Steel Bridge Basics: Material, Span Selection, Loads and Combinations

A free lesson from Skill-Lync's Design of Steel Superstructure in Bridges course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Week 2 Session 1”

What will you learn in this free Design of Steel Superstructure in Bridges lesson?

Opens week two with an overview of steel bridges, structural steel properties and conceptual design, including fixing the span and choosing the bridge type. Reviews permanent and variable loads, load combinations, steel's costs and skilled-labor needs, and seismic loads with a vertical component under IRC 6.

  • Advantages and disadvantages of steel girder bridges
  • Structural steel properties that govern design
  • Permanent and variable loads on bridges
  • Load combinations and vertical seismic load under IRC 6

What comes after lesson 3?

Later in Skill-Lync's Design of Steel Superstructure in Bridges course (paid): lesson 4, Week 2 Session 2; lesson 5, Week 3 Session 1; lesson 6, Week 3 Session 2. The full course has 44 lessons (15 h 38 min of video); see the course overview or its price and syllabus.

Lesson transcript

Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.

Welcome to the second week of Design of Steel Superstructure Bridges. In this week, we'll be looking into Introduction of Steel Bridges, as we have looked into the last week, and also a short review of the loads, which you would have earlier looked into other courses that I would have studied. In the previous session, we have covered about Introduction to the Bridges, then Components of the Bridges, and also Types of Bridges. We have also looked into various types of Bridges, how they are classified, based on materials, and also how they behave, etc.

Coming to the Table of Contents for this week, we are going to look into the General or Brief Introduction into Steel Bridges. Then we'll look into the Material Properties of the Steel, which we have Structural Steel, and look into various properties which govern our design. And also, we'll be looking into Fixing of the Bridge Span. It's a Conceptual Design Exercise, where we'll be looking into how and why speed spans should be located, and how they should be aligned, etc. Then, after fixing the span, the next step in Conceptual Design, generally, is the Geometric Selection.

You have a span, an alignment of the highway, but you don't know what kind of bridge you are going to construct over that. It could be a steel truss bridge, it could be a steel composite bridge, or a simple steel girder bridge, it could be a cable straight bridge, or a suspension cable bridge, etc. So, what kind of bridge is located for a particular location, we'll be looking in over here. And the next one is Loading on Bridges. So, what are the types of loads that are acting on the bridge?

It could be Permanent Load, it could be Variable Loads, and how they behave, and how they interact with the structure, etc. That we'll be looking in this session. And the last one for the week is the Load Combinations. So, generally, we know that there are various loads on the bridge. Like, we have Permanent Loads, we have various wind loads, or other variable loads, such as Live Load of the Vehicles, Live Load of the Pedestrians, etc. But, how they interact with each other. Sometimes they act together, sometimes they do not act together.

And what can be acted together, and what are the factors we generally, and where we have to look into for the factors. Those things we'll be looking in this part. Coming to Learning Objectives. In this session, what you'll learn, we'll look here. The first one is the General Introduction to Steel Bridges. And as we have discussed earlier on the Table of Contents, it will be the Material Parameters for the Structural Elements of the Bridge. And the third one is the Fixing of the Bridge Span. As we have discussed earlier, Geometric Selection of the Bridges, and various Loads acting on the Bridges, and also Load Combinations considered on the Bridges.

So, coming to Steel Bridges. Steel Bridges are preferred in areas where pre-casting is preferred over on-site construction. This does not necessarily mean that we cannot do on-site construction of steel girder bridges, or steel bridges, any type of steel bridges. But, the advantage of steel bridges is they are light. So, you can directly build it in some other location. You can directly take it to the site and just erect it and keep it over there. So, in locations where it can be directly kept over, or we can make the parts of the bridges and assemble it in a particular area.

So, that's where the steel bridges are preferred. In recent times, countries are moving so advanced that even certain bridges are made, for instance, bridges in Sweden, for example. They are designed in some other country, made in China, and are being assembled over there. Or, even with the rest of the other countries, where the manpower is so low, they fabricate the entire bridges in some other location, and are shipped to the corresponding locations, where they can be placed directly near the harbor, or some other locations. And, similarly, even in our country, like India, we can see that the bridges are made in one location, that is the casting yard, or the fabrication yard.

