Challenge

Challenge 4

Ans.

Aim and Introduction:-

  • The aim of this challenge is to create the model as per the given information and data.
  • Then to analyse the structure for the results.ults with each other.

Staad Model:-

  • A four girder system is to be created .
  • First of all a node is created and then the width of the deck slab has been created with 2m spacing each.
  • Then the over hang portion of the bridge has been created at -ve X-direction at a distance of 0.7m as given.
  • Then accordingly the whole structure has been created in both the sides.
  • Then diffrent type of Supports considering the functional behavoiur of bearings for the model need to be created.
    • The support releasing the Mx, My & Mz has been created.
    • The support releasing the Mx, My, Mz & Fx has been created.
    • The support releasing the Mx, My, Mz & Fz has been created.
    • The support releasing the Mx, My, Mz, Fx & Fz has been created.
    • The supports to the respective bearing positions has been assigned.
  • Material Property
    • The material property as given has been created.
    • For End Section
    • For Mid section
    • Material property for cross girder has been created as dummy member.
    • The properties has been assigned to the structure as described.
  • Loads & Definations
    • Vehicle definations created.
    • Self weight has been defined with a factor of -1 & applied to the whole structure.
    • Different loads as SIDL for wearing coat has been defined and assigned to the intermediate girders
    • SIDL for crash barrier loading has been created and assigned to the end girders.
    • Moment due to SIDL eccentric loading is to be applied. Moments at the intermediate girders has been applied in both the global x direction.
    • vehicles Loads has been generated considering the length of the boggie and the length of the span. Also considering the intervals at 0.25.
    • Two trains is being considered as per the with of the structure.
  • Material Property
    • New material for M60 and dummy member has been defind with the following inputs.
    • Property M60 and dummy has been assigned to the model.
  • The model has been analyzed and results with 0 error.
  • Results
    • Max deflection of the struture with summary sheet.
    • Reactions with summary sheet.
    • Value of Mz with summary sheet.
    • Value of Mx with summary Sheet.
    • Value of Fy with summary sheet.
Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.