Project Management Basics: Stakeholders and the Project Life Cycle
A free lesson from Skill-Lync's Project Management Using Primavera course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Week 1 Session 1”
What will you learn in this free Project Management Using Primavera lesson?
The instructor defines a project and its characteristics, then distinguishes projects, programs and portfolios using smart cities and L&T as examples. The lesson covers stakeholders, with the Tata Nano plant relocation as a case, and the four life cycle phases with how cost and staffing change across them.
- Definition and characteristics of a project
- Project versus program versus portfolio
- Why identifying stakeholders matters
- Four life cycle phases, cost and staffing
What comes after lesson 1?
The next free lesson is lesson 2, “Process Groups, Knowledge Areas and Why Projects Fail” (41 min). Later in Skill-Lync's Project Management Using Primavera course (paid): lesson 4, Week 1 Session 4; lesson 5, Week 2 Session 1; lesson 6, Week 2 Session 2. The full course has 45 lessons (20 h 0 min of video); see the course overview or its price and syllabus.
Lesson transcript
Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.
Hi, welcome all. Welcome to the first session of the Oracle Pramavera training. Oracle Pramavera is the project planning and management software. So in this training, you're going to learn about the Oracle Pramavera software. You're going to learn why you need a project management software, which is Oracle Pramavera, how you can use Oracle Pramavera solution, what is the market demand of the Oracle Pramavera solution, how you can use and implement Oracle Pramavera in your project. So this will be a 24 hours of training and we have divided this training into 12 session. So this first session, we are going to cover now. So in this first session, we are going to cover the introduction to the project management and the Oracle Pramavera. Why we are introducing a project management here is because Oracle Pramavera is a project planning and management software.
And you should know before going through the Oracle Pramavera, everyone should know about the project management, like, you know, what is the project management? What is the actual meaning of the projects? OK, you know, what is the criteria, you know, to successfully complete the project management? What are the area where, you know, we need to focus in the project management? What are the characteristics of the project management? So we are going to cover everything in this first session. So let's start with the introduction. So what exactly we are going to cover in today's sessions. So the first topic is introduction to project management in which we will see what is the project? What is the project management? What is program and portfolio?
We will discuss about the project stakeholders, which are very, very important in the projects. We will discuss the project lifecycle characteristics also. We will see what is PMO. You might have heard about the PMO in a company. So nowadays, the companies, they have a separate division, which is called as PMO. So what is the PMO and what is the responsibility of this PMO department? What are the project constraints? Why we need a project management? What are the current and the future projects in India? What is the scope of the project management in India? Why project fail and why project succeed?
So we will see all these things, you know, in this session. We will also see the introduction to the Pramavera. We will see what about the Pramavera, the key features of the Pramavera, the key benefits of the Pramavera. We will also see what makes Pramavera get like we will see what the live, you know, example of the some of the, you know, infrastructure project, which use Pramavera as a project planning tool. We will see the requirement of the intensive industry, like how Pramavera will fulfill the requirement in a different industries. We will see about the project, how we can create a project or how the project look like in an Oracle Pramavera.
We will also see the work breakdown structure, the activities, the user logging, how you can log in the Pramavera, the GUI, which is the interface of the P6 Pramavera. Then we will start our training part, which is like, you know, organization breakdown structure. What is the organization breakdown structure? How you can use OBS and how you can add the OBS in the Pramavera, like basically how you can work on the OBS part of the Pramavera. Then next topic that we are going to cover in this session is basically the enterprise project structure, which is also called EPS, the EPS overview, how you can set up a EPS structure, how we can show and hide details in the EPS hierarchy and how we can delete a EPS node.
So this would be the content of this first session that we are going to see. So let's start with our first topic, which is introduction to the project management. Before that, I would like to highlight what will be the learning objectives. So this week we will learn about, as I said, project management, its terminology and the importance of the project management. We will see Pramavera and why it is preferred, and we will also see OBS and the EPS. Let's start about our first topic, which is introduction to the project management.
Now, as an engineer, as a civil engineer, you should know what actually is called as the project. I have seen many engineers who don't know exact definition of the project. When we, you know, heard about a term called project, it comes like, you know, a big building or something like this. But this is not like that. A project basically is a series of activities to be completed in order to achieve a certain outcomes. That means it is basically a list of the activity, okay, which you are going to execute to achieve something which you have defined.
