Topographical Surveys and Typical Sections for Roads

A free lesson from Skill-Lync's Roadway Design with OpenRoads course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Week 1 Session 2”

What will you learn in this free Roadway Design with OpenRoads lesson?

The instructor describes reconnaissance, preliminary and final location surveys, and why survey data must be reviewed before design. The lesson also compares plain, rolling, mountainous and steep terrain, then reads existing and proposed typical sections, including a two-lane road widened to five lanes.

  • Reconnaissance, preliminary and final location surveys
  • Terrain classes and their design codes
  • Elements shown in a typical section
  • Existing versus proposed typical section drawings

What comes after lesson 2?

The next free lesson is lesson 3, “Horizontal and Vertical Alignment Design Elements Explained” (32 min). Later in Skill-Lync's Roadway Design with OpenRoads course (paid): lesson 4, Week 1 Session 4; lesson 5, Week 2 Session 1; lesson 6, Week 2 Session 2. The full course has 59 lessons (26 h 54 min of video); see the course overview or its price and syllabus.

Lesson transcript

Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.

Hello and welcome back. We are doing roadway design using OpenRoads and we have completed till now the design summary report and we'll be continuing on the topographic survey. All right. So going to that slide now. So basically in general considerations about project surveys or kind of investigations what are required, that's a very important aspect with which a project depends upon. It relies upon that data. It's going to start with that. So it's a very important aspect of it. So one of the preliminary considerations in the location and design of a road is first of all the overall cost of transportation which has to be minimum.

So when I say cost of transportation minimum that is initial construction, traffic operation and maintenance. So for satisfying all these considerations, detailed and accurate surveys and investigations are required. So all the operations involved should be planned in advance in a logical sequence and the survey parties must be fully aware of the roadway project. So that is very important. They capture the map, the ground features which are there. So there are different kind of alignment surveys, first of all, a reconnaissance survey, what we call is. And the main objective of this one is to examine the general character of the area for the purpose of determining the what is the most feasible route for any further detailed investigation.

So a very basic, very rough one. What kind of feasibility is possible? So as mentioned in the workflow as well, the kind of roadway projects is there planning level, schematic feasibility, pre feasibility, detailed design. So I depend upon that in every stage, of course, these different kind of surveys are taken. So what all is done in this feasibility survey, reconnaissance survey is study the topo sheets, study the survey sheets, maps and photographs. If possible, do our aerial reconnaissance, if that area is not accessible or have to be looked upon very with overall to understand the overall area from where the alignment has to be taken with the options for that.

Of course, there are ground reconnaissance to examine by walking and riding over there and checking most of the things there, climatic conditions, all the facilities, what facilities will be required? What are the resources available there? And so that's all covered specifically in a feasibility kind of survey. So survey, the next one which will come is the preliminary survey, which is at a relatively larger scale of with instruments basically to prepare some accurate base plan, which will show the physical features which are going to affect the highway location, the longitudinal section and the cross section.

So the idea of the study is supplemented with field inspections and the main objective is to fix the center line of the roadway of the road basically. So this is the first stake where, you know, OK, this will be the first draft of the alignment with the help of preliminary survey can be decided upon. Of course, different scales are adopted depending upon the type of terrain and the stretch of the roadway. It's there and moving on in these survey basically determining the final center line is the next step, which which comes basically in the survey.

So where few alternatives of the alignments of are drawn and studied with the what's the best on satisfying the engineering and aesthetics and economic requirement. So that's all the important aspect of it. Moving on, a trial grid line is taken into account from the perspective of the controls of roadway, railway or river crossings. These are important aspects where, first of all, how it is crossing, how it is going to cost effective, how it's going to impact the operations of those if it's a railway or roadway crossing, how it's going to impact environmentally if it's a river crossing.

And so it's in conjunction, the design of alignment and adjustment basically has to go hand in hand. Horizontal curves, including spiral transition, vertical curves. Those are drawn in this final center line once the preliminary survey is done and the spots which are taken at. So it becomes the final location survey after that, where the at what interval the spots have to be taken. So it has to be a dense data so that all your detail, final earthwork quantities and calculation is dependent upon that. So those all criteria is very important.

And while doing the final location survey, it's a mean for transferring the final center line, which has been done in the preliminary survey and fixing the center line onto the ground. So basically sticking out the alignment, basically, which is going to be helpful for computing the earthwork and so on, basically. So all this is also dependent upon what's the scope of a project and the survey as well. Okay, so scope means basically, as I mentioned in these steps, it is a reconnaissance, it's a preliminary, it's a final staking out or, you know, completing the survey for fixing the alignment.

That's very important. There are types of projects which will have various kind of surveys. And right now we are specifically talking about topographical survey, real time data, which is captured from the ground, machineries type of total stations, which you might have seen on the ground in place with a tripod. It's having a laser, which, you know, fixes its accuracy. And those are kind of very accurate and precision based machineries nowadays used a lot. Also advanced technologies are also there. We have to capture the main elements, what all elements have to be captured, the right of way.

