Unlock all 48 lessons of Design of Elevated Metro Viaducts using STAAD.ProFull course ₹40,000 · paid
Model Design Basis Report: Clauses, Loads and Design Codes
A free lesson from Skill-Lync's Design of Elevated Metro Viaducts using STAAD.Pro course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Design Basis Report for Elevated Metro Projects”
What will you learn in this free Design of Elevated Metro Viaducts using STAAD.Pro lesson?
The instructor goes clause by clause through the model design basis report published by RDSO in September 2017. Topics include structural system and clearances, material codes, dead, superimposed dead and live loads, braking, wind and seismic effects, crack width limits of 0.25 mm and 0.2 mm, and equivalent UDL tables for light, medium and heavy loading.
- Structure of a standard design basis report
- Dead, superimposed dead and live load treatment
- Crack width and fatigue check limits
- Equivalent UDL tables for metro loading
What comes after lesson 2?
The next free lesson is lesson 3, “Planning an Elevated Metro Corridor: Survey and Alignment” (19 min). Later in Skill-Lync's Design of Elevated Metro Viaducts using STAAD.Pro course (paid): lesson 4, Challenges in Planning Elevated Metro Corridors; lesson 5, Week 2 Session 1; lesson 6, Components and Structural Components of Bridge Superstructure or Elevated Metro Superstructure. The full course has 48 lessons (19 h 46 min of video); see the course overview or its price and syllabus.
Lesson transcript
Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.
Let us move forward and start our discussion from where we left in the last session. And in the last session we were discussing about the design basis report. So we had understood that a design basis report is the very first report that a design engineer working on an elevated macro wider project needs to prepare. And this design basis report basically is a document that tries to standardize the design procedure of the elevated macro wider. So you see here the first page of model DVR, which was published by RDSO in September 2017. In today's session, we'll have a detailed discussion about this DVR because this DVR has more or less a standard format, contains very important clauses on which the design of the elevated metro wider is done. So now let us have a look at individual clauses in a design basis report and try to understand the significance of those clauses. This is a standard document which is published by RDSO and approved by the Ministry of Railways, Government of India.
So a design basis report. So a design basis report, the very first part is the introduction part in which when you prepare a design basis report, you give a brief description of the project. For example, let us say you are working on a line of let us say Chennai metro project. So you need to give an introduction of that project, the length of that particular wider, number of stations which will be there, the construction timelines, costing, as well as the details about the various type of structures that would be constructed along that metro corridor.
We also describe in this brief introduction, various geometric design features like the gradient, maximum degree of the curve and the spacing of track. And then we talk about the scope of DVR in which we say that the scope of DVR is limited to this particular project, elevated section of this project, for example, elevated section of Chennai metro project phase 1 and this is limited to these clauses which are presented subsequently in this report are applicable to this project only. In the next clause, we describe about the proposed structural system of the wider.
First of all, DVR talks about the superstructure system, type of superstructure, for example, if it is a U-girder or a box-girder or an I-girder or a steel plate-girder kind of a system that we adopt and the standard spans that you would be designing and constructing in that particular stretch of the wider. Clause 2.2 talks about emergency walkway, which is a walkway on the wider, which is provided for evacuation of passengers in safe conditions during any emergency situations and the walkway dimension shall confirm to the approved schedule of dimension of the metro system.
So there is a standard schedule of dimensions of the metro system, which we will talk about in subsequent lectures and that approved SOD is to be followed. It specifies particular width of the walkway and that width of the walkway has to be provided by the designer for use during emergency situations. The next clause talks about the bearing types. Mostly in metro projects, we go with elastomeric bearings, but sometimes when it is not possible to design elastomeric bearings for larger spans, let's say, then we adopt what we give the bearings.
So we have a separate session, a separate lecture on design of bearings, where we will discuss in detail about the various bearing types that can be used in a metro wide-up project. Then we talk about the substructure system, the type of substructure that we will be providing, where it would be priestess pier cap or a reinforced pier cap. It would be a rectangular pier section or a circular pier section and things like that. Then we talk about foundation system type, whether it is an open foundation or a pile foundation or a well foundation.