Let's say you are, as a civil engineer, you want to make your own house. So for you, this is a project. Let's say as a, you know, civil engineer, you are working in a company. So they are going to build a dam. For them, this is a project. Okay. Now, there are some characteristics of the, of projects are there, which you need to, you know, learn. The first one is, every project should be a temporary. Now, what is the meaning of the temporary is? That means a project should have fixed start date and fixed finish date.
That means a project should always have a fixed duration. Now, the duration can be anything. Whether it can be 10 days, it can be one month, it can be five months, six months, 10 months, one year, five years, 10 years, 50 years. It can be anything. But every project should have some fixed start date and fixed finish date. Then only we will call as a project. Now, the second point is a project can be either a unique product or a services. That means the project should give you something unique.
Okay. Whether it could be product, it could be services, or it could be a result. For you, let's say, as a civil engineer, the product is a building, okay, which you have defined in your scope, in your work, that, you know, you are going to build a building. Let's say you are going to build a dam. You are going to, you know, make a road or highway. Okay. So, that is the product. Now, services is like something is like, you know, there's existing road and you just want to repair it.
So, this could be a services. Okay. Now, you know, we have a, you know, oil, gas, refinery projects are there. Refineries are there. So, in this refinery, we have a maintenance, you know, projects. So, this is like basically a services. Okay. So, which we are going to maintain our existing machinery. So, you can, you know, maintain the services. The result, the result of something, you know, you, you, let's say there is one project. Okay. There is one, you know, process in your company to get the approval of the design.
Okay. So, now you want to improve the, this, you know, services or this result, the outcome of the, this drawing. Okay. You want to implement some new software in your company so that, you know, the process of approval of, you know, drawing is become fast. So, this is again the services or the result is basically a fast moving process. So, every project can call as a project only when it will give you a unique product, services and the results. Now, when you talk about the infrastructure, so infrastructure projects are, so, infra projects are development work of certain facilities, systems and services, which we have discussed.
A project should have a beginning and the end date. As I said, the project should always be a temporary. Okay. It should have a fixed start date, fixed, finished date. It is a unique set of activity performed to achieve a clear outcome. As I said, it should be a unique. Infra projects have physical presence like software, strategy and the financial project. So, infra project should always have a physical presence. Okay. Then only we will call as an infrastructure project. So, let's say some of the infrastructure projects are, which are roads and bridge, metros and tunnels, hydro power plants, railways, railway projects, steel plants, set up as steel plants, ports and harbors, airports, water effluent plants, refineries, nuclear plants and buildings.
So, these are some of the examples of the infrastructure projects. Now, let's see. There are some other examples of the projects. When you talk about commercial building, so we have office building, the commercial spaces there, hospital infrastructure, that also is a part of the commercial building, commercial infrastructures, multi-unit residents, high-tech facility like data centers, educational institute like school, you know, colleges, universities, government buildings, hospitalities, sports and entertainment, sport complex, stadiums, retail buildings. So, these are some of the examples of the commercial buildings. Now, let's say some of the examples of the industrial projects.
Oil gas, the setup of the oil gas refinery, the petrochemical plants you want to set up, the natural resource like mining, you know, that mine you want to, you know, set up or operate, the industrial manufacturing, any plant, manufacturing plant you want to set up, that is also industrial project. Utility power generation, power generation could be, you know, hydro, thermal, nuclear. So, you want to set up a power generation plant. So, this is a utility industrial project for you. Now, another utility project is waste treatment projects.
So, we have, you know, nowadays we have water treatment plants, waste treatment plant. So, these are the another example of the industrial projects. So, that we have discussed about the infrastructure projects, which has road, bridge, airports, ports, railways, telecom, utility, water infrastructure distribution, transmission distribution. Again, in the utility. You can have electricity distributions also, gas pipeline distributions also. These are some of the examples of the infrastructure projects. So now I hope you understood about the projects. Now let's see about the project management. What is the project management?
Now we have seen what is called as the project, the example of the project. Now we are going to see what is the project management. So project management is the implementation of knowledge, skills, tools, and techniques to the project activities to meet the requirement. That means there are some parameters like, you know, we have knowledge, we have techniques, we have tools, we have skills. So that we need to implement to achieve what we have defined in your projects. So project is basically, as I said, let's say you are going to, you know, have a residential building.
