BIW Fixture Project Lifecycle, Cycle Time Study and Joining Methods

A free lesson from Skill-Lync's Automotive BIW Fixture Design using CATIA V5 course, on Grow by Skill-Lync · Last updated 16 Nov 2026 · Session: “Biw Fixed Design Tutorial”

What will you learn in this free Automotive BIW Fixture Design using CATIA V5 lesson?

The instructor walks through a BIW fixture project from RFQ and technical offer to design approval, simulation, manufacturing, trials and handover. The lesson includes a cycle time example (a 40 second takt, 3.5 seconds per spot, 116 spots needing 10 robots) and begins joining processes, covering resistance spot and seam welding.

  • Project stages from RFQ to final handover
  • Fixture design flow: data study, concept, simulation, QC
  • Spot plan and cycle time calculation example
  • Resistance spot and seam welding basics

What comes after lesson 3?

Later in Skill-Lync's Automotive BIW Fixture Design using CATIA V5 course (paid): lesson 4, Understanding Different Welding Processes; lesson 5, B Fixture Design; lesson 6, Week 3: Design Methodologies - Session 2. The full course has 41 lessons (16 h 52 min of video); see the course overview or its price and syllabus.

Lesson transcript

Machine transcript of the lesson audio (lightly cleaned). Technical terms may contain errors; the video is the reference.

Hello, everyone. Welcome to BIW fixture design tutorial. In this session, we'll be covering majorly four major topics, that is, project activities, different joining processes in BIW, 3-1 principle, and body planes. Let's start with the project activities. Project activities are basically those activities are being processed, that are being practiced in a general project where BIW fixturing and tooling is involved. And it starts with the basic requirement or the RFQ that we receive from the customer. RFQ is the request for quotation, wherein a customer gives his requirements, specifications, etc.

In form of some documents or data to study and to work on it about like what will be the technical offer, what would be the commercial offer based on that, how we are proceeding to execute that project, what would be the timeline of that project, etc. So, after receiving an RFQ from the customer, we actually study those RFQ, prepare documents like the technical offer, the commercial offer, the total time duration, how do we proceed and everything. And then we'll submit our offer to the customer for him to work on it, to check on it, whether it is as per his requirement or not, whether the time period that has been mentioned is acceptable to him or not.

And then he further proceeds to confirm the order. I'll show you some documents for which, how the technical offer is made. So, it is a common practice or common, commonly used documents and the details that has been given in as a technical, like how do we are proceeding with that fixture. So, first is like, this is a manual welding fixtures. So, requirement was to weld these parts, okay. These are for MIG welding fixtures. So, this part needs to be welded together and here they have mentioned like, how much a welding length is there, like 10 plus 10 mm.

So, it means 10 mm on this side and 10 mm on this side, 20 plus 20 mm. It means throughout the round, there will be 20 mm for this part, 20 mm for this part and similarly, 44 plus 44. Now, studying the data and whatever the requirements will be, how are we proceeding, we prepare a brief information, such as, like this is fixture to be modified for full robotic welding, considering all child parts. So, approximately design and detailing will take around 15 hours. Simulation, we'll have to do the simulation, so, really around 3 to 4 hours.

Now, this for manufacturing, this, there will be a Trunian frame. Trunian is, it is like a frame which will rotate and there will be 12 to 15 mechanical box supporting this assembly. Part of what it means, like the, what will be the extra parts or extra items that we'll be using in that future, that will be a motor, a gearbox, bearing, sensors, shafts, electrical fittings, etc. For assembly and solution commissioning, we'll require at least 15, 16 hours to do this. Similarly, and second, same is with here.

Now, if you come to this, so, this is a requirement for designing a robotic shell. Now, there is, there will be one robot and two fixtures. So, we have shown that, that the robot will be placed like this and our fixture will be placed in south orientation. And here, the strong head assembly, remaining welding. So, there will be a strong head sub-assembly fixture, so, so, remaining welding will be done on this fixture. So, this will be a new fixture, design and detailing will be around of 30 hours, simulation of around 5 hours, manufacturing will take around 20 to 25 blocks of manufacturing and base, etc.

