Wiring harness routing & packaging Rules Week 3 Challenge
1)I have downloaded the P clamp. With part design I pointed entry and exit poiints. The next step is to figure out the planes for entry,exit and base.
By using the electrical work bench.Define support paths for it.

2)I have downloaded the back shell.Using the part design I find out the midpoint and the bundle connections point using electrical part design work bench.

3)I made 5 corrugated tubes and slit cot family.
I made a catalogue by using catalogue document later I stored all the corrugated tubes in the slit cot family