So you want to implement your knowledge, what are the, you know, the material is required, what, how many types of labor resources are required. Okay, so your knowledge about this particular project, your skills to manage these projects that you need to implement. Now tools and techniques. So everyone have their own kind of expertise, they have knowledge, they have skills. Now, what in this course we are going to learn is the tools and the techniques, which you can implement to achieve what you have defined in your project.
Tools are basically a software, like Oracle Primavera is one of the software, one of the software which is used by, you know, 90% of the companies. How you can implement this Oracle Primavera as a tool in the project management and there are some techniques also we will see, which you can implement to achieve what you have defined in your project. Now, we are talking about projects and the project management. Now, there are two another parameters are also there, which is called as program and the portfolio.
Now, what is called as the program? A program is a group of related projects managed in a coordinated way to obtain benefits and control over project is not up to the mark while managing them individually. That means a program is a group of related projects which cannot be managed by individually. Let's say we all know about smart city projects, like India is having hundreds of smart cities, you know, across various regions. So let's say let's talk about, you know, any smart city, let's say Surat, Surat is going to become a smart city.
Now, when you're talking about smart cities, the smart cities will have a different, different project. It will have an infrastructure project, it will have a commercial projects, it will have a drainage project, it will have a rod project, it will have a telecom projects, it will have a commercial building, so there, you know, individual sub projects are also there, so which cannot be managed by individually. So what we do, we manage all these, you know, projects as a program, but there's only terms, one terms and condition, all the projects are related to, are similar in nature, are should be similar in nature, then only we will call it as a program.
I'll give you an example. First, let's talk about portfolio then. A portfolio is a group of project, programs, subsidiary, portfolios, and operations put together and managed to meet these strategic objectives, strategic objectives of a company. So let's say there's one company who's having, you know, objective to provide natural energy, okay, it's like, you know, renewable energy to the, you know, to their stakeholders. So in the natural or, you know, renewable energy, so they can have a solar, you know, projects, they can have a wind projects also, they can have a hydra projects also, right?
So the company, the objective of this company is basically to give the cheap electricity, okay? So in this portfolio, so they are managing a portfolio by managing a solar projects, by managing a wind project, by managing a hydro projects. So I'll give you another example. So we all know about the L&T company. So L&T has a group which have a multiple division. L&T construction is there. L&T power is there. L&T IT is there. L&T infrastructure is there. L&T manufacturing is also there. So they have a particular division, okay?
Now, each division have a similar kind of project. So when you're talking about L&T construction, so all the projects are related to the construction. It's not like in L&T construction division, they are doing something related to the manufacturing, okay? So they are typically, their focus is only on the construction project. Now, when it comes to the L&T power, so their project is all related to the power sector, whether it's thermal, hydro, any power sector. When it comes to the L&T IT, all the projects are related to the IT sectors only, okay?
Now, this group, okay, this business head or business units are called as the program because these groups are having similar kind of the projects, okay? Now, L&T, because L&T is a group of similar or unsimilar program and the portfolio. So L&T is called as the portfolio, okay? So why we are talking about this portfolio is because Oracle Primera is a portfolio management software, okay? It's enterprise project portfolio management software. That means not only project, but we can manage the program and the portfolio through the Oracle Primera as well.
This is the typical structure of the portfolio and the project. So here you can see, so we have a portfolio. Under this portfolio, we can have a sub-portfolio, we can have a projects, we can have a direct projects, and we can have a program as well. Now, this portfolio again can have only programs and the projects. Now, this program can have only projects, okay? So similarly, here we have the program, which again can have a program, which is like sub-program, you can say, and then we can have a project.
And this sub-program also can have some projects. So again, just to repeat, so program is a group of related project, and the portfolio is a group of similar or unsimilar program and the projects. Now, let's talk about the project stakeholders, okay? Now, the project stakeholders are very, very important in the project management, okay? What are the project stakeholders? Let's see first. Project stakeholders may either be individual or the organizations. Project stakeholders are ones who may influence or may be influenced by your project. Just think that they might be influenced by the outcome of the project.
So some of the stakeholder examples are sponsor, who are going to, you know, give you money to execute this project, your sponsor, your customer, who are going to use your product, a seller, who are going to sell your product. It's like making some product, you are, you know, selling to resellers, and again, they will sell to the end users. The organizations group who are involved in your projects, the business partners who are, again, involved in your project, functional manager, like, you know, design department head, procurement department head, HR department head, finance department head.
