Roadway Project Workflow and the Design Summary Report
A free lesson from Skill-Lync's Roadway Design with OpenRoads course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Week 1 Session 1”
What will you learn in this free Roadway Design with OpenRoads lesson?
The instructor outlines the course modules, from terrain modeling to corridor modeling, intersections, quantities and plan production. The lesson then walks through the roadway project workflow and the items listed in a design summary report, such as lane width, shoulders, median, curb type, culverts, design speed and clear zone.
- Course modules from terrain to plan production
- Parties involved in a roadway project
- Items recorded in a design summary report
- Design speed, grades, cross slopes and ditch slopes
What comes after lesson 1?
The next free lesson is lesson 2, “Topographical Surveys and Typical Sections for Roads” (20 min). Later in Skill-Lync's Roadway Design with OpenRoads course (paid): lesson 4, Week 1 Session 4; lesson 5, Week 2 Session 1; lesson 6, Week 2 Session 2. The full course has 59 lessons (26 h 54 min of video); see the course overview or its price and syllabus.
Lesson transcript
Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.
Hello and welcome to the new course with Skill-Lync, Roadway Design with Open Roads. So the objective of the course is basically to understand the open road designer software, which you will be learning while actual hands-on practice with a couple of samples and a project basically. And also to understand the roadway design of the basics, which we'll be covering in the first lecture. So this course covers basics of roadway design, terrain modeling, multiple things of how to create a terrain, how to export, how to import terrain models, how to create complex terrain models and like those things.
Geometry design where horizontal geometry, vertical geometry, profile design, alignment design will be seen with various tools, with simple tools, with complex tools, design standards with that. So we'll be looking at that and moving on will be the corridor modeling, which will involve the actual 3D modeling part of it. It's a very good module, which ORD, Open Road Designer can be called shortly as ORD. It's a very strong tool of corridor modeling, the specific one within that is template designer and multiple miscellaneous tools in that, super relation modeling and designing, which will show you the dynamic changes as you go, how it changes with that.
Intersection design, so which can be done in ORD with civil cells, it's a new concept, civil cells, so we'll see that. And once all our project is ready, how to take out quantities and the quantity calculations, what all reports we can generate, specifically horizontal geometry report, profile report, quantity reports, or so those kind of reports which we can generate. And many more are there, we'll see in that module, and once all our modeling is done, the end part comes like the production part, where the plan set, plan and profiles, plans, typical sections, or cross sections are to be generated, to be created in PDF, and to be printed.
That's our final output, what we see on paper. So that will cover in the production part. So this all will cover the entire course, so let's move on with our first topic for the week, roadway design fundamentals. So in a roadway project, typically the workflow or what all parties are involved, what our consultants are involved, so with that it is aligned, the workflow basically. So basically, you need a ground data, you need some kind of surveys basically, which is called as a topographical survey. So where our alignment is going to go, it might be a green field project, like a brand new alignment, where there is nothing, just a barren land.
And we want to do a builder road, as built road, like it's an existing road in place, which we want to reconstruct it, or widen it, or resurfacing is there. So depend upon that, the survey category also depends. Typical sections are required after that, basically. So once we set a typical section, it's what is the typical width of a lane, what is a typical cross slope, not a design one on specific horizontal curve, or not a slope which is on super elevation, but a typical slope.
So that typically we have decided to go with these lanes, lane width, or turn lane width, and this is the curb type, so two feet curb and gutter, what is a walk over there. So these kinds are mentioned in the typical section. Geometry design standards, like we said, in the horizontal geometry and the vertical geometry, what will be the radius curvature for what design speed, and when is a horizontal curve actually required. So that thing is important. So between two tangents, when you insert a curve, the delta bearing change in the angle is more than one degree, typically, I'm saying, not every time, but it depends upon the speed and the category of the road.
Then we provide a vertical curve, so the design standard for those. So the K value, the passing side distance, and stopping side distance are dependent upon that. So the crest curve, the valley curves, where we design, those will be there. Super elevation design on super elevation, what maximum Emax we want to take, and we design that. The transition lens on the super elevation, on the curve, on the tangent. So this is typically a super elevation design. Of course, the radius value is also a constraint that if we have right of way over there available, enough space available within the public ROW, and we can give a decent curve where super elevation is not required.
So it will not require a super elevation. So, and the category of the road also restricts these design standards, also the type of terrain where we did the topographical survey, and the type of terrain will also define a few things. Now, once all the design what we do, and of course, there is drainage involved, there is traffic involved. I am just specifically mentioning to some geometry part of the roadway design over here, because that's the software all about. Of course, pavement design is there. So this all doesn't comes up in the software, but this I'm typically mentioning if you are fresh out of college or your experience and you just want to take a refresher course.
