Indian Metro Projects and Why Elevated Corridors Are Preferred
A free lesson from Skill-Lync's Design of Elevated Metro Viaducts using STAAD.Pro course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Design of Elevated Metro Structures”
What will you learn in this free Design of Elevated Metro Viaducts using STAAD.Pro lesson?
The instructor surveys India's operational, under-construction and proposed metro lines, including Delhi Metro's 11 lines and 285 stations. The lesson names the three parts of a metro project (elevated, underground, station) and compares elevated and underground construction on speed, cost and construction challenges. It ends by introducing the design basis report.
- Operational metro systems across India
- Elevated, underground and station components
- Why authorities prefer elevated corridors
- Role of the design basis report
What comes after lesson 1?
The next free lesson is lesson 2, “Model Design Basis Report: Clauses, Loads and Design Codes” (41 min). Later in Skill-Lync's Design of Elevated Metro Viaducts using STAAD.Pro course (paid): lesson 4, Challenges in Planning Elevated Metro Corridors; lesson 5, Week 2 Session 1; lesson 6, Components and Structural Components of Bridge Superstructure or Elevated Metro Superstructure. The full course has 48 lessons (19 h 46 min of video); see the course overview or its price and syllabus.
Lesson transcript
Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.
This course on Design of Elevated Metro Wilders. So today is the first lecture of this course and in this session we will be covering the details about the operational metro projects, metro projects which are under construction, proposed metro projects, government's future plans with respect to construction of new metro corridors and then we will see the three components of a metro project. So the learning objectives for this session would be to understand the operational metros across India, to understand the metros which are under construction, to get a know-how of government's future plans with respect to construction of new metro lines and the proposed metro corridors which are to be constructed in near future.
Then we will go on to understand the structural components of a metro system which are the underground stations, the elevated stations and the elevated metro wide. So here you see a very beautiful picture of a city's landscape wherein we see a bridge which has got two decks. One is the upper deck and the other is the lower deck. On the upper deck we see a metro train climb and on the lower deck we see the vehicles moving. It is interesting to note here that these upper and lower decks are part of a one single structure which is a frame type of structure consisting of longitudinal beams which you see here, these beams at top and bottom, the transverse beams which you see here and the vertical columns.
So these beams and columns form a frame type of a structure which is supported on foundations which are obviously below the water level and are supported on the river bed. So in this course we will be understanding how to plan, design and execute the construction of such bridges. By such bridges I mean bridges which carry metro loadings and these are known as elevated wire ducts. So a wire duct is basically a long series of pillars or piers whatever you may call it and there are beams which are supported on those pillars which you typically call as girders and those girders support the loading of the vehicles or the train moving on it.
So we will understand how these structures are planned, their structural planning as well as their architectural planning and then how they are finally designed. What are the various challenges which we incorporate into our design so that there will be less difficulty during construction of those structures. So let us first of all have a review or have a look at the operational metro projects in India. So currently there are 13 operational rapid transit systems in India which are operational in 21 cities covering 678.52 km of metro lines as of August 2019 and these 678.52 km of metro lines are being maintained through a network of 540 stations.
So these stations are the areas where the passengers board the trains so they cater to the incoming passenger traffic, their ticketing and their movements and entry and exit into and from the metro corridor. These operational metros are Kolkata Metro, Delhi Metro, Nama Metro in the city of Bengaluru, Rapid Metro in Gurgaon, Mumbai Metro, Jaipur Metro, Chennai Metro, Hochi Metro, Lucknow Metro, Hyderabad Metro, Noida Metro, Ahmedabad Metro and Nagpur Metro projects. So these are all the operational metro projects at the moment in India. It is interesting to note here that Kolkata Metro was the first metro in India.
It is also the first metro project to have third rail system of power supply. So basically metros have two types of power supply systems. One is the third rail system and overhead electrification which is known as OHE system. In most of the metro corridors, you would find an OHE system. For example, in Delhi Metro, in Chennai Metro. But in Kolkata Metro, there is a below the coach power supply system which is done through a third rail. And this third rail is an electrified rail which runs parallel to the tracks of the frame along the track and it constantly touches the metro coach and supplies power to it.
And in the overhead electrification system, you might have seen for those of you who would have traveled by metro corridors in Delhi, for example, or in Chennai, you would have observed that we have cables running above the metro coaches. So we have a system of gantries and cables which are supplying power to the metro coaches for their operation. Kolkata Metro was also the first metro project to use metro coaches fully manufactured in India by ICF and BEML. So these are the agencies which are into fabrication of coaches for railways and metros.