So they are called as the functional managers. The other stakeholder and the suppliers. Now, project stakeholders are basically who are involved in your project directly or indirectly, okay? I'll give you a live example of the project stakeholder. You know, we all know about the Tata Nano. You know, when they launched the Tata Nano plant, it's supposed to be set up in the West Bengal. Everything was done. Like the project management study has been done. Everything was planned. And now they are going to set up a nano plant in the West Bengal somewhere, you know, near to Calcutta.
Now, once they started the construction, you know, they find some difficulty and they have to shift this project, this manufacturing plant from West Bengal, which is like, you know, a stream east to the Gujarat, which is a stream west. So what happened, you know, why, you know, after even the detailed study project management plan, they have to shift, you know, the plant from, you know, West Bengal to the Gujarat. Because while preparing a project management plan, there is that what we need to do, we need to study about the project stakeholder.
And they miss one stakeholders, which are the local, you know, community, you know, near the plants. Okay. So near that community raise up, they went on strike or something, you know, politically happens. And, you know, the company, the Tata Group has to shift their plant from West Bengal to the Gujarat. So there was a study like why it happens because it involved, you know, study the DPR or the project reports involved a lot of time and involved lots of cost also. So there was a study that, you know, they missed one stakeholder.
So stakeholders are very, very important whenever you launch a residential project. Okay. So let's say I'm in Delhi, you know, and Delhi, I can launch DILA, which can worth of, you know, four to five CR. But when you're talking about a small city, I cannot launch a project because I know my stakeholders, my customer are not going to pay in a small city. Okay. Similarly, you know, whenever we are launching commercial project, we study about, you know, location, the customer around this project. So we study about the stakeholders, then only we launch a project.
So stakeholders study are very, very important. And for the study of the stakeholders, we should know about the project stakeholders. We need to prepare a list of the stakeholders. We need to prepare a list of stakeholders. We need to prepare a list of stakeholders. Who are going to involve directly or indirectly in our stakeholders. When you're talking about launching a car, a company, you know, did survey, you know, they do survey like, you know, who are going, who can purchase our car. Like Maruti in India, why they are successful? Because they know about the Indian customer, like most of the Indian customer are at, you know, they're from the middle class.
And they, every time they launch a car who can afford, like, you know, only middle class can afford this car. So that's what, you know, in numbers of cars, the Maruti is on number one. So similarly, like, you know, the DLF, like, you know, like, especially North, they are number one construction company because they know about the customer, that customer expectation. So they study about this stakeholder, you know, very well. And that's what, you know, their project is always, you know, successful. So stakeholder studies are very, very important while, you know, preparing for a project.
There is some of the characteristic of the project life cycle. So there is a term called project life cycle. So project life cycle is something is like, you know, every project has to go through a cycle or through of some phases. OK, so there are some characteristic of this project life cycle. So what are these characteristics are? The first is cost and staffing level. That means we know that staffing level is means our resources. OK, your labor, your site engineers, your contractor, your vendor, your designer, your, you know, operators.
So these are the like, you know, your resources and the cost. So we all know while executing a project, we need resources and the cost as well. So how this costing and staffing or resources are going to impact your project through the life cycle. So that we are going to see and then we will see about risk and uncertainty. Every project will have risk. If someone is saying that, you know, my project is not having a risk, that means he is doing some mistake. The only thing, the only way of, you know, you know, big successful manager or execute a successful project is managing a risk.
OK, so how you can mitigate all these risks that we need to plan. So this is called as risk management, OK, that we will see. So risk and uncertainty, how and the stakeholder, how these three factors are going to affect through this project life cycle and the cost of changes. The cost of changes means so this, you know, let's say you are from the contractor side. OK, your client is asked for, you know, making a residential building and everything was planned and everything, you know, was agreed on a terms on all paper.
You started execution. Now, mid of the project, your client is saying, I need a swimming pool as well, because it's in demand, which was not planned or which was not scoped in the starting of the project. So it's like, you know, mid of the project, your client is asking that I need a swimming pool and you have to build it. OK, so now what you can say is basically you can say this, you know, you need to change a scope for to change a scope. There's a cost. So cost of changes, how it will impact or how it will, you know, move in the project life cycle so that we are going to see.