What is the property limit or the what is the public ROW or the public space available to build that infrastructure, that road? Okay, so that is something very important. That survey is again differently conducted in some projects and somewhere it is readily available from some maps. And the government agencies must have, might have been staked out earlier and then the roadways are planned. Across the alignment, intervals of basically we are going to build a four lane, six lane. Okay, but there might be expansion plan. There might be different conditions as per the geography.

So that's why number of spots to be taken across the alignment and beyond the right of way is also important from future expansion point of view. And basically the design criteria is for creating the final all of those aspects is very important. Which is plain terrain, rolling terrain, mountainous and steep terrain. So once we come up with entire digital terrain modeling of this our survey, the kind of terrain is being identified and the respective design standard codes have been listed with then which will be used in our design summary report.

So many of our factors depend upon these criterias and which is the important aspect of it. So henceforth moving on, the survey is the basis of our project. If anything goes wrong here, any data is missing, anything is not good. One must as a designer, as an engineer, as a user, basically you must be reviewing the data, what you have received and not just using it as it is. Not recommended typically, review it once and you find any discrepancies, any missing data. You must report that and because you have to rely on this data for your entire project designing.

All right. So moving on, because these design criteria, as I mentioned, are different for different kind of terrains, a plain terrain, a rolling terrain, mountainous and steep. So in IRC, it's mentioned with its own segregation, basically at what percent to what percent is a plain terrain. With the name itself, basically, it's where typically flat surfaces are there in the cities. Basically, there are no hillocks and ups and downs. It's a kind of plain terrain. OK, in AASHTO code, it will be different according to in AASHTO as well.

It will be different for each state or each city or county as well. OK, in the districts as well. So in IRC as well, though, it is mentioned. But again, it is segregated down to the districts as well. But the main criteria which rules at the top is its country's codes. Finally, that's why and so on, basically, with a rolling terrain, mountainous terrain and steep terrains with the hilly roads and extremely hilly roads. All right. So that covers the topographical survey part. And moving on to the typical sections, the typical sections are the one which mention all your design elements which are there across your project explains in a typical sections.

It's a summary of your road, basically, in forms of its pavement depths, in form of its horizontal, how many leans and those things which will be looking at it soon. So these elements are the elements what is, of course, one thing is existing that, OK, this is the existing condition which we showcase in the project. This is the condition which we are going to propose something new. Now, in the detail design project, typically, it is not defined that it will be 12 feet. In our 3.5, 3.75 meter lane or what the shoulder width will be.

It is defined in the planning stage itself. Yes, you can change some things in the detailed design for sure. Not necessary that you cannot because that's the final output on which it's going to matter. So existing and proposed lane configurations are typically shown in the cross-section elements. A baseline or the centerline location is freezed on the basis of your survey and you show that in your cross-section. So when I'm saying baseline hash centerline, always not necessary alignment, okay, which is called a centerline or baseline, is not going through the center of the road.

It can be offsetted anywhere, relevantly anywhere, okay, but it can also be two centerlines. So it cannot be called as a centerline. It can be called as a baseline, okay. We'll see that in the next figure, a diagramical representation, the cross slopes of the roads. And why it is important to show there, the lane, the shoulder, the share reduced path, the sidewalk, all these and anything else. Okay, I'm just listing it few typical of these elements, the width of that, the cross slope of these things.

Okay, if there is a ditch on the end, a V ditch, a flat bottom ditch, any other design ditch, what is the desirable and maximum front slope and the back slope of that in the cut and fill conditions? What are the clear zone width considerations given? This is related to the some safety aspects I mentioned in AASHTO codes as well as other codes. Roadway and right of way widths, very important aspect. It shows what's the limit of the roadway to be built and what's the right of way available for building this road and what's the future adjustment being taken into consideration right now, which we can design, which we have in place right now.

And finally, the pavement layers. So what's the depth of each layer and how it is designed? Okay, so this diagram moving on is showing the existing typical section. As you see over here is showing what are the first of all, the arrow showing is the travel direction of a road. So this is a cut cross section as you can imagine. So this is alignment and you have cut the cross section. Basically, if somebody is not aware of or never seen this one kind of thing. So why this is dotted?

Because it's existing. Okay, anything existing will show out in a gray out color or a screen back color or a dash line. So that a solid line is something we'll see in the next slide with the next picture. What's a proposed cross section look like? A typical section look like and an existing cross section look like. And these are typical ones. There are also something called as design cross sections or just it is called as cross sections, which are the real time after designing your alignment corridor and everything.

One can view those. So in these ones, you see the travel direction arrows. It's going northbound and southbound. What's the lean width? What's the total roadway width? What's the cross slope over here and flowing direction basically? So how the cross slope is going to build the road? What's the clear width available? What's the right of A available? So you see existing right of A written over here. What are the ditch and the slopes for it? It's mentioned as 5 to 1 usual, 3 to 1 usual, 2 to 1 maximum.