And then about the parapets. So type of parapet is described. Parapets are basically the side walls of the superstructure beam on which the metro lies. The next clause, clause 3, talks about the clearances that needs to be maintained in that particular metro project. So 3.1 specifies the clearance for road traffic, the roads which are passing below the elevated wider. What is the minimum clearance that the vehicle flying on that road would require for their easy passage below the metro corridor. Then clearance for railway traffic. So schedule of dimension is followed.
It means how much width the metro coach will need when it moves along the metro corridor. How much height it would need, how much width it would need. So those are the geometric conditions that are described in this clause 3.2. And then in clause 3.3, we talk about clearance for metro traffic, which is also as per the approved metro guidance system. In point number 3.2, I would like to clarify that this railway traffic is not just the metro coach which is flying. And it is also the railway which could be going below the metro, elevated metro corridor.
Okay. So these are all the clearances that we need to understand and specify particularly in this clause. Then clause number 4 talks about the structural material and properties. 4.1 talks about the cement that would be used in the project. And it says that it should be as per clause 4.1 of IRS CBC, Indian Railway Standards Concrete Bridge Code. So this is IRS CBC. This is the standard code of practice for constructing concrete bridges, which are used for flying off railways. Then 4.2 talks about concrete, specifies its density, its Young's modulus, its modular ratio, its minimum grade of concrete for structural elements, the thermal expansion coefficient of concrete, and the poisons ratio of concrete.
And then it lists out the various relevant clauses of the Indian standards, IS 875 as well as IRS CBC, which have to be referred for these properties. 4.3 talks about the reinforcing steel and it says that the reinforcing steel should conform to clause 4.5 and 7.1.5 of IRS CBC. Then 4.4, clause 4.4 of this standard design basis report talks about the pre-stressing steel which is used in the girders of the metro wider. And it should be as per clause 4.6 of IRS CBC. And the characteristic strength of the pre-stressing steel should be as per clause 16.2.4.3 of IRS CBC.
The pre-stressing units, the jacking force, the force with which we hear, pull the tenders before they are locked, how much force we should jack them up. It is specified in clause 4.5.1 of the design basis report and it says that it should be as per clause 16.8.1 of IRS CBC. Then the next clause talks about the pre-stress losses that are there. We will be having a separate session on this pre-stressing losses and when we study about the design of superstructure. The sheathing type and the anchors type are also specified in the design basis report.
So you see here, I would like to reaffirm that all of these clauses are trying to standardize the design materials, properties, be it steel, be it concrete. So whenever a designer goes on to design a structure for a metro viaduct and if it happens to be RCC structure, then the designer would refer these specific clauses which are mentioned in this design basis report and no other clauses should be followed. So in a way, this document standardizes the design clauses which are to be referred for designing an elevator metro viaduct in India.
Then clause 4.6 talks about the structural steel for steel and composite bridges. And it says that the steel shall conform to IS 2062 and its fabrication shall be done as per provisions of IRS B1 which is nothing but the Indian Railway Standards Fabrication Code. Then it says the design of steel structure shall be done as per IRS steel bridge code and IS codes may be referred for steel RCC composite construction. The next clause 4.7 talks about the structural steel for miscellaneous use. So it says that design shall be done as per IS 800 and relevant provisions.
Hollow steel sections for structural use shall be as per IS 4923. Steel tubes for structural purpose shall be as per IS 1161. Steel for general structural purposes shall be as per IS 2062. And relevant code may be adopted for stainless steel as per required. In the next section of the design basis report, it talks about the loads that are to be considered while designing an elevated metro corridor. So first of all, the most important role and which also happens to be in most cases the heaviest load on the steel structure is its dead load.
So it says that dead load shall be based on the actual cross section area and unit weights of the materials and shall include the weight of the materials that are structural components of viaduct and permanent in nature. So for example, if you are using a box girder or a U girder as a superstructure, then the concrete that is being used to resist the loads forms the part which is known as dead load on the steel. It is that load of the structure, which is the cross section for which is actually resisting the external load.