But also, with 2, 3 cylinders, electrical fittings like sensors, read switches, etc. And in solution commissioning, we'll take 10 to 12 hours for this particular fixture. Now, if we're talking about this fixture, so, it is OP90 front frame full weld plus OP160 sub-assembly. So, these are the parts, okay, that will be welded here. Okay, so, in this, like 1, 2, 3, 4 parts will be welded here. And then, 1, 2, 3, this whole assembly and 1, 2, 3 parts will be assembled. So, it means 1, 2, 3, 4, 5, 6, 7 parts will be assembled in this fixture.

So, this will be a new fixture. The design and detailing will take around 70 hours. Simulation timing can be of 10 hours. There will be like 90 to 100 blocks plus a base means a base. Plate where all the assemblies or all the blocks will be mounted. Boughtouts will be 8 to 10 cylinders with electrical fittings, etc. And there will be around 35 to 40 hours for assembly all the fixtures and installing at the customer end and commissioning and proving out. Same is here. Again, a new robotic shell, how robotic will be placed, how fixtures will be placed, what hours it will take.

So, in total, there will be 4 new fixtures and modified fixtures will be 2 or 3 depending on the scenarios. Design and detailing will take for 200 hours. Simulation will take 40 hours. There will be manufacturing of this much of parts and bottles and how much assembly. So, these are basic technical offer. Based on this, a commercial offer will be placed as per the cost like at the company's cost like if we're charging X amount per hour for design and detailing. So, the total design and detailing cost will be X into 200 hours.

For simulation, we are asking Y rupees per hour. So, that will be 40 into Y. And accordingly, manufacturing, let's say, we'll get a tentative amount. Like, okay, tentative amounts will be like this somewhere. It will come around X lakh or Y lakh or Z lakh. Okay. And then we place, okay. Then we'll give that commercial, okay, okay. We'll be proceeding with these, on these terms. And this will be the scope. We'll be doing this. And this is our commercial or technical offer for your understanding. So, once we have submitted our offer, the customer will study it.

And he will get offer from other suppliers and other vendors also. He'll compare those technicals. He'll compare the cost and everything and whichever feels and suits the best for this requirement. He'll release an LOI or PO to start the work. Once we have received the PO, preparing a schedule means you are dividing the different activities in the project. Like, when the PO will receive the kickoff meeting, design data study, 3D design preparation, the simulation, TAP. DAP is design approval process. Then when the BOP will release, release by design, then it will be indented.

It will be ordered by purchase team. Then robot shell drawing will be released. I said, like, what all are the activities? Then raw material release. Then in-house manufacturing part, accuracy inspection, painting, fixtures to receive, pneumatic installation, controls, means electrical installation. CMM or quality inspection of the fixture. Then trials, the power fitment trial. Then dispatch planning and packaging. Then installation at the customers and electrical integration. So these are all the activities. And now, so like we have mentioned here, like on 5th, 5th of the month, on Monday, we'll start, we'll receive the PO.

And kickoff meeting will be done on that day. Design data, we have taken 1, 2, 3, 4 days. So from 6th to 9th, we'll be working on design data. We'll be studying the design data. Then 3D design preparation will take 2, 3 days. So Friday, Saturday. Okay. And so goes on. So here, this will be the date that we have presented to them that will be moving, planned date that will be moving along that. So this is the plan, planning date that we are moving. On this day, on this day, we'll be completing this activity.

And on this day, we'll be starting this activity. Now, it happens due to some constraints or due to some reasons due to some errors. Our date move forward. So like in this scenario, the PO which was to be received from customer was on 5th of that month. But we received the PO 8th of the next month. Like on 12th, this is 12th, 2018. So 5th, December, 2018, we received the PO. So it get delayed. But we have already started our work on that. Since we'll have to, we started our working our homework.

So the thing which was to be done at this place, it goes to the next month. So everything has been delayed now. So all activities, because each activity is depending upon the previous activity. So once the previous activity date is saved, it will move further. So in order to maintain that, we'll have to have some R backup or some plan P so that the final date can be come to close to the final delivery date. So this was a common schedule that we prepared before starting a project so that proper scheduling to be done to complete the project in time.