So this is all the existing conditions which are there. So on basis of this one, this is important to show in the project so that when you are proposing something new, what is the existing condition to know is very important. So moving on to the next slide, which is going to show you the proposed typical section. OK, and as you see over here is existing line. OK, I'm just don't focus on these one right now. Let me come back there. So this existing line work, which you see, OK, over here is the existing roadway, which was let me go back.

OK, so this is the existing road, which is two lane. And now they are making it as five lane. OK, which was just two lane over here. So the existing right of A, you see this one over here mentioned. So this is a very important aspect to start with, to review and see, OK, for an engineer, for a designer to start with your modeling in directly in the software so that this is going to help you to build your templates, help you to build your corridor.

OK, also to lay out your design. Proposed typical sections can can be just one as well as multiple. OK, depending upon the size scale of the project and how it is exactly. There are any transitions. Is it having any is it of course the two lane is it's going and transitioning to five lane or we are completely building the entire scratching out two lane and completely building it five lane. So where are we tying this road? OK, it will be tying into somewhere, maybe directly to an existing intersection.

So that's also important. So what does this proposed typical section shows is important. So all the aspects what we have seen in the existing, it's now clearly mentioned. As you see, first of all, these are the solid line works, which shows that this is a proposed work. OK, very important to understand the travel directions are mentioned here. So now there are two lanes. OK, earlier existing only there was one lane and there are two lanes going north direction. So up and two lanes going coming south.

OK, that one. And in the center, there is a twin turn lane. OK, twin turn is basically concept somewhere, not in every city or state or country, I would say, but it's undivided highway. It's not a divided one. And this side going the north side one going can do a left turn and the right turn lanes basically. And the striping will be different over here. The lane width, if in case you can visibly see, it's a bit different because for sure it has to be a bit more.

These are coming from the design consideration. So you have to refer to your design manual to come up with these all dimensions, which are star over here. OK, so that's important. The lane direction, the slopes, the cross slopes, which have been mentioned here. Also, main thing I am. This is the center line of the road. OK, so that's the center line of the road. The proposed right-of-way of the road. OK, so what's the proposed ROW, total land width available for your current proposed condition as well as if there is any space for future or not.

OK, so that's something important. The lane configurations are seen. There is a CCG, curb gutter. OK, there is a curb and gutter basically available here. So it's a urban section and there's a sidewalk available. There is a buffer zone over here. OK, there is a small buffer zone available before the sidewalk. So over here on the left side, it's a reduced path and it's a sidewalk on the right side. So and the clear zone for clear zone on both the sides. Clear zone is an aspect where just to tell you in brief is a car if collides, OK, and it must collide and land down safely.

And that's a clear zone width, which is mentioned in the manuals. So what's the total berm width? So this whatever is designed from the back of the curb till the edge of this point is the berm width. And the bike lane is also given inside the road width before the curb and gutter, which I just missed to mention that. So bike is cycle lane, which can also be called as bike lane and the end conditions at the end, which is mentioned as four is to one and three is to one maximum and minimum.

So this all mentions the proposed typical sections horizontally in the horizontal direction when you cut the cross section across your alignment vertically. Basically, it is showing us the pavement depths, the details of pavement depths, subgrades, base, the base and the top layers. Basically, this comes specifically, this is not this is not the standard one, OK, these are the ones which are coming from the geotechnical report. And this will vary as every as per every project and you are specific to your project whenever you are going to do that.

So this is about the proposed typical sections. And before we move on to the another part of it, our typical sections, which you will be required to design and draw basically as a part of your assignments. So do make sure that and this is not something open roads modeling, OK, if in case I speak in terms of modeling or designing our project. So this is something 2D what is to be drafted. OK, and it's important from the aspect of your design manual consideration or what have you understood about your project.

If anything goes wrong over here, a person is going always going to refer to the proposed typical sections at the very start, because these are the sheets in the plan production set after one sees the alignment layout sheet, the site layout sheet, the project location layout sheet. The typical section is the one which comes after that. And these all. Dimensions which are mentioned over here in asterisk right now are the ones which must be coming from your design menu. So I'll take a break over here and we'll continue in the next video.

Want the rest of Roadway Design with OpenRoads?

Get the full course syllabus and fees.

The full course is paid (₹40,000). We'll send the syllabus and call you back within one working day.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Full course · paid

Unlock the full Roadway Design with OpenRoads course

The remaining 56 lessons, mentor-reviewed projects and a certificate come with the paid course (₹40,000). Leave your details: we'll send the syllabus and fees and call you back.

Get the syllabus and fees

A counsellor calls you back within one working day.

By submitting you agree to our Terms and Privacy Policy.

Grow by Skill-Lync · free lesson

Start watching

Free, no payment. Leave your details once and every free lesson on Grow plays straight away. A Skill-Lync counsellor may call you about the full Roadway Design with OpenRoads course.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.