Challenge

Wiring harness routing & packaging Rules Week 3 Challenge

1.P Clamp

  • The P clamp is first uploaded in the part design workbench.
  • We define the entry and exit point after cerate plane of entry, exit and base plane.
  • Change the part design workbench to electrical part design.  
  • We define the entry and exit path of wire by using the support part command.

  

2.BackShell

  • The cad file is first uploaded in the part design workbench
  • We define the points for back shell connection & bundle connection
  • The axis systems are placed on the back shell connection points
  • The orientation of the axis system is not specific we just need to follow a similar orientation for all the parts.
  • Change the part design workbench to electrical part design.  
  • We define the back shell connection point & bundle connection point

3.Corrugated tubes 

  • First open the part design work bench to change electrical part design work bench.
  • Select the protection part command input the required data.
  • After cerate the corrugated tubes and store the catalog files.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.