Now then we prepare a BOM or BOP. Like these parts will be required. Gearboxes are required. Motors are required. These much of cylinders are required. Okay. Then we design a concept based on all the specification, all the datas. So with PU and LOI, we'll receive the input data also from the customer, as in the 3D data of the car panel, the 2D drawings, their drawing standards, the manufacturing standards, and designing standards and everything. And studying all those things, we'll start our design concept. We'll complete the design concept.

Then we'll go for DAP process, like our customer approval process. DAP is also called design approval process. So in that, customer will check whether all the specifications that has been provided by him is considered or not. We are on the right track, whether it is as per the offer that we have submitted, the technical offer we have submitted. Once he has approved your concept, things are okay. We may proceed further. Or he may put in some points, okay? Like, you have to do, you have to change this, you have to include more of the clamps or the pin or sensors or anything. So, then we will update those feedback in our design. We will get the final approval from the customer.

Once he gives the approval, we will go for detailing and drawing of that fixture and we will release all the drawings and detail for manufacturing. Once detailing has been done, we will release the drawings to manufacturing department where he will start the manufacturing of all the items like risers, milers and everything. And he will also go for BOP ordering, like he will order the cylinders as per the specifications, the sensors and other items. Once we receive all the manufacturing items, all everything will be first go to QC department.

The quality inspection team will check whether each part is as per the drawing or not because sometimes happens due to some mechanical error or human error, there will be some deviation in the dimensions that we have provided in drawing. So, it needs to be checked at the early stage because once it will get assembled at the final stage, some issue will arise. Then it will be very difficult to disassemble all our fixture and then we go for correcting it and reassembling it. It will be a lot of wastage of time.

So, a prior QC inspection is very much important. So, once the QC has approved everything and everything is as per the drawings released, then we go for mechanical and electrical assembly. So, as per the drawings, as per the design, the assembly will be done. Once the assembly is done, the quality people will again inspect whether the assembly is as per the final drawing, design assembly, everything is as per the design, all the coordinates, all the dimensioning is proper or not. He will do the CMM inspection of the fixture to check whether the relative dimensions between two pins or the restings and everything are okay or not.

Once the fixture is CMM approved and everything and quality approved, then we go for internal trial and testing. In internal trial, we first go with like putting the assembly in the fixture to check whether my assembly is properly being fixed in the fixture. The pins are getting into the holes, the clamping and everything is proper. And then we go for taking the trials of the fixture. We go for welding, whether the welding feasibility is there or not, whether gun approachability in fixture is there or not.

Although we have checked that in simulation and design at a very starting stage, but it is very much, sometimes it happens that we get those issues arise on the practical level. Because design, a design cannot be exactly as it, as I mentioned that there are a lot of tolerances and a lot of constitution that needs to be taken care of. There are a lot of physical factors that needs to be taken care of. And those factors employ that design is the final fixture that outcome is not as perfectly as per the design.

So, once the trial is done, we go for online trial. In online trial, everything is done through the control panel in an automated mode, like everything should work through electrical connections and as per the sequence and processes defined. Once we get through the online trial, we get confirmation from the customer, okay, your online trial was successful. Now, you can send that fixture for installation and commissioning. So, then we go for packaging of the fixture. Proper packaging is very necessary because in transportation, it can hamper our fixture aesthetically and the functionality of the fixture also.

So, the packaging should be taken, should be done in very good manner. Once packaging is done, we'll go for dispatch. Once fixture is dispatched, then we'll do the installation as per the layout. So, we'll be designing a layout at the very initial level where we'll show where the robot will be mounted, where the fixture will be mounted, what will be the distance between a robot and a fixture and everything. Once the installation has been done as per layout, then we'll again start trials at customer end.