So this is the project life cycle. So first, let's see about the project life cycle. So on an x-axis, you will see there's a time. OK, so we have a project time and on a y-axis, we have all these parameters or factors that we have seen. So let's start one by one. Now, these are the project life cycle. So mainly we have four phases of the project in the project life cycle. The first phase is the starting of the project. That means in this stage, you are deciding that you are going to execute a project.
And once you decide and once you plan that you are going to, you know, start a project, you will have a document which is called as project charter. The project charter might be new for some of the, you know, candidates because it is not, you know, very popular terminology, especially in India. So normally like we have a kickoff document, requirement gathering document, business requirement gathering documents, project documents. So this is like the, you know, one document which will have all the information about your project. That document in this, you know, terminology is called as the project charter.
So project charter is nothing but a formal document which will have all the information about the project and the team who are going to involve, the project manager who is going to manage this project, his authority, his responsibility, his power. However, everything is mentioned in this project charter. So project charter is nothing but a document that, you know, we usually say that project document or tender document or something like, you know, in a different, different industry. Once we complete this first stage, we will have a project charter.
That means we will have an official document, you know, which state that we are going to start a project. Now, once the first stage is complete, we will have a second stage, which is called as organizing and preparing a plan. That means now you have a power, you are a project manager, you are authorized to execute this project. Now you start preparing a plan, how you are going to execute, what will be your scope, who will be your contractor, who will be your vendor, who's your team, how much time will you require, how much cost will you require, what is your budget, who's your stakeholders, you know, everything you will plan in this preparing stage.
So after you plan everything, you will have this project management plan, which is another document, which you will have each and every information, small, small information about your project. Okay, so as I said, like, you know, total time, total cost, total resources, vendor, every raw material, every information about your and when you require a material, when you require a cost, when your resources are going to work. So everything will be covered in this project management plan. So it's basically a detailed plan about your project. Now, once your plan is ready, you will start execution.
Okay, so this complete part from starting to this, this part is your execution part. Okay, now in the execution, which is called as carrying out the work, you execute the work, whatever you have planned, you start executing at your site. Now, once this stage is completed, the client will accept your deliverables. Like, you know, you are going to build a residential project or roads or, you know, any refinery. So your client will accept your deliverables. Now, the fourth and last is closing a project where lots of documentations are involved.
Like, you know, there are so many vendors, are there contractors are there, you need to close all these accounts, you need to submit, you know, handover documents. So this, you know, phase is more related to the documents, like closing all these documents. Now, let's talk about how this cost and staffing level impact your, you know, this project life cycle. So if you see, so this is the graph for the, your costing and the staffing level. So at the starting, the first phase, you start at zero level.
Okay, so in the starting, it's increased slowly. So at this point, you require very less cost and resources in your project. While in the planning, again, it will increase because in the planning, you need to involve so many, you know, functional managers. Let's say you are preparing a project. So you need to involve a design team. You need to involve a procurement team. You know, you need to involve your vendor. You need to involve your finance team. So who's going to like all the stakeholder you need to involve because you need to get there all the information about your stakeholder.
So cost and the staffing are increasing again in this preparing plan. Now, suddenly, when you start the execution, it will exponentially increase the requirement of the cost and staffing. Because at this point, if you see from this to this point, okay, you need the procurement processes involved. You know, where you need to procure the raw material. Okay. You need to mobilize your resources. So that process will have a major portion of your cost and the staffing. Okay. Now, once you reach at some level, it will again require some resources because you have already deployed all your resources, whether it's labor or a site engineer or operator.
And at some point, okay, you know, your cost and staffing levels start decreasing. Because when we consider any, you know, three stages of a project, it could be any infrastructure project. So there is a superstructure part and the finishing work. So we all know in the structure work, we need lots of resources, lots of raw material. But in the finishing part, we need a less number of resources and the material is already procured. So that's what, you know, in the finishing part, we requirement of the cost and resources start decreasing.
And when you've accepted, when you reach this stage, the deliverables are accepted, your cost and staffing level start drastically decreasing. Because at this point, you will release all your resources. You will, you don't require any cost because it's, as we discussed, this phase is typically about the documentation. So the cost and staffing level start decreasing in the fourth stage of this plan. Okay. So just to, you know, summarize what we have done, what we have learned till now, we have seen what is the project. We have seen about the project management.
We also have seen a different, different types of projects. We have seen a project stakeholders. We have seen what is program and what is portfolio. And we have seen a project lifecycle characteristic. And how costing and staffing level influence your project life cycle.