Then we have superimposed dead load. So these superimposed dead loads, they are also dead loads, but then they are not structural in nature. For example, the parapets, for example, the trackplins. So these are the loads which are permanent on the structure, but they do not give any additional structural strength to the elevated microbiome structure. It says that SIDL or superimposed dead loads includes all the weights of materials on the structure that are not structural elements but are permanent. It includes weight of trackplins, rails, fasteners, cables, parapet, handrail, overhead electrification mast, cable trough, signaling equipment, etc. and will be considered in the design as per the site conditions.
It is important to note here that the SIDL can be of two types. Fixed or non-variable and variable. In case the Metro certifies that a portion of SIDL is of fixed or non-variable type and if not likely to vary significantly during the life of the structure and a special clause for ensuring the same is incorporated in the Metro's maintenance manual, the load factors applicable for dead load may be considered for this component of SIDL. So this is important for design engineer to understand the significance of this particular footnote.
It says that whenever we can take SIDL as a fixed component, then load factors corresponding to dead load have to be applied. So when we go on to calculate the factored bending moments and shear forces for the design of the structure, we would see that the load factors corresponding to SIDL, we would see that the load factors corresponding to dead load are typically less than those corresponding to SIDL. So if a part of SIDL which is fixed in nature throughout the life of the structure, for example the track plinth let us say, then it can also be considered to be a part of dead load and the bending moment due to the track plinth does not need to be multiplied by a higher load factor of SIDL but by a lower factor of the dead load.
So overall by this way, in this way, we are able to reduce the design movement from the structure, thus significantly reducing the cost of the structure. So you have to understand that we are trying to construct a metro viaduct and which is safe as well as economical. So if we are able to save some cost, it is at the end of the day public money that is being utilized for construction of that metro viaduct. It is the money that taxpayers pay. So it is also a designer's responsibility to design the structure as economical as possible, ensuring that it is a safe and sound structure.
So this clause helps us to further economize the design movements. Then the next clause 5.3 talks about the shrinkage and creep effects and it shall be calculated as per IRCBC. Then the live load. Live load is an important part of the overall designed load and it varies depending upon whether it is a light rail or a medium loaded rail that we are designing or it is a heavily loaded metro train that we are designing. designing the structure for. So live load is an important load. And this particular clause says that a simply supported structure shall be designed for one of the loading envelopes, light, medium or heavy tabulated in an exterior one.
The loading envelope chosen shall be as per the rolling stock planned to be used on the metro system. Alternatively, the metro shall work out the equivalent uniformly distributed load, which is also referred to as the EUDL chart for the actual train loads planned to be used. So what you can do is a design engineer as a design engineer, you can run the exact metro train on your superstructure model that you have prepared in your software in this case instead. And you can calculate the maximum bending moments that are there.
And then applying the formula equating that bending moment the 2 WL square by 8, you can find out the value of W which is the equivalent UDL. Loads other than the standard trains like track machines, cranes or any other rolling stock etc. which may come on this structure should be within the loading envelope initially decided by the metro as above. For special structures like continent structures, stable state bridges etc. the actual train load may be used for design. The next class talks about the coefficient of dynamic augmentation which is known as CDA and it is nothing but the impact factor.
So when the vehicle moves on a bridge, it causes certain impact on the bridge depth. When a train flies on the structure on the metro bridge, it causes certain vibrations of the metro bridge and therefore increases its deflection. So these dynamic vibrations are taken into design by enhancing the load of the vehicle by a factor which is known as CDA. We do not do a full scale dynamic analysis or simply supported structures. Instead, we just multiply the bending moments and shear forces obtained by the load by this CDA to get the additional impact due to the interaction of the vehicle and the bridge or train and the bridge.
And this is known as the coefficient of dynamic augmentation. Then the next class talks about footpath light load and said that it should be as per class 2.3.2 of IRS will use. Another important class is regarding the braking and traction. So we need to understand whenever there is rolling stock which is moving, by rolling stock I mean the frame which is moving on the structure, it causes certain frictional forces on the structure. There are frictional forces between the tire and the structure. And these frictional forces are transferred to the structure.
