Aditya Suresh
Impress and express through your work.
Introduction
14 Projects
Project 1
Base mount bracket
30 Aug 2020 06:50 PM IST
Project 2
Week 7 Part-2
13 Sep 2020 05:49 PM IST
Week 8 - Challenge 1 - Draft Analysis on a Fan Cover
the above images are from the draft analysis performed
06 Jun 2021 03:05 PM IST
Week 8 - Challenge 2 - Base Bracket Design
week 8 challenge 2
06 Jun 2021 03:47 PM IST
Week 8 - Challenge 3 - Switch Bezel Design
switch bezel
06 Jun 2021 04:56 PM IST
Week 8 - Challenge 5 - Core & Cavity Design
UPLOADED FOLLOWINGS DRAFT ANALYSIS REPORT CAT PART FOR SWITCH BEZEL AS PER INSTRUCTIONS GIVEN ABOVE I HAVE TRIED TO MAKE CORE AND CAVITY WITH BASE BRACKET ALSO AND ATTACHED IT .
17 Jun 2021 05:26 PM IST
Week 8 - Challenge 4 - Coin Holder Design
STEPS INVOLVED FOR DRAFT ANALYSIS CREATING TOOLING AXIS FOR THE COMPONENT AND CHECKING IN WHICH DIRECTION THE COMPONENT CLEARING THE DIRECTION FIRST FINDING THE FACES NOT CLEARING THE TOOLING AXIS AND MAKE IT CLEAR TO THE TOOLING DIRECTION BY MAKING…
27 Jun 2021 04:16 PM IST
Week 9 - Attachment Feature Creation - Challenge 1
Objective – to design rib for coin holder Tooling direction Draft analysiS for solid and class a rib design RIB ROOT THICKNESS and other design rules for rib design isometric , front, top view of the body
27 Jun 2021 05:40 PM IST
Week 9 - Attachment Feature Creation - Challenge 2
Attachment feature report Dog house – This is an engineering feature which supports other feature to operate easily The above image shows the draft analysis on dog house in which the the surface is clearing the tooling with 1.5 degrees with the tooling axis It is a front view which the front…
29 Jul 2021 04:13 PM IST
Week 9 - Project - Master Section Development
The below attached ppt having all the master section developed part with b side features including ribs and dog house with 4 way locators
16 Dec 2021 04:58 PM IST
Week 11- Assembly Workbench
the zip file contains model 1 ,2 and report of assembly workbench
27 Dec 2021 04:20 PM IST
Door Arm Rest Week 8 Challenge
The zip file contains both cat part and report of draft analysis
01 Feb 2022 05:52 PM IST
Week 9 - Project 1 - Door Applique Design with Engineering Features
The attached zip contains report of draft analysis and cat part of door applique
01 Feb 2022 05:56 PM IST
Week 11 - Final project
TITLE- DOOR TRIM PANEL SOFTWARE USED- SIEMENS NX PROCEDURE 1-CREATING ALL PRODUCTS I) LOWER SUBSTRATE II) LOWER MAP POCKET III) UPPPER MAP POCKET IV) DOOR ARM REST 2-CREATING TOOLING DIRECTION ACCORDING TO THE SHAPE AND STRUCTURE 3-CLOSING THE BODY WITH 2.5mm THICKNESS 4- ADDING HEAT STAKES…
05 Mar 2022 11:22 AM IST
1 Course Certificates
2 Workshop Certificates
What makes a good BMS? Module relevance & its role as safety manager EV Tech
Academic Qualification
B.Tech
SRM Institute of Science and Technology
01 Aug 2016 - 27 Mar 2020
12th
Kendriya Vidyalaya JNU
02 Mar 2015 - 03 Mar 2016
10th
Kendriya Vidyalaya JNU
04 Mar 2013 - 03 Apr 2014
Here are the courses that I have enrolled
Similar Profiles
Ladder of success cannot be climbed with hands in pocket.
The Future in Motion
Give more than what you get you will get more than what you gave
Avid learner