Challenge

Foundation Design using SAFE

AIM:

To design an isolated footing.

PROCEDURE:

Define new properties like M20,Fe500

Define slab properties and draw the area and column and footing.Run the analysis.

`

AIM:

To design a pile.

PROCEDURE:

Open a safe software and initialize the setup settings.

Define new material properties.

Define slab properties for pile cap ,column and gor pile design.

Draw a pile and assign point spring properties in it.

Assign load to column

Add strips and assign the strips in it.

Run analysis.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.