So, there will be production trials and online trials. Production trial is necessary because when we are designing a fixture, we also commit the number of units that will be manufacturing from that fixture. And also, whether it is meeting the quality benchmark or not. So, in production trial, like we have committed in our technical offer that in 8 hours shift or in 12 hours shift, there will be 100 units that will be manufactured from this fixture, including everything like the weldings and everything. So, we have to make sure in the transportation trial that that fixture is capable enough to produce 100 units per 8 hours or per 12 hours shift.

Once that has been achieved, there will be training for the operators, for the staff members or the engineers to let them understand how the process is working and what are the sequence of working and everything. After trials and training has been completed, then there will be buy-off meeting. If there are any other things that needs to be incorporated, if there is something else that needs to be completed and there is something missing which was prescribed in the LOI or PO or offer submission but it's not there in the fixture, the customer will raise point.

Or sometimes it happens, customer wants some modifications, some extra things, so we will have to raise extra quotation or extra costing for that accordingly. We work on that. Once the buy-off meeting is done and everything has been closed, every points have been closed, we go for final handover. So, this was the main project activities. This is just to understand like how, what is the life cycle of a project BIW fixture is involved. Also, this is a basic or guideline or basic activities that are involved in all the manufacturing, mostly all the manufacturing domains.

This is a common platform that all the activities are being done. Now, this is the process that are involved in design. If you are talking about BIW fixture project, there are two types of industries. One are called line builders. So, they are into designing and manufacturing both. So, they themselves, they just get a requirement for designing a line or series of fixture or stations or full line where these parts will be assembled together. So, there will be sub-assembly fixtures, there will be geo fixtures, there will be checking fixtures, re-spot fixtures and everything.

They'll design everything, they'll manufacture everything, they'll prove out and they'll handover. Now, this industry, we have design service industry. In design service industry, we have, we get projects from the line builders mostly. We have to design our fixture as per the data that we have received from the customers, as per their standards, as per their specifications. We design everything as per their requirements and detail it and with simulation, validation and everything. And detail it with all, deliver it with all the documents and outputs of the design and deliverables.

So, these are the basic processes that are involved in a design process. So, first there will be data input. So, we'll be input getting a data. So, this is very much important to understand like what are the different processes that are involved while we are doing a fixture design or we are doing a project. Because we need to understand that whatever errors or whatever mistakes that are arising, we have to rectify those. So, that is why we divide different activities. So, it could be checked at every level and one process is dependent on the previous process.

So, everything is, if everything lacks on the previous process, next process cannot be proceeded. So, it is very much to understand to save our time, to save the cost. Because if the project is getting delayed, it means it is taking more manpowers. It is taking more resources. So, the cost of the project is truly increasing. To avoid all those things, we have to understand the process and how do we move in. So, first we get the data input, what are in the form of 3D, in the form of specification charts and standard parts and the sheets and everything.

First, we should study. We should study every data, each and every data while starting of a design of a fixture while starting the project. And because when we go through studying the data into the situations where the data won't seem enough or sufficient for us to work on. So, studying of data is very much important. You should always concentrate, like, because it gives you the start of the project. Like, you have, you will always have in mind, okay, like, this is a standard part we could use and this is, we will have to use these items.

And we have to design in this format and we have to detail in this format. This will save time at the later stages while you are, while you are designing or while you are doing the 2D part. Once you have studied the data thoroughly and efficiently, you have made a image and made in your mind or on some sketches. You have noted down all the specification. It's in front of you. It is very much easy to proceed and you will proceed very fluently and easily in designing the fixture.

So, after data study, we will start, we will do the 3D concept design. We will design a concept based on the process. Like, there are three panels to be assembled together. So, how the panels are to be loaded on the fixture. How the clamping will be done. And, how the gun will be coming in. Which spot to be welded first. Which spot will be welded second and third and everything. So, while designing the concept, we will have to conceptualize the basic data. Like, how the spot pan will be done.

And, what will be the cycle time of that fixture. And, etc, etc. I will show one examples of the spot plans. How it has been shown. So, here is one spot plan. Like, this station name is OP20. This is R panel. And, the red and green marks are different types of fixtures that are shown. The spots position that are shown. R1 and R2 being the robots. So, if you are seeing like R11, R12, R19, R18, R17. So, R1654. So, Robot 1 will start spotting from here.

