Challenge

Creating Kitchen layout, Hatching of Architectural elements and sectional view of an Industrial Building in AutoCad

CHALLENGE WEEK - 9

AutoCADD Essential

Question no.1:

  • AIM:
  • To create the layouts of the Kitchen and provide hatches pattern
  • To use text and dimensions.
  • Procedure:
  • Select the line tool.
  • A rectangle of required size was drawn whicch is the otter line of the wall of a kitchen layout.
  • The line is offsetted for 300mm to represent the wall of the kitchen layout plan.
  • Then the door size is cut to draw a door and place.
  • The door of required size was drawn with line tool and arc tool and made as block.
  • The block was saved as door.
  • Then the block was plced in the place were the wall lines are cut and provided with space.
  • And another place was cut for the purpose of placing the window in the kitchen.
  • The measured window size was drafted using line tool.
  • Then the drafted window was place to the specified position.
  • Then the components of the  kitchen are drafted according to the kitchen spaces.
  • Then measurements of the components are marked with the required dimensions lines.
  •  The components are made as blocks and placced in required places.
  • The measurement for all the lines and components are marked perfectly.
  • Then teh walls are to be hatched as per requirement.
  • The cut plan view is hatched accordingly.
  • The coreplaces are hatched with solid hatch and the wall cut is hatched with cross lines.
  • The proper texts are marked and represented.
  • The lines are drafted and shown perfectly with correct line scale and lien types.
  • The wall lines are marked with solid lines.
  • Thus the required kitchen layout was drafted with all requirements and specifications.

  • RESULT:
  • Thus the required kitchen layout was drafted with all requirements and specifications.
  • The drawing contains the texts and dimension of required sizes.   

Question no.2:

  • AIM:
  • To create the elevation of the plan as mentioned
  • To use proper dimensions and hatches.
  • Procedure:
  • Select the line tool.
  • The elevation of the plan was drafted using line tool.
  • This elevation was drafted by using predrawn plan of a residential building.
  • The outter sketch of the elevation was sketched with the reference of the residential plan.
  • The elevation contains windows and balconies.
  • The window was drafted with required dimesions.
  • Then the window was made as a block.
  • The window also contains hatch of a galss.
  • The window thus formed as block was named as the elevation window of style 1.
  • Then the drafted window was then copied to required places.
  • The The elevation also contains certain designs in the elevation.
  • The design was drafted with line tool.
  • Then th same was made as block and the block was named as elevation design.
  • Then such design was copies to required places.
  • Then two rectangle of the elevation was drafted as design.
  • Then the rectangle was made as block.
  • The block was named as elovation rectangle design.
  • The block was then copied to the required positions.
  • Then the balconies were drafted.
  • The head room of the building was drafted  in the elevation.
  • Thus the required elevation of the residential plan was drafted.

  • RESULT:
  • Thus the required elevation of the residential plan was drafted.
  • The drawing contains the texts and dimension of required sizes.   

Question no.3:

  • AIM:
  • To create the section view of an industrial building
  • To use proper dimensions and hatches.
  • Procedure:
  • Select the line tool.
  • The drawing is about the section of a industrial building.
  • The section is cut such that it shows the pump room of the industrial building.
  • The section is drawn with grid lines.
  • The sections shows the cut of the wall.
  • The walls are hatched with concrete hatch.
  • Then the below of the wall is hatched with the solid hatch.
  • Then the wall sizes are marked with dimesions 
  • The size of the cut room is marked.
  • The duct lines are drafted in the section.
  • The dimensions are marked with the reference of the grid line.
  • The lines are offseted to form the wall of the industrial line.
  • The manhole for the pump room is marked in the corner and shown in the section.
  • Thus the required section of the pump house of an industrial building is drafted properly.

  • RESULT:
  • Thus the required section of the pump house of an industrial building is drafted properly.
  • The drawing contains the texts and dimension of required sizes.
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.