So, where the bridges, different parts are brought in there, they are welded together, they are bolted together, and the particular segment is taken to the site, and it's connected with an existing segment, or it can be directly placed over the substructure. Those kind is also very much preferable, but are still good or bridges. Other advantages that we prefer steel bridges over the concrete bridges is, they're easy to repair and replace on the end of their life. If the bridge is damaged, the material is still very valuable, unlike a concrete bridge.

The material completely degrades in case of a collapse, or a complete retrofitting as required. In that case, the wasted material is somewhat used for things like landfilling, or things like that. But in case of steel, it can be completely reused. They can be recycled, and can be completely even used in reconstruction of the bridge. And certain parts, you can use it again, and again if it is not damaged. And even parts of the bridges, where the maintenance or retrofitting is required, you can specifically remove that element of the bridge, and you can add it.

In certain bridges, where the capacity is low, if it is a concrete bridge, it would be very tedious work to retrofit it. Compared to a concrete girder bridge, you might need FRP and other advanced techniques to retrofit the bridge for a higher load. In case of a steel girder bridge, in case you want to increase the capacity of the steel girder, you can directly add a flange plate, that is a bottom upper flange. You can add one more flange, so that the capacity in bending increases.

So that is performed in quite a lot of places where retrofitting of existing structures is required. And other advantage is that they provide a very high strength to the mass ratio. For instance, if you are looking for concrete, the density is almost 24 kN per meter cube, generally. While the strength can go up to 40, 50, the maximum is 40 and 50 megapascals. While in extreme cases, there are ultra-high performance concretes and things like that, where the concrete strength can go up to 70 and 80.

But still, it is nowhere comparable near steel, where the strength is more than 350 megapascals. While its density is only 77 kN per meter cube. So in this case, you can see the ratio, where the strength is almost around 40, and the density is around 24. The ratio gives a lower number, while here, the strength is around 350 or 450, while your density is only 77. You get a far higher ratio of strength to mass compared to that of a concrete. The next thing, the disadvantage we can see about bridge is that they are very tedious to detail, and they require more intensive calculations than their reinforced concrete counterparts in quite a few cases.

It's not in all cases, especially in cases where class 4 buckling sections are involved. It is, calculations are pretty complicated compared to that of a normal reinforced concrete section. And other disadvantage, which is not mentioned here, is the cost. Steel is generally far more expensive compared to that of concrete. So, optimizing steel is very much required. Even though the cost is too high, compared to the amount of material used, it can be justified if it is properly designed. The next thing about steel girder bridges is that they require more skilled labor than a RC girder bridge.

For instance, in case of a reinforced concrete girder design, you need just a formwork, and you can directly pour it. And the laborers at the site need not be familiar with what is happening inside it. They just have to mix particular quantity of fine aggregates, coarse aggregates, and semence. It's pretty simple, as simple as that. And even reading the drawings is pretty easy compared to that of steel, because you can see the number of reinforcements, and you can easily understand that. While in case of a steel girder bridge, you have to be very careful.

You need to be able to visualize how the connections are performed, and how it does not interfere with your working conditions, and or in case of movement of traffic, things like that. And also, it requires a lot of welding, and also connections are pretty complicated in case of bolted connections. Even though inside execution of bolted connections is pretty easier, but in pre-casting art, they have to be pretty careful that bolts and the holes pretty much align, where the connected element and also the element to be connected, they align perfectly in shape so that they can be recreated in site.

Steel girder also provides advantage in cost of substructure due to reduced weight of the superstructure, as the relative weight of steel superstructure is lighter than the concrete counterpart. As we have discussed earlier, this is where the advantage of design comes in. Design it perfectly in a good play. You can find it that you can reduce the cost of the bridge by designing it properly. You can reduce it with the cost of substructure. In certain cases, you can reduce even the cost of superstructure for a particular span.

So that's how steel becomes cheaper than reinforced concrete. It is always due to design. The other important thing to be considered here is, even though the steel is costlier than concrete, strength to mass ratio is pretty high in steel. So the ratio of cost and the ratio of mass needs to be considered pretty much. And other weaker thing is that the steel is weak and buckling. Even though the steel has very high tensile or compresses just compared to that of concrete, the sections are pretty slender.