So, this is R11. So, first spot will be done this. Second, this. Third spot. This one. This will be the third spot. This will be the fourth spot. Then, 5, 6, 7, 8, 9, 10, 11 and so on. Similarly, for robot 2. We will spot sure Jeremiah if she is done here. For station OP20. For another station, we have these spots. So these are robot 3 spots and these are robot 4 spots. Similarly, the next station, robot 5 and 6. So these are basic spot plan that needs to be mentioned so you will have a better understanding. You will design taking these constraints into mind that these are the spot areas. We will have to clear the spot area because the gun will be coming, the robot will be coming from this direction or that direction.

So you will have a better understanding. So while you are designing a concept, you should consider all the constraints in your mind because understanding the constraint is very much required. If you are not considering any constraint, you will do mistakes. You will neglect it and on the later stage, you will have to modify the fixture. You will have to work again on it. So your previous work hours will be wasted. So it means the cost of the designing is now increasing. So you will have to make very short to study the data.

Similarly, the cycle time. Similarly, the cycle time is a basic fundamental of cycle time. Like we have 465 minutes per shift and there are two shifts going on. Now there are a number of days, total number of working days are 280. And the number of components that we require per year is this much, 348,600. Total number of minutes. Total number of minutes. Total number of minutes in an year will be 260,400. Efficiency we take at 90%. Now total number of minutes and into efficiency means total efficient minutes will be 234,000. It means it has total yearly we get 14,000,000 seconds.

So the tag time will be 348,600 components are to be manufactured in these seconds. It means for each component we require 40 seconds. Now an average time per spot is 3.5 seconds. So let's say if you are having 10 spots, it means the fixture will take 35 seconds to complete that assembly. Similarly, now average time per spot is 3.5 seconds. Tag time. That means in 40 seconds. That means in 40 seconds one panel needs to be assembled. So total number of spots that we can take in 40 seconds is at 12. Now total available spots on the assembly is 116. It means to face 116 spots we will be needing 10 robots.

So that each robot should spot 12 to 13 spots in an assembly in per 40 seconds. That is why our 40 seconds will be maintained and we could get this amount with the help of much of robots. So this is a basic cycle time study. So once you have studied everything, the spot plan, the cycle time and other constraints and specifications, you have the gun size and all, then you start the concept of the design. So keeping everything in mind helps you to minimize your errors and minimize your mistakes. Once you have designed your concept, that concept goes for simulation. The simulation team will validate the process like whether there is approachability of gun, robot, there shouldn't be any clash while the gun is going to do the spot or welding on the fixture.

Whether whether there is no issues when the cylinders are operating, it is opening and closing, there shouldn't be any clashes, there should be proper gap between every units and everything. If there is will be any issues or any feedback, simulation will give a feedback to you. You will have to work on that to rectify that feedback and again give you data for simulation. Once the simulation has been, design has been validated from simulation, then this design will go for quality check. Quality people will check whether your design is as per the specification of customers, as per the requirement of customer, whether it is under basic standards of fixture designing or not, every and all the dimensions and all the things are visible and neat in your fixtures or not.

They also check if like there is other possibility of designing a unit or block in a very similar way, not as a complex way. So they can mention that this can be done in the similar way and an easy approach can be taken for this. So QC will give some updates to rectify all the mistakes in your design. Once you rectify those mistakes, we will have to give that again to simulation because now a few things have been changed and the changed and updated data needs to be checked again.

Once you get the validation from simulation, the quality will also, you will get the approval from quality also, then your tool will go for customer to review it. Customer will review whether everything is as per the documents and as per the requirements, whatever, what we have submitted, whether everything is as per all the information that we have provided at the initial stage. Once that is done, we go for 2D detailing, we do the 2D drawings and detailing of all the parts, assemblies, as per the standards and specification and templates, what we have received from customer and everything is mentioned, proper dimensioning and tolerancing and everything.

