Challenge

Wiring harness routing & packaging Rules Week 3 Challenge

1)I have downloaded the P clamp. With part design I pointed entry and exit poiints. The next step is to figure out the planes for entry,exit and base.

By using the electrical work bench.Define support paths for it.

2)I have downloaded the back shell.Using the part design I find out the midpoint and the bundle connections point using electrical part design work bench.

3)I made 5 corrugated tubes and slit cot family.

I made a catalogue by using catalogue document later I stored all the corrugated tubes in the slit cot family

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.