And this adds the problem of geometric non-linearity where they tend to buckle. So there are various types of buckling that comes in the design of steel girded bridges. There is lateral torsional buckling, then architect buckling, portal buckling, then you have normal axial buckling. So various kinds of bucklings need to be checked so that the steel girded bridge does not buckle under its own weight. So buckling, in addition to the compression, also adds bending moments in the structure. When these bending moments get significantly high enough, they can cause failure to the structure.

So even though they have a very high strength to mass ratio compared to that of concrete, in this part it becomes weaker. So they need to be restrained properly so that we are not using such a high amount of steel so that it is lesser optimized than that of the RC girded. Coming to material parameters, concrete has a compressive strength of 20 to 60 megapascal. You are going to have a smaller portion of Jeff want to increase so that the standard today, We both of our ребенка 3 available You can enter Independnie Thank you.

Really used in bridges. While its tensile strength is lower than one-tenth of its count resistance, its density is almost 25 kN per meter cube, as we have discussed earlier. The reinforcement used in concrete generally lies in the range of 415 MPa to 500 MPa. In case of structural steam, the ultimate strength varies from 360 MPa to 570 MPa, and yield strength lies between 250 MPa to 460 MPa. You can see that even the yield strength of steel is so high, it is almost 10 times that of normally used concrete.

Well, you can see the density of the steel, as I mentioned, is 77 kN per meter cube. And as we have discussed earlier, even though the compressive strength or tensile strength of steel is far higher than that of concrete, it does not completely get utilized because of geometric instability or buckling. Now, coming to bolts, that are the connections, the connections of the bolts, their capacity can vary from 240 to 900 MPa, while the ultimate strength varies from 400 MPa to 1,000 MPa. Most of the connections need not lie within even the elastic range.

In certain cases, it's pretty much permissible to reach point higher than the elastic range. So, in that case, you can see the concrete bolts, which we are using, has far higher capacity and requires lesser detailing compared to that of a concrete, even an RC girder. Then, coming to the, as we have discussed earlier, the cables used in pre-stressing cables or those used in cable-stay bridges or suspension cables, they are generally of a higher grade, which is called high-performance steel. And their tension capacity lies between 1,300 MPa to 2,000 MPa.

Even though they have very high tensile capacity, they do not have any compression capacity. They are similar to that of a rope. They are basically, in software modeling, they can be called as tension numbers. They do not have any capacity to take compression and can easily buckle or bend. In the upcoming part, we'll be seeing about fixing the bridge span. So, you have a valley or interchange. But, we have to be very curious about where the bridge is being placed so that the cost to the client is less.

No client is going to build a bridge at a particular location if it is not optimized. And that's what we designers are supposed to do. We have to find the ideal solution where we can save money for our clients. And also, by saving the money, we are also saving the environment because we are using lesser materials that emit a lot of CO2 or carbon dioxide into the atmosphere. So, coming to fixing of the bridge span. So, the purpose of the bridge is the governing factor for alignment of the highway, roadway, or footpath, that of the bridge.

So, first, we have to look into the point where the bridge is connecting. So, from city A to city B. So, we have a river in between. So, the bridge needs to lie in a particular location where it lies in the linear part, where you don't have to move the highway to a very long extent so that you increase the cost of the highway. So, you have to make sure it lies in the highway alignment or the railway alignment so that you don't have to take it some other part where it is not required so that you will be spending more on building the highway to a particular point where the bridge is located.

So, for instance, you can say that you are putting a straight line. Point A to point B is connected linearly in a straight line. But the width of the canal or the valley which is lying in between is shorter in some other location. So, you cannot directly fix your bridge over that and ask the road people to take the roads over that location. Because coming to that location might cost you more with the road than building a bridge over in the valley where the span is higher.

The next thing is part of the waterway or other traffic under the bridge also governs the initial setting and clearance of the bridge. So, you can say that if the waterway has a ship or something else passing underneath, you have to make a required height accordingly. And also the traffic similarly. If you have a railway line passing under it, the railway line has certain clearances. This is the minimum required height. This is the minimum width between two tracks. And you have to leave further length from the track so that the edges of the train doesn't come in contact with the substructure of your bridge.

