Wiring harness design in CATIA V5 - 3D modeling Week 2 Challlenge
AIM:
Here we have only one thing to do to convert mechanical parts into electrical parts by using different workbenches and connect them electrically defined.
Procedure:
At first we have to choosen the what parts to connect fot that we have search for different web pages for downloding of the
parts manually.
Download the parts in the igs or step format fies.
Choose any part do the necessary modifications with respect to the geometry and create the points, planes and axis system for mating of the parts and for the orientation.
Once we have completed the geometric part then save the fies.
Now move the part to the mechanical workbench to electrical workbench.
Here we are going to give the electrical properties to the mechanical parts.
We have to define the