Now those drawings will go for quality check. The quality person will check whether everything, all the dimensions are mentioned in the drawings or not because it is very much important to check everything because if anything will be missing in the drawing, it will create issues on the next stage during manufacturing level. Because if you, let's say if there are 10 dimensions, if there is a part and it needs 10 dimensions to be manufactured, okay, and when you mistakenly missed one dimension to show in the drawing and when it will go for manufacturing, the machine operator will be confused like what dimensions to be maintained here, what tolerance to be maintained here.

He may end up manufacturing a wrong part, which will be wasting of time, wasting of cost or he will again go to his seniors and other persons to rectify this issue and this will again come back to you to check whether this dimension is okay or not or you have mentioned or not, whether it is this dimension important or not. So again, this will also cause the time wastage and cost wastage and everything. In order to avoid all those things, again the quality needs to be done and before giving the quality, we should also check ourselves, we should do a self QC to see whether we are missing everything or not.

We should have a checklist where all the specification of the customers, standardization of fixture design and drawings should be mentioned. You should check against that checklist whether you have taken everything into consideration or not. Once everything is okay, everything goes well, then we go for delivery data. So we will deliver the data with various validation documents like clamp validation documents, sequence sheets, ergo validation documents, pocaioka validation, everything. We prepare all the documents, all the charts, bombs, etc. and then we deliver it for further processes. Now, there are different joining processes in a BRW car part, like there are many types of joining processes like welding, gluing and everything.

So we will discuss a brief about each joining process that is very much needed to understand as how the BRW parts are being joined, what methods are being used in current industry. So at the end of the session, you should have understood the details of the spot, arc and fusion welding technologies are traditionally used for steel for the assembly of panels into the body structure. Modification procedures required for aluminum joining, brazing and soldering techniques, adhesives and mechanical fastenings often used in lightweight designs. To start with, the durability and performance of any structure is largely dependent on the quality and the design of the component joints.

Whole structure cannot be made in one piece. So we have two fundamental options for joining materials and components of a car body. So there is one mechanical joining and second is metallurgical joining. As you can see, there is an image which is showing an auto body structure which is being welded through robot. Now, if we are talking about metallurgical joining, there is weldings and everything. So in welding, we have different types of welding. This is first resistance welding. This is basically very much used in PIW assemblies.

The most common name is the spot welding, okay. But the basic mechanism is resistance welding. So to start with, tested welding is a welding technology widely used in manufacturing industry for joining metal sheets and components. The weld is made by conducting a strong current through the metal combination of heat up and finally melt the metals at location. Localized points predetermined by the design of the electrodes and or the work pieces to be welded. A force is always applied before, during and after the application of current to confine the contact area at the weld interfaces and in some applications to forge the work pieces.

So in resistance welding, what we do? So we use two electrodes, okay. One will bring to the panel. One will be touching the electrodes, okay. Now some force will be applied and electrodes will come to touch each other and will make a circuit. Once that, as soon as the circuit is being made, the current will start flowing and it will start melting our work piece at that particular and which will tend to weld those panels together. Now there are different types of resistance welding. One is resistance spot welding.

As I have told you, that is widely used in PIW joining processes. Then we have resistance seam welding. Resistance seam welding is used basically, we don't want any leakages of air or water or anything like in fuel tanks. So fuel tank outer surfaces are being seam welded because we don't want that there should be any leakage in fuel tanks so that it won't cause any accidental issues in future. Then we have resistance projection welding.

Want the rest of Automotive BIW Fixture Design using CATIA V5?

Get the full course syllabus and fees.

The full course is paid (₹40,000). We'll send the syllabus and call you back within one working day.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Full course · paid

Unlock the full Automotive BIW Fixture Design using CATIA V5 course

The remaining 38 lessons, mentor-reviewed projects and a certificate come with the paid course (₹40,000). Leave your details: we'll send the syllabus and fees and call you back.

Get the syllabus and fees

A counsellor calls you back within one working day.

By submitting you agree to our Terms and Privacy Policy.

Grow by Skill-Lync · free lesson

Start watching

Free, no payment. Leave your details once and every free lesson on Grow plays straight away. A Skill-Lync counsellor may call you about the full Automotive BIW Fixture Design using CATIA V5 course.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.