So, you have to be wary of those things so that the bridge can be placed in that location. Then the other thing. So, after deciding these two things, then we come to the next point. We get to optimize. That is, cost of the superstructure is one of the most important deciding factor. So, this is where we decide what kind of bridge needs to be placed at what location, what material has to be used for this particular span. So, this is where the structural engineer plays. This is where he finds this optimal solution.

The next one is fixing the bridge span. The other thing that also decides the fixing of the bridge span is the environment of the location of the bridge also governs the type of the bridge. For instance, certain bridges could be located in such a way, you might have some obstacles on the opposite side. So, if you are looking from the elevation of the bridge, you have to look into the opposite side. You cannot place multiple number of substructures in the path or in the span. So, in that case, you would have to increase the span of the individual girders or the superstructure.

So, that also decides the fixing span of the bridge. And in certain cases, as we have discussed earlier, if there is a shipping pathway underneath, then we have to increase the width so that the ship does not impact with the substructure of a bridge. And in certain cases, the bridge lies in a particular location. It's the work of the architects, basically. The place has a particular characteristic where you can see that there are particular olden buildings available nearby. And also certain old era things like a church or things like that, that are lying in this already existing in the location.

And you cannot prefer something that is of a modern type over there, like a millennium bridge, as we have seen in the previous session. So, something that is ultra-futuristic. So, the things doesn't exactly coincide at the location. So, those also needs to be taken care of. And here you can see some other examples as well. For instance, if it's a corrosive environment, then you always prefer concrete bridge over steel. And in certain cases, the poor soil also affects our bridge. So, if you have a very weak strata under your bridge, you don't go for multiple substructures.

Or you tend to reduce the superstructure loads. Or in case you cannot control that, then if you have to directly rest your foundation on the rocks, for instance. The rocks might be pretty deep. It might be 20 meter or 30 meter below your soil strata. So, in that case, there are multiple piles coming in over there. So, or even well foundations coming in over there. So, for these well foundations, if you provide multiple locations where this well foundation has to be laid, it might ultimately increase the cost of your bridge.

So, in this case, we have to look for an ideal span, but the cost of the substructure does not increase the cost of your superstructure. So, for the things shown as an example, a roadway below our metro network requires less than number of obstructions by peers on existing roads. So, for instance, if you have a four-lane highway, and you want to put a metro above it, or elevated highway above it. So, in that case, you cannot place your peers in such a way that it obstructs the traffic below.

So, because our purpose is to decongest the roads. So, if we build such huge peers that we are going to congest the roads below us, the purpose of the bridge is not achieved. So, we have to look into that, the bridges somewhat. Even though we are spending more cost on the bridge, we will be looking into the purpose over here. Another thing is the aesthetics. Aesthetics also governs the type of structure. Like, for instance, these are some of the very well-known bridges, like Brooklyn Bridge, Tower Bridge, as we know it's the London Bridge.

And then we have Sydney Harbour Bridge, then Millennium Bridge. There are quite a lot of other bridges which signify the importance of a location. They form a landmark. They are also done for tourist-visitor attraction purposes. So, these bridges, we don't look to optimize these bridges, but they are made in such a way it's flashy and it attracts more people. So, finally, here we can see how a bridge is made. You can see that purpose also governs, cost also governs, and also aesthetics and surrounding conditions. When everything is taken care of, we make a perfect bridge.

That's how bridges are placed. In the next part, we are going into the geometric selection. Geometric selection is you have a bridge already in a particular alignment. So, now we have to place what kind of superstructure that we are going to put in over here. And what will be the width and what will be the thickness of the superstructure, et cetera. And even the depth, which is one of the most important governing criteria because the depth is almost as, extends as long as your span as well.

Coming to geometric selection. Selection of the geometry and the material used for design is the first step in designing a bridge. Fixing span not only depends on a structural engineer, but is an interdisciplinary work, as we have discussed earlier. So, it could be a highway engineer, a p-way engineer, who could give us ideas about how bad we can place our peers. In certain cases, hydraulic engineers decide on the clearances based on the flood levels. So, we cannot place, even though we have certain bridges at particular heights, we cannot keep it at any height.