Whenever there is a braking or tractive effort in the train, whenever the driver of the train tries to stop it or accelerate it, this friction force is transferred to the PRF and PR caps and the subsequently to the foundations. So whenever the driver applies a tractive or braking force on the train, which means that it is trying to accelerate or decelerate the train, then due to friction certain load is transferred to the structure. And that is known as the braking and traction force. It is important to note here that this braking and traction force is reduced by 50% when we are combining it with the seismic force.
Because during seismic events, we assume that not all the trains would be flying on the route. So it is a probabilistic approach. Then we have the centrifugal force, which we know whenever a vehicle moves on a curve, then a centrifugal force corresponding to a centrifugal acceleration of V square by R, where V is the velocity and R is the radius of curve multiplied by M gives us the centrifugal force and that is applied onto the structure additionally. Next we have the gradient effect. So whenever train moves on a gradient, which means it is either moving up or down and inclined, then due to that gradient effect, certain force, additional force is required to be applied onto the structure.
Then wind load should be applied as per clause 2.11 of IRS visuals. And the seismic load, which should also be applied on the structure. Then the temperature effects, as per clause 2.6 of IRS bridge rules, overall temperature, differential temperature as well as temperature gradient shall be applied onto the structure. Differential settlement also needs to be considered. So due to this additional settlement, there is an additional movement which gets induced into the structure and the structure needs to be designed for that movement. So vehicle collision load as per clause 2.122 of IRS 6 needs to be applied on the bridge piers of the elevated metro wider.
Also the rules specifying the load for design of superstructure and substructure of bridges and for assessment of the strength of existing bridges should be done as per IRS bridge rules. Then next we have the buffer load and basically the provision of buffers is contemplated at the end of the temporary terminal stations during the stage opening of the corridors. So it is not always possible to design a very long metro corridor in one go. So they are designed and constructed in parts and open for public use in parts also.
So it is quite possible then that first of all three or four stations would be opened. Three to four kilometers of viaduct would be open for public use. And beyond that station, there would be a temporary buffer or temporary stoppage ahead of which the train would not go. The construction activities would still continue beyond that point. But the trains would be flying between those two stations only. Okay. So there has to be a provision of a buffer load. So buffer is basically an ending structure. which stops the train from moving beyond it. The elements of the viaduct needs to be designed for such buffer loads and the exact buffer loads need to be interfaced and ascertained during the detailed design which means that we have to be really sure about the actual type of buffer which is being employed or used in that particular metro system.
Next we have the long welded rail forces. So these long welded rails are now used quite frequently in metro projects and these long welded rails are basically rails that do not have an expansion joint in between. Our structure will have expansion joints at every 25 to 30 meters but these long welded rails will have no expansion. So due to this they are restrained for movements and since they are restrained for movements during the temperature increase or decrease case they will try to expand or contract but since they are continuous they will not be able to expand or contract and therefore in that process they will transfer some additional load to the structure.
Our structure needs to be designed for these forces which are known as LWR forces. Then next we have racking forces. So racking forces are basically the forces which come onto the structure when the train while moving applies some transverse forces. Some transverse forces especially on the curved portion of the wire duct. Then we also need to take into account the vibration effects which are due to the movement of metro train on a station bridge structure and it has to be taken into consideration. Then forces on the parapets. What are the forces on the parapets? Basically they are wind load or derailment loads.
So those need to be taken into account. And specifically with respect to derailment load. It shall be considered as per appendix 25 of IRS bridge rules with relevant gauge. For ULS and stability check loading shall be proportioned as per maximum axial load. So in the appendix 25 of IRS bridge rules the axial load is taken as 25 tons. Whereas in our metro loadings the axial load would be either 15 tons or 16 tons, 17 or 18 tons at max. So the derailment load which is specified in appendix 26 of IRS bridge rules needs to be properly scaled down to the actual axial load that the metro project which is being designed by U will be catering to.
There is also another derailment criteria which is known as Sacramento derailment criteria. And it is to be used for U-guerders. And this criteria corresponds to the application of 40% of one coach weight. Horizontally as a 3 meter long impact load on the U-guerders top trench. The derailment loads corresponds to a ULS load. For the serviceability load combination of IRS CBCA, a factor of 1 upon 1.75 shall be applied to the derailment load. So the derailment load which is given here as 40% of one coach weight applied horizontally in a 3 meter long uniform part of the parapet is a ULS load.