And Kolkata Metro was the metro which used fully indigenous metro coaches which are made in India. Also, it is the only metro system which is fully owned and operated by Indian races. Other than Kolkata Metro, all the metro corridors in India which are either being constructed or are operational, they have been constructed and maintained by external funding mostly from Europe or from Japan. So the Indian government takes a loan from these agencies, refunds them that loan on an agreed rate for a period of next few years of the operation of metro corridor.
Now, coming to Delhi Metro, it is a rapid flood system that serves Delhi and its satellite cities of Ghaziabad, Feldabad, Gurgaon, Noida, Badrugan and Bandapur. And by far, it is considered to be the most important and the busiest metro corridor in India. Why it is said to be most important is because it is constructed in the national capital region of our country, India. And there are many multinational companies which are working in the NCR region. And Delhi Metro provides a comfortable mode of commute to the people to and from their offices and homes for working in these multinational companies.
Apart from that, the NCR region has a high population density and it is not always feasible for the people to use private transport like their personal cars for their commuting requirements. And therefore, Delhi Metro serves as a preferred mode of transport for the people of Delhi NCR. This Delhi Metro is the second oldest metro after Kolkata Metro. And it consists of 11 color coded regular lines serving 285 stations with a complete length of 389 km. So, this is the extent of Delhi Metro project as well.
Now, going forward, let us have a look at the metro projects which are under construction at the moment. So, the projects which are being constructed are the Navi Mumbai Metro, Pune Metro project, Kanpur Metro project, Bhoja Metro project in the city of Mopal in the state of Madhya Pradesh, Indore Metro project, Agra Metro project and Patna Metro project. Then there are a few proposed metro projects which will be constructed soon. And the feasibility studies for which have already been performed. The lines have been decided. The maps have been made.
And now the construction is about to commence. And these proposed metro corridors include Thane Metro, Kuryamutur Metro, Greater Gwaniar Metro, Jabalpur Metro, Bareilly Metro, Fayagraj Metro and Rajesh Metro. Looking at the future plans of the government with respect to construction of new corridors, new metro corridors, we have quite a few projects which are lined up and the feasibility studies for which are going on at the moment. And most of these projects are expected to be under construction soon. And these projects include Dehadoon Metro, Kozikore Light Metro, Thiruvananthapuram Light Metro, Surat Metro, Srinagar Metro, Jammu Metro, Meerut Metro, Guwahati Metro, Ghorapur Metro, Vishaka Patna Metro and Vijaybada Metro.
So we see here that government is focusing in a big way on the construction of metro corridors in India, in all the states of India, especially in the capital cities of the states. The reason is that these cities have a high population density and it is difficult for people to commute via their own personal mode of transport. Therefore, there is a requirement for enhancing the public transport facilities and when it comes to enhancing the public transport facilities. Public Transport Facilities, Metro is considered to be one of the very good options.
And looking at the present projects which are being operated, which are under construction or which are planned to be executed in future, looking at these projects, we understand that there is a huge opportunity for engineers to be employed in this highly rewarding sector of Metro, Construction, Design and Maintenance. Therefore, it becomes important for the engineers to learn the various aspects of design, construction, operation and maintenance of these Metro corridors in order to secure good jobs and to build their rewarding careers in the field of Metro projects, right?
So, this course is intended to give you a lot of knowledge with respect to the design of Elevated Metro widows and after studying through this course, you would be able to comfortably command the design of the elevated part of the provider. Be it planning, its design and you would also be familiar with the various construction challenges that come up on the site, the remedy for which is usually sought from the design engineers, practicing design engineers. So, as practicing design engineers, we also need to understand and learn the problems that we encounter and their solutions during the construction operation of the Metro corridors.
So, now let us look at the three components of a Metro project in general and those components are Elevated, the Underground and the Station part. So, in the Elevated part, you see here on this picture, we have a box girder and then we have a pier and this box girder and pier is integrated with the Station structure. So, this box girder and this pier part forms the Elevated part of the Metro corridor. This is the Station part. Station again could be underground or elevated and this Station forms an important hub of the Metro system because it caters to the various operations of the Metro projects.
be it ticketing, maintenance of the Metro corridor, you know, or providing access to the passengers into the Metro system. So, we see here there is a corridor that the passengers would use to enter into the Station and finally board the train from the platform. This Metro station itself is a frame kind of a structure wherein we see first row of columns on the left side of the road below, second row of the columns on the median of the road and third row of the columns on the right side.