So, in certain cases, the floods could be too high that it can wash away our superstructures. So, we have to make our superstructures so high that when the river water swells, it does not affect our superstructure. As we have discussed earlier, architects also play a part in case of bridges in significant locations, acting as a landmark. So, here you can see a particular type of bridge is more cost-friendly over the particular range of span of the bridges. So, this has been researched upon and has been verified by quite a lot of people.

And even though this has been pretty much verified, we can also do our, if we have a good reason to believe that this is not true, that it is going to increase the cost of the substructure. Some iterations are made before the design so that we kind of preliminary sizes and we can decide upon the cost. So, that performance is called conceptual design or preliminary design. That is also performed for winning the tender or bidding stages because multiple consultants and companies will be bidding for a particular project.

In that case, we have to make sure that ours is cheapest to get. The project. So in that case, we do a lot of iterations to find out how we can get into the cheapest solution. You can see over here what kind of bridges are preferred, especially in steel bridges I mentioned over here. So we can see I-Girda's, the span ranges from 20 meters to 40 meters, a simply supported bridge. I-Girda is generally preferred. For continuous bridge, it's around 30 to 60 meters. You might ask why an I-Girda is for simply supported of shorter span, while a continuous span bridges of a longer span.

Because in steel, it's about ultimate bending moment. The sign does not matter over here. So when you have a continuous span, the bending moment is distributed as hogging moments in the subcourt and sagging moments in the mid-span. While when you're going for only simply supported beams, there is no hogging moment. Because of this reason, you'll be having excessive sagging moments for the particular same span. For instance, if you have a bridge of a span 40 meters and in simply supported or two spans of 40 meters, you might have a magnitude of bending moment that will be lower than that of a simply supported bending moment.

It can be positive or negative. I mean hogging or sagging. In steel, what's the moment you're getting with sagging moments for a simply supported will be higher than what you'll be getting for a continuous bridge. It could be at the hogging support or at the sagging support, but still the magnitude will be less than that of what we are getting in the simply supported beam. And the same applies for the rest of the other type of bridges as well. You can see in a box girder.

We generally go for a span of around 50 to 70 meters over here. And here we can see it's around 50 to 100 meters. We are going up to 30 meters more in case of a box girder. Then coming to truss girders, you can see it's around 75 to 100 in a simply supported beam. While it is 75 to 449 meters, people go up to 500 meters in case of steel truss bridges. We have discussed about eye girders, box girders, and truss girders. In case of a cable state bridges or a suspension cable bridges, again, it's a mix of cables with this particular kind of eye box or truss bridges.

So in cable state bridges and suspension bridges, the aerodynamic shape of the bridge also plays a very important role. It has to be streamlined. And it has to have a very good torsional rigidity to avoid the effects of wind, aerodynamic effects of wind. So in this case, eye girders is least preferred when it is provided in a cable state bridge or a suspension bridge. While a box girder is more preferred because box girder has a better torsional rigidity. While a truss bridge also does not have such a high torsional rigidity, if it is designed in a three-dimensional way where we are providing trusses in a lateral direction as well.

In that, a truss bridge can also be very effective against the aerodynamic effects of wind. Then it is provided as a combination for cable state bridge or a suspension bridge. Then we also have bowstring arch bridges. Then we have bowstring arches need not be completely made of steel as we have discussed in the previous session. They can be made of a combination of concrete and steel because concrete is generally better to provide against compression, while steel is better to be provided against tension. So quite a few designers prefer bowstring arches where the arch part is of concrete, the tension beam or the main beam is of steel, then the cross beam could be of steel, but can also be made into concrete.

And then we have concrete deck. And finally, we have the cable state bridge. As we have discussed earlier, cable state bridges are provided for a span of 60 meter to 1,104 meter span. For a shorter span of cable state bridges, you can follow the codes and you can directly design them. When it goes to a longer span, most of the codes are not specific. You have to perform wind tunnel testing and also computation fluid determines its failure. So direct wind loads that are given in the code does not apply to a bridge of, say, a span of 200 meters.