And when we are calculating the stresses corresponding to that load we need to divide it by a factor of 1.75. Also the erection forces which are the forces on the structure during construction they need to be taken into account as per clause 2.13 of IRS bridge rules. Then this design basis report talks about the load combinations, the methodology of load combinations. It says that provisions of bridge rules and IRS concrete bridge code shall be followed for load combinations. The superstructure, bearing substructure and foundation will be checked for one track loaded condition as well as both track loaded conditions.
For single span and both span loaded conditions as the case may be. So you see in a metro corridor, elevated metro corridor, there is one upline and the other is the downline. So upline is supported by one set of U-guerders or one set of superstructure and the downline is supported by another set of superstructure. So this clause 6.2 specifically mentions that all the possible configurations of the trains should be considered when we are trying to calculate the design load on the structure. One side one track, one side both tracks, both side one track, both side both tracks.
So these are the four combinations of loads or the placement of trains on the structure that we need to consider for arriving at the most critical design loadings on the structure. Then the design of product shall be done in accordance with the construction methodology or the construction sequence to be adopted during the execution. So this is a very important criteria, it's a very important clause that the design of structure should be as per the construction method. Why is it important? It is important because during construction, depending on the construction methodology, we will have certain construction loadings which the structure would have to tolerate.
Let us say we are trying to launch the superstructure by a launching entry whose legs are supported onto the piers. So that launching entry will, you know, put or apply different loads on the different piers while superstructure is being placed on the piers through the help of launching entry. Again, if it is a segmental type of a construction, it is quite possible that we may lift those segments up without the use of any launching entry also. Or if it is a pre-cast full span launching, then we can just lift the structure through the cane and put it.
In all of these cases, the loading on the structure would be different during construction stage. So we need to clearly understand before going ahead with the design of the structure, what kind of erection or construction methodology we will be adopting for that particular project or the corridors. And accordingly, we need to consider the construction units. The next clause number seven talks about the design parameters. It says that units of design should be in ton, meter, mm, philom, 10 kt per meter, square, mpa, degree Celsius, radians, etc. etc.
It also says that the ULS check should be as per IRS concrete bridge code. And the SLS check should be also as per the IRS concrete bridge code. With respect to crack width, it says that the crack width in reinforced concrete numbers will be checked for SS combination 1. Crack width shall be as per cross 15.9.8.2 of IRS CBC and crack width shall not exceed the admissible value based on the exposure conditions given in cross 10.2.1 of IRS CBC. So when you are designing the structure, during service there is a check which is known as the crack width check.
And IRS specifies that this crack width should not be more than 0.25 mm for moderate conditions and 0.2 mm for extreme conditions of the exposure of the structure. So the crack width has to be limited within this value of 0.25 mm or 0.2 mm depending upon the geography wherein we are actually constructing the structure. For example in Chennai metro, if we are constructing the metro near to the sea, then it is considered to be an extreme weather conditions and there we cannot exceed the crack width more than 0.2 mm.
For crack controlling columns clause 15.6.7 of IRS CBC will be modified to the extent that actual axial load will be considered to act simultaneously. So the axial load, it actually helps to decrease the crack width in a column because column has an axial load and a moment on it. So this moment tries to increase the crack width. When it is bending, there is a tension phase of the pier and there is a compression phase. So on the tension phase, it will have some crack width. And when we apply a axial load downwards on the column, this crack tends to seal, seal down or reduce.
So this DBR says that we can actually consider the impact of that axial load while we are designing the stack. It also says that clause number 10.4.1, 11.3.4 and 13.3 of IRS CBC shall be kept in view while calculating vertical deflection at mid-square. So these are certain clauses which a designer needs to check while he or she is designing the metro structure, specifically checking it for crack width considerations. Then the DBR also talks about the fatigue check. So fatigue is basically when a structure is subjected to continuous cycles of tensioning and detensioning.
