1.
a) Observations
- Concrete is crushed at the bottom and the reinforcement is exposed.
- Concrete is spalled beyond the reinforcement which may be a sign of rupture.
- The beam top portion looked safe because of the flange advantage from the slab.
- The crack developed from bottom to top means rebar yielding occurs in support only.
Conclusions
- It's a form of Flexural failure due to the reversal of stress during an earthquake.
- During stress reversal, the top support experiences Compression, and the Bottom experiences Tension.
- Top compression is managed by Slab Advantage. Bottom tension wasn't satisfied by the provided reinforcement.
- Since the reinforcement got yielded, it can't be repaired.
b) Observations
- Cracks are along Beam-Column edge.
- Cracks seem to have developed through the structure as it looks much wider.
- Beam looks separated from the column at joints.
- Concrete isn't severely crushed.
Conclusions
- It's Beam pull-out failure due to insufficient development length of reinforcement in joints.
- During an earthquake, the horizontal movement of the structure makes this condition worse and detaches the beam from the column.
- Providing anchorage length between two existing concrete is very difficult. So, it isn't repairable.
c) Observations
- Cracks are exactly at the joint of the column beam.
- Cracks in the beam developed through its entire width.
- The slab also developed more cracks along the beam width direction.
Conclusions
- It's a Plastic hinge failure.
- The damage occurred only in the joint zone first of all.
- Cyclic lateral loading & stress reversal at the joints led to damage.
- Even the slab did its best to handle the Tension (The slab is severely cracked means, it has undergone tension with its flange condition). But unable to control the damage.
- The joint can be strengthened.
2.
a) Observations
- Concrete damaged at the top.
- Concrete damaged at all around the Column face.
- Beams are safe.
- The location of the column looks at the edge of the building.
- No walls are built along the column means it's probably on the Ground floor for Parking car movement.
Conclusions
- It's a Soft storey failure. Technically Plastic hinge formation.
- Due to the absence of infill walls on the ground floor, the plastic hinge forms at the top of ground storey columns during lateral movement.
- Based on the development of crush of concrete, it can either be repairable or Non-repairable.
b) Observations
- Concrete developed complete breakage diagonally.
- Longitudinal reinforcement is intact.
- Shear reinforcement spacing looks wider (which means probably lesser shear rebar provided).
Conclusions
- It is a Pure shear failure.
- Inadequate shear reinforcement compels concrete to take all the shear stresses.
c) Observations
- Column failed completely.
- Failure at the top of the column.
- There are two slabs connected to the column. Probably one at the mid-height of the column.
- The wooden piles might be post-failure support after the column failed, by providing a temporary prop to avoid collapse of the entire structure.
Conclusions
- It's a Short column failure.
- An additional slab or a beam connected to a Column in the mid-height leads to this effect.
- This leads to failure especially if the connection is unintentional and not accounted for in the design.
- The failure given in the picture isn't at all repairable.