Then we are coming to suspension bridges. Suspension bridges are the bridges with the longest load carrying capacity. And these bridges can take loads from around 100 meters to 1,991 meters, which is the longest one. It's Akashi Kaikyo Bridge in Japan. Suspension bridge has the longest cable load carrying capacity because it resembles the shape of a rope that is tied across a span. So naturally, the shape of this rope is in a parabolic shape. And the same shape is for a uniformly distributed loading. So the same shape is used for a suspension bridge, which is a nature-induced design.

So the shape, we are getting it from the nature of the cable or anything that is resting over the span. So they have naturally the longest span aspect, which we generally do. This chapter, we are moving into loads. Loads can be basically classified into two. One is permanent load. And the other one is the wind load. Permanent load is generally the self-weight of the structure. The self-weight of the structure is time-dependent in few type of bridges. In some type of bridges, it can be tricky observing which element takes the load.

For instance, in steel composite bridge, the weight of the concrete deck is taken by only the steel girders. Weight of the concrete deck is taken only by the steel girders. While the weight of the live load, that is taken by both steel girders and also the concrete deck. And with respect to creep, over the period of time, initially, even though the entire weight of the concrete is taken by the steel girders, over the period of time, as the creep induces, certain part of the load is redistributed, and certain amount of self-weight of the concrete deck is also taken by the concrete deck due to the creep strain.

So, in certain type of bridges, we can also note that the type of construction, for instance, in certain bridges, we have the launching in place. In that case, the self-weight of the structure behaves differently. The self-weight is taken by the cantilever action in the initial stage, while in the long term, it is taken by the beam action, a simply supported or a cantilever beam action. So, that's what we mean by self-weight of the bridge is time-dependent. It could be varying with respect to the time. And also, various elements of the bridge can also change over time.

So, they also need to be considered in the future when they are retrofitted or designed. So, coming to the last point, the self-weight of the ancillary element, including crash barriers, lighting, and other cables and services passing through the bridge from the VN code. These also come into the self-weight part of the bridge. And coming to variable loads, longitudinal forces, braking and acceleration is part of the longitudinal forces. So, longitudinal forces considered in design is taken as 20% of the loads in first lane, plus 10% of the loads in the second lane, and 5% in rest of the lanes.

This is according to Indian Road Congress. So, generally, longitudinal force is taken as a part of the vertical load. For instance, if we have 100 kN in the first lane, then the 20 kN is the longitudinal force. That is the braking force. That is assumed in the first lane. So, for the 100 kN, we will be putting 20 kN as longitudinal force. For the first lane, assume that the second lane has, again, the load of 100 kN. For the second lane, we will be taking 10 kN only in that case.

And for the rest of the lane, that could be 3, 4, 5 with the same 100 kN. Then in those lanes, we will be taking only 5% of the loads in that particular lane. So, it is pretty important which lane you are designing and the longitudinal forces of which lane is taken. Because for a particular lane, the steel girder or steel truss might be lying closer to one particular lane. When you add axial force in that particular lane, that would add axial force in that particular structural element.

That's the steel girder or the steel truss. So, when the axial force adds in that, you will have a combined effect of bending due to the vertical loads and axial force due to the braking or longitudinal forces. So, when they interact, your design is, that is the governing condition of your design. So, you have to be very careful which lane you are taking the vertical load and which lane you are considering the maximum horizontal forces. Coming back to centrifugal forces, this is given from IRC 6, Chapter 2 and 2.

So, centrifugal force is a function of the vertical load in the particular lane and also the velocity of the vehicle and also the radius of the bridge. So, this acts outwards. That is, if you have a circular bridge, so this acts outwards towards the outside direction of the bridge. So, here you can see that it is given by WV square by 127 times the radius of the bridge. So, temperature loads, this is given from, again, Indian Road Congress Code, Chapter 6, Chapter 215. Temperature load occur in two ways.

Change in overall bridge temperature due to seasonal variation of temperature and temperature variation in various surfaces due to shaded and exposed friction. So, here you can see, it can be explained in two ways. For instance, you can say, you have a temperature in summer, you have a temperature in winter. So, your summer temperature is around 40 or 50 degrees Celsius, while the winter temperature could be around even minus 25 or minus 30 degrees Celsius. That would be the minimum. While your bridge could be constructed somewhere when your temperature was very optimum, around 20 degrees Celsius.