Compression and tension. So when a particular structural element is in compression for some amount of time and then in tension for another amount of time and then this cycle repeats, then it tends to break earlier than its specified yield strength. It tends to yield before. The reason is that it is already fatigue due to this continuous change of stresses. So DBR says that RCC and PSA structures shall be checked as per clause 13.4 of IRS CBC. Steel structures shall be checked per clause 3.6 of IRS steel bridge code.
And it says that if lambda values are required to be used, the train closest to the actual train formation proposed to run on the metro system shall be used. Otherwise detailed counting of cycles shall be done. So this fatigue is basically dependent on the number of cycles or the repeated loadings that the structure has to basically take care of. More the cycles, more is the fatigue. Then the DBR also talks about certain durability considerations. It says that Clause 5.4 of IRS CBC. CLOS 15.9.2 of IRS CBC. Design life of the structure shall be as per clause 15.1.3 and 16.1.3 of IRS CBC.
So, nowadays, we consider the design life of a railway, bridge, especially a metro wire to be 100 years. Then, clause 7.7 talks about the drainage and it says that range of the deck shall be designed to cater the maximum envisage rainfall intensity and suitable longitudinal transfer slope should be provided. Moreover, the provisions of the clause 10.4.1.1 and 15.2.2 of IRS CBC shall be followed. So, what this implies is that drainage is a very important consideration and we cannot allow ponding of water onto our elevated metro wire.
We cannot allow the water to just stay there. After the rainfall, it should quickly drain off. So, we need to provide longitudinal transfer slopes in our superstructure in such a way that the water flows freely under gravity and is drained out of the metro wire duct. Many of you who would have seen metro corridors in your cities would observe a pipe running down from the superstructure to the ground and during times of rain, you can see water continuously brushing out of that pipe. So, that is a pipe which is provided for bringing down the rain water from the wire duct onto them.
Then, clause 8 talks about the design methodology, the bearing systems which should be used. And, it mostly says that the last two magnetic bearing shall be designed in accordance with Euro code part 1 and part 3. Design of port pit of a bearing shall be as per IRC 83 part 3. Design of spherical and serenical bearing shall be as per clause IRC 83 part 4. And, clauses 15.9.11.3 and 15.9.11.4 of IRC BC should be followed for considering replacement of bearings. If bearings cannot accumulate the seismic forces, concrete shear keys seismic restrainer shall be provided.
So, you see these clauses are basically trying to standardize the design process. I mean, it says which clause is to be referred for design of particular type of a bearing. Then, section 8.2 of the design methodology talks about PR cap and PR and says that for designing the PR cap as corbel, the provisions of clause 17.2.3 of IRC BC shall be followed. In case of shear span to effectiveness ratio being more than 0.6, PR cap will be designed as a flexural number. So, this is an important clause.
Normally, in our standard engineering textbooks, we would see that this ratio is taken as 1. But, as per IRS, if this ratio is more than 0.6, then the PR cap will be designed as a flexural number. Effective span length of a cantilever PR for the purpose of standardize ratio calculation will be taken as per IRS CBC. There are specific clauses for that and we need to refer those clauses. For foundation, it says that the foundation shall be designed as per IRS Bridge Substructure and Foundation Code.
IRS Concrete Bridge Code, Manual on the Design and Construction of Well and Pile Foundations, IS2911 and IRC45 should be followed for design of foundations. The Model DBR also talks about the soil structure interaction and it says that when designing elements, forces or estimating displacement, the soil stiffness shall be accessed based on the actual ground data. So, we cannot neglect the stiffness of the soil which is supporting our structure. So, that is the essence of this clause. The Model DBR also has a section for project specific additional requirements.
So, every project might have some additional requirements. You know, for example, some of the project might be passing through a very busy road wherein you have a public utility onto the site and you would want to give access to that public utility to the metro commuters. So, that could be a special condition of that particular part. Or there could be a place which is of high religious significance along the metro corridor and you would want to give people who commute to that metro a quick access to that religious place.