So this is mainly towards the geometry part of roadway project workload. So once you do all these things, a typical thing is required is the production where your index sheet, your cover sheet, your project layout map, what is the project layout, then key location, plan and profiles, and utility drawings, storm crossing, covert crossings, structural drawings. These all drawings, cross sections, summary of quantity sheets, estimate sheets, these all form the entire plan set of the project. So once this is done, like it is standard and goes for construction.
So we'll see in next slides, what all is there. So who all multiple agencies are involved while doing this project workflow basically. So as I mentioned the activities just now, so aligned with that are the agencies which are involved. So there is a design consultant, engineering consultant, so who can do traffic, who can do roadway, can do just pavement, can do geotechnical consultant. So just be a bridge consultant, design consultant, so there are multiple design consultancies involved as well as actual execution agencies involved and surveying agencies involved who have to go on site and do field visits and gather some data or different kind of data.
So there are traffic services required, so these multiple agencies and are grouped together by the public authority, say NHI or PWD or any state government road corporation or any special vehicle formed anywhere by any state or country maybe. So those all agencies are involved in a project workflow. So when we start any project for a roadway design consultant, what is important for you to actually start before doing anything is want to create a design summary report, a DSR. I will call it as a DSR. DSR is also called, so don't get confused with DSR with district schedule of rates or something, but over here, design summary report I'm calling a DSR.
Why this is important, because this will give you an entire list or the entire contents of the project details from design perspective. So whenever you want to come and refer back to your basics of, okay, on what basis I did this in the project? Why did we give this super elevation transition length or et cetera, et cetera. So let's see in detail what exactly comes in a design summary report. And the roadway name, what name we are going to give. So it of course depends upon the naming nomenclature is defined by the public authority in different countries, in different cities and states.
It is different. So for India, we have expressways. We have national highways, on access controlled state highways, SH, NH, what we call. And in U.S., there are, of course, interstate highways, federal highways, and et cetera. Basically, the streets have specific name as per they are specifically in the grid. Sometimes there are rural highways. Basically, there are urban highways, urban roads, city roads. So those kind of one depend upon where exactly this project is located. This is a important aspect, which if any new person comes in and he must know that.
So that's very important. What is the length? How much mile or how much kilometers this project will be? What are the limits? Limits means what is the start point, a reference location or a key location, basically. So it is starting at specific intersection or maybe. Some benchmark or some school or some reference point basically, the start and the end location. That is a limits. What type of work we are going to do in this roadway design project? Is it a new construction? Are we, as I mentioned at the start briefly, so new construction in a greenfield project from point A to point B, say, taking example from Pune to Mumbai, I am going to design a new entire road, say the freeway, which was built a couple of years back. So that was a greenfield alignment. So that is a new construction which happened. But now if in case I go and even specifically the public authority goes and want to rebuild it or widen it, so that will be either reconstruction or realignment or widening.
So depends upon, of course, the scope of various locations or whatever the client is coming up with. This type of work also is very important. Also overlay and milling, if just want to do the resurfacing, if the top coat is not in a good condition as per the standards, that is a different kind of work again. So what is the class of the roadway? What is the class of the roadway? Major arterial, arterial, village road, city road, and etc. So basically our national highway, freeway, these class basically is defined in the planning field itself.
So these all what we start is all things which we can refer to from where do we can get this data, but some planning work is done before when we get before in this. So the class of the roadway is defined. So the class of the roadway is defined. How many traffic lanes will be there on this project? In which direction? In both the direction, is it a divided or a not divided road? So are there any turn lanes? Are there any continuous turn lanes? So what is the lane width? So these all come with the traffic warrant studies and the level of service will be determined in that.
So again, this comes from the previous work or planning stage done and that info we will have to pull up on to in our DSR. So lane width typically say in metric 3.5, 3.75 depends which road we are doing. I will say 12 feet and 11 feet is typical in the Imperial in US and it will be differing as per cities and countries and states. So shoulder width. Do we have a shoulder on after the travel lane on the outer side or inner side as well? There are shoulders provided.
So what is the width for that? Is it a paved shoulder? It's a earthen shoulder or so that is important. Is there a median? If there is a median, it's a divided road. What is the median width? Maximum and minimum which we have to be given. So of course, when we come with a median, it will possibly will have a curb and gutter or on the edge of road in city streets specifically or urban highways going through a dense area basically might have a curb and gutter.