So, this Station is a frame type of structure which is supported on three columns and a network of beams which we see below in dark here in this portion. You see here a very beautiful picture of an elevated Metro flying through the city and providing a comfortable mode of commute to the people working in the offices which are shown nearby. And then we have an underground Metro which is standing on an underground station. So, these three pictures typically signify these three components of a Metro project.
In this course, we will be covering mainly the elevated part of the Metro project. And why is this important to understand? It is because the elevated part is always a preferred mode for the Metro authorities. So, they would always want to construct an elevated Metro as compared to an underground Metro. The reasons for this are many, but main reasons are, first of all, when you are building above the ground, the elevated Metro, you encounter less construction challenges because you can clearly see your available space wherein you need to do the construction.
Whereas when you go for underground construction, you don't know what challenges you will face when the tunnel boring machine actually bores through the ground. You might encounter utilities, you might encounter telephone lines or water pipelines, sewage pipelines and all of those. Especially, this is especially a problem in old cities. For example, in the city of Kolkata or in the city of Delhi or Bangalore where there is a huge population density and where you don't know what our utilities are running through the ground. The second advantage of an elevated Metro called Door is that it is fast to construct above the ground as compared to below the ground.
So, the construction time is less, you can start the Metro, you can complete your construction activities and start the Metro for public use much before if you are constructing it as an elevated Metro corridor as compared to underground Metro corridor. And the third advantage is the cost advantage. Underground Metro is much more costlier than an elevated Metro. So, whenever we have budget constraints, you would want to go for an elevated Metro project. So, only to these three reasons, the speed of construction, the challenges encountered during construction and the cost of construction, elevated Metro project is a clear cut choice as compared to an underground Metro project.
And therefore, most of the priority corridors of the Metro projects, by priority corridors, I mean the corridors which are open first of all for public use, you would see that those are elevated corridors. Because when you are starting a new project, you don't want to face many challenges as an authority, as a personal authority, you want to build a safe mode of transport for the people of the cities very quickly within a limited budget. Therefore, elevated corridor becomes a choice over an underground corridor. Now, if elevated has so much of advantages, why to even go for underground construction?
That is a valid question. And the answer to that is, sometimes it is not possible to build above the ground. For example, in congested cities, let's say Chennai, you already would have a network of routes and flyovers and, you know, all of major national highways running through the city, flyovers and everything running. It would be difficult to construct above the ground because that space has already been occupied. So, then you would want to go for an underground metro for example. Or, for example, in the city of Delhi, where you already have many metro lines running above the ground.
And you, if you want to expand that metro network, then you would want to, you would have to go below the ground. Because the space above the ground might have already been occupied by previous metro corridors. So, these are the reasons which necessitate the use of an underground system. So, both of these systems elevated as well as underground are equally important. And, sometimes underground is not a choice but a composition to construct. Therefore, we understand from this discussion, we always want to build an elevated metro corridor.
But, when it is not possible to do that, we go for an underground metro corridor. And that is precisely the reason we are here in this course studying about the basics of design of an elevated metro corridor. Alright. So, now let us focus on the elevated part of the metro. So, now let us move ahead with our understanding of main constraints as to where to go. When to adopt an elevated system and when to adopt an underground system. And with this understanding, we would study the design of elevated metro corridors.
So, moving forward, as a design engineer who is working into the design of elevated metro corridors. The very first document that is prepared in an elevated metro corridor project is a design basis report. So, the design basis report, as the name suggests, is a report which forms the basis of design. So, this report tries to standardize the process of design of the particular metro corridor. So, with this report, all the engineers who are involved in the design of that particular metro project would design the same structures to be used in that particular metro corridor.
So, it means that this design basis report is basically a document which tries to standardize the design of the metro wideout. So, we will have a look at this design basis report and we will also have a look at a model design basis report. How this design basis report looks like, how it is prepared and what are the various things that are covered in this report. So, here you see a snapshot of the first page of a model design basis report which has been prepared by the research design and standards organization, their Lucknow office in September 2017.
So, this has been published by RDSO Lucknow office in September 2017. So, this is the report, this is the model DBR design basis report and this is the first page of that document. We will go through this report, each and every clause and we will try to see what all is covered in this report. Please remember that as a design engineer who is working in the design of the elevated metro wider, this is a very very important report. And in all of the projects, this is the first report that the design engineer needs to prepare and get approved from RDSO and the railways.
So, we will understand in detail what all is included in this report and what is the significance of this report. We will see clause by clause in the next session, how this report covers all the parts of a . So we will discuss it in the next session.