So, that could be a special condition and of that particular project and you could think about building some direct walkways from the metro station to that pilgrimage site if it is in close vicinity to the metro corridor. So, this is again, this could again be a special condition of this project. Then the section 10 of DBR talks about the design codes and standards and it says that the IRS code shall be followed in principle. Although the main clauses have been mentioned in this DBR, the other relevant clauses as available in the IRS code shall also be followed.
If provisions are not available in IRS, the order of reference shall be as follows unless specifically mentioned in the otherwise, mentioned otherwise in the relevant clause of DBR. So, it says if you do not have a clause in IRS which talks in sufficient clarity or detail about any particular issue, then you can refer these codes in this particular order. For railway related, loading related issues, you can use UIC code or Euro code or any other code, international code or national code which talks about that particular loading, but that clause the designer needs to specifically put in his design report.
And for other design and detailing related issues, you can follow IRC, IS, Euro codes or other national codes. The list of various design codes and standards to be used at various stages of work is appended as an annexure to this design basis report. And these codes with latest revisions including all amendments and notifications and correction slips only shall be used. So, it is specifically mentioned in the design basis report, what all codes will be referred for designing of the particular metro viaduct for which this DBR is being prepared.
Then section 11 of the DBR specifies the design software and it says that any commercial or propriety software can be used for analysis design provided the same is validated with manual computations or other standard software in multiple scenarios. So, it allows you to use any commercially available software for the design of metro viaduct but its results should be verifiable. Okay. Now moving on, there will be annexures in this report and which would talk about the type of metro trains, the light metro loading, the medium metro loading and the heavy metro loading, including the axial loads, the distance between the axles as well as the equivalent UDLs that needs to be considered for the design of structures supporting this kind of loading.
So, for light metro loading, we would have an axial load of 15 tons, tractive effort of 20% of this axial load and braking effort of 18% of this load. The load and length for bending moment L is considered to be the effective span in meters and for shear L is the loaded span meters to give the maximum shear in the member under considerations. We have EUDL for bending moment and shear forces which are tabulated below and these EUDL values are to be used for the design of our superstructure.
If we are designing for a light rail having axial load of 15 tons and let us say a superstructure of span 4 meters, then we would design it for a shear force corresponding to the equivalent UDL of 42.75 tons and for a bending moment corresponding to an equivalent UDL of 30.459 tons. The longitudinal forces salvage 6 tons and 5.4 tons, tractive and braking forces. So, these tables are provided for various span lengths up to 130 meters and for various loadings for light rail metro loading, for medium rail metro loading as well as for heavy metro loading.
So, you can always look up to this DBR and depending upon the type of loading that is there on your metro coil door, you can quickly select the design values of bending moment and shear forces from this table and design the structure. So, this is all about DBR and you would have understood by this discussion that this design basis report fairly tries to standardize the design process. So, this report basically tries to give a fair idea of what all clauses are to be referred, what are the loadings that are to be followed and what are the design codes that are to be followed for designing of the metro wire.
So, this is all about the design basis report. Now, let us quickly have a look at what is expected of a design engineer who is working in a design office. So, this is just one of the sectional views of an eye girder showing the reinforcement and pre-stressing cables. And these are all the details that a designer has to finalize and provide drawings and design calculations for. So, these are the plan views of that particular eye girder. These are some sectional views wherein you see the pre-stressing cables and the various reinforcements.
Then we have the peer cap, the 3D view of the peer cap, another view of the peer cap on which the superstructures, the U girders are placed. And this is a pre-cast pre-stressed peer cap. This is the reinforcement detail. So, we will study about all these structural components in great detail in our upcoming sessions. These are few more reinforcement details of the same peer cap. So, to summarize this session, we understood about the operational metro projects in India. We looked at the metros which are under construction.
The proposed metro corridors. Governments plan with respect to construction of future corridors. The three components of the metro viaduct. And we also understood in detail about the design basis. In the next lecture, we will be talking about the challenges that a designer faces when he actually starts to plan an elevated metro biaduct, what are the various construction challenges, what are the other issues that could come up and how to solve those challenges and to start with the planning of the metro biaduct. So next lecture would be dedicated on planning part of the elevated metro biaduct.
I hope this session was useful to you and I'll see you in the next session. Thank you.