So, it was constructed at 20 degrees Celsius. And, when it reaches the peak summertime, you have a temperature variation of positive 20 degrees Celsius. That would expand the bridge. So, that also needs to be considered. In case of an integral bridge, this would give rise to a compressive stress. And, even though if the bridge is not integral and we have a free bearing, even in that case, the supports are not always completely released. So, they are not, even though we assume that it is allowed to move freely, there is a particular rest chain in the longitudinal direction of the bridge.

So, for that purpose, what happens is, there is a particular friction that is generated by the support. And, that generates a compressive force. So, this is called bearing friction. And, in winter, for instance, even though the bridge was constructed at 20 degrees Celsius, and the minimum temperature is minus 20 degrees Celsius. So, we'll have a temperature range of 40 degrees Celsius that the bridge contracts. So, the bridge has to be designed for that as well. So, in case of integral bridges, again, there could be a particular tension as well.

Because, you have the phone. And the frame, and they are contracting. So the foundation, if it does not allow you to rotate, in that case, there will be a significant tension in your structure. And in case of free bearings, as we have mentioned earlier, due to bearing friction, we might have a significant amount of tension in the bridge as well. The next part, we are coming to secondary stresses. Secondary stresses are the stresses that is caused due to the eccentricity of connections or moment of support.

So it's assumed that you have a bridge of I-section. So generally, when we calculate bending moments, when we check for stresses, including shear and bending and torsion, we assume that the vertical load is placed exactly at the center of the flange. So the bending moment is calculated longitudinally, and also shear forces is also calculated. Based on this, we design our section. But we generally tend to ignore the torsion part that happens. So in case, if a load is placed a bit away from here, exactly at the center of the web, instead, it's on top of the flange, it's placed at a 50 millimeter eccentricity.

So you'll have a moment that does the load into 50 millimeter. That is the moment you will be getting. And for that moment, you have to design the connection between your flanges and your web. And also for that torsion, you would have to design your entire bridge. In case of it is not designed, it can cause significant additional stresses, and the capacity of a bridge will be far lower than what you have assumed it to be. Then coming to seismic load, for the purpose of evaluating seismic load, impact, the country is classified into four seismic zones.

So zone 2345, so zone 1 is generally not used anywhere, which is there is no seismic activity. Currently, every part of India is classified into a seismic zone, and it has to be designed for the particular seismic load. And generally, horizontal and lateral components govern the design of the substructure. But in case of the bridge, a design of bridge cantilever parts, the deck and other elements sensitive to the changes, such as pre-stress depth, vertical component of the seismic load is also considered for design. So generally, even though when a seismic load is considered, the horizontal acceleration is considered at a particular height.

So that's what we generally calculate for a building. Even for most of the bridges, that's what we do for the substructure. We'll be calculating what is the mass of the superstructure, and we'll be calculating equivalent horizontal acceleration. And with that particular mass, we'll be getting what is the horizontal force due to seismic loads. But in case of a pre-stress bridge, where it has tensions and compressions are pretty sensitive, we have to be very careful what is the vertical load that is also adding up due to the effect of seismic load.

And the same happens with the cantilever parts of the deck or anything that is pretty sensitive to vertical bending. So the vertical component of the seismic loads also need to be taken in these cases. So there is a combination of vertical and horizontal loads as given in IRC6 chapter 219.14. So this also needs to be considered.

Want the rest of Design of Steel Superstructure in Bridges?

Get the full course syllabus and fees.

The full course is paid (₹40,000). We'll send the syllabus and call you back within one working day.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Full course · paid

Unlock the full Design of Steel Superstructure in Bridges course

The remaining 41 lessons, mentor-reviewed projects and a certificate come with the paid course (₹40,000). Leave your details: we'll send the syllabus and fees and call you back.

Get the syllabus and fees

A counsellor calls you back within one working day.

By submitting you agree to our Terms and Privacy Policy.

Grow by Skill-Lync · free lesson

Start watching

Free, no payment. Leave your details once and every free lesson on Grow plays straight away. A Skill-Lync counsellor may call you about the full Design of Steel Superstructure in Bridges course.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.