that are uniform to all structures in the modelling process
* Protects the construction safety
the storage , resedential , hazardous, institutional buildings etc in ensuring the safety of residence
* Modern construction methods in enhanceing wide knowledge
* Provides building standards to approval from government agencies .
2 ans :- National building code groups that will be essential while beginning
the modelling in autodesk revit
GROUP A Residential buildings
GROUP B Eductional buildings
GROUP C Assembly buildings
GROUP D Institutional buildings
GROUP E Mercentile buildings
GROUP F Business buildings
GROUP G Storage buildings
GROUP H Industrial buildings
GROUP I Harzardous buildings
3 ans :- The major steps in project cycle occuring the steps including from conceptualizing the project to maintainance
and final stage
1 initiation
2 planning
3 execution
4 performance and management
5 closure
initiation - necessary to figure out objective of project , develop statement of work ,
feasibility study, identify the project stake holders, and approval
of the project .
planning - large project is broken or divided into smaller for different requirement stages like
create project plan ,work floor diagram , budgets ,resources, etc
execution - plan to action its the longest phase of the cycle need to execute all the work of bulding
or ... , brefing the work , monitoring the quality work , manage budgets , commumicating
with team about the work .
performance and monitoring
and finally
closure - major things involved in this phase is analyzing the team performance , analyzing the
project performance , conducting the post implementing reviews , finaling the accounts of
the budgets .
4 ans:- The different disciplines involved in the construction of the project are
construction- manageing the building by the civil engineers from begin to end including contractors ,
owners, designers etc
finance and estimation - accounting activities for the work purpose of the project.
contractors and bid
geotechnical condition design foundation and earth quick system to support the soil and transfer
of loads from structutre to settlements
structural - design structure loads for specific like buildings , bridges , towers etc
surveying - measure of physical features to determine the property lines and elevation difference for
producing maps
apart from these the architectural, structural, plumbing , mechanical , civil peoples involved in the different
disciplines in construction of project .
5 ans :- as per NBC norms
four unit apartment - group A residential building
school with capacity of 1000 students - group B educational building
a single unit shop - group E mercentile building
multi storey complex - group E mercentile building
steel machine factory - group H industrial building
6 ans :- * design team
helps to finalise team
evaluationaries in project
implementation of designs
*management team
accomplishment of the project
execute design
achieves the satisfactory completion of project
7ans :- from NBC norms
* the height limitation shld be according to nbc 2005
clause c 2.5 height of building should not exceed 15m
* for area limitation - from nbc 2005 clause 2.3.1
the minimum plot size with ground coverage not exceeding 75% shall not be less than 40nsq .m
in small and medium , towns and not less than 30 sq m in metropolitian areas