So of course, city streets will have a curb and gutter to make division in between the pedestrian and the motor vehicles basically. So what is the type of curb and gutter? And there are multiple types. So I'm announcing a lot or going in detail a lot because you will understand the importance of design summary report once you put that once because the roadway project will go for maybe, you know, years while you are constructing. That will be various phases. So this is your core data which you have to save.
That's why I saw curb and gutter will be of different widths as well. Are there any bridges? Depends upon how the alignment is going. So if in case we have any river or any specific location, maybe there is a railroad crossing or something like that, which I will be covering in a few points. But is it a minor bridge? Depends upon span and major bridge or maybe any some different kind of bridges are there. The type of bridge if in case has to be really defined over here is also better.
So how many culvert crossings will be there? That must be mentioned here. Do we have any streams or any river basically? So what is the hydraulic data for that and HGL and that information? Do we have any railroad or any road crossings or do you have to create maybe any interchanges or add grade crossings? If there is a railroad, what all are the possibilities of of crossing that basically? So depends upon the situation there and with the authorities involved for the decision making to expedite the process.
That's why. Are there any intersections? So the minor intersections or major intersections. So it depends upon the category again of the intersecting road when I say a minor and a major. So that speed is defined. So what kind of intersections do we have to design over there? It's a T at skewed or it's staggered. It's cross that way. So right of way, of course, I must have brought this point up before. But again, right of way is a major point of what is my total land width available or right of way where I can build the road and keeping some buffer, of course, if possible for future expansion, for maintenance.
Utilities are a very important aspect, which one must never neglect, because those are the thing on which a lot of revolve around. So it might be water line. It might be sanitary storm, communications data and many more electricity. It might be overhead electric and those all things. So that's there. The type of terrain. So what terrain is there? So it depends upon the slope, the average slope of the project, entire project of the terrain, basically. So it can be classified into a rolling terrain, a flat terrain, a mountainous terrain, a steep terrain depends upon the different standards of different countries.
Moving on to the geometric design elements, the design speed limit. So the design speed depends upon the class of the road where we are defining our project. So 80 kilometers per hour or 50 kilometers per hour for any streets or highways defines our next points like the horizontal curvature, the super elevation rate. So it's all linked together. So that all must be listed in the design summary report in from the vertical curvature of the profile design perspective. So for the SAC curve or the crest curve, HOG or valley or basically HOG, what is the K value minimum, which is as per the design have to be mentioned there.
The longitudinal grade, maximum minimum, a longitudinal grade from the perspective of a design vehicle. When I say a design vehicle, it cannot be the lightweight car or a two wheeler. It has to be a loaded truck, which is going to we are planning that this kind of vehicle will go on this. So a design vehicle will be a loaded heavy truck, which can pass uphill slope, longitudinal slope of what percent. So that's why a maximum grade uphill can go basically a minimum grade from drainage perspective, a storm drainage.
We don't want to stay still the water, which will erode the pavement and many other things. So it must flow off very easily and there must be not be enough friction between the tires and the pavement. So even those things are there in Australia. There are different codes for that and even that is covered in the software aqua planning, typical cross slopes. So, of course, minimum we give two percent, but it can be even less. It can be even more depending upon the situation from the crown of the road towards the edge of the pavement is a typical cross slope.
There can be sidewalks or SUP is a shared use path and shared use path is for the pedestrian as well as for the bicyclist. First, what is the width of that? What is the slope of sidewalk or the SUP? These things on the end condition, there can be ditches for the storm drainage. So what is the front slope? Desirable and maximum. Typically, it is 6 is to 1 to 4 is to 1. In U.S., it can be different. In India, it depends upon the right of availability as well.
So we might have to provide a retaining wall there with metal beam guard fence or something like that. But in an ideal case, imagine we have a full width ROW available where we can see that. So that has to be considered a ditch back slope. So desirable and maximum. So why this thing is important? Because the clear zone width, which I have mentioned below, is a vehicle can surpass. If it mistakenly goes off the highway, it must not collide or roll over basically. So it can still go and stand, like can not roll over on the ditch, but it can stand still on the 6 is to 1 or 4 is to 1 slope.
So that is the clear zone basically. And the slope, front slope or the back slope of the ditch is aligned with the clear zone. So that is also important. So as I mentioned, retaining wall. So when this will come into picture. So when I'm designing with, we don't have a right of. I'm sorry. And the back slope or the front slope goes beyond that. We don't have construction limits, so we might have to put a retaining wall there. Or even in other cases, we want to design retaining walls at other locations somewhere else. So those conditions and criteria as I mentioned.
Vertical clearances at bridges are typically underpass, a road going beneath and where 16 feet, 18 feet or whatever as per the standards has to be provided is there. So moving on to next is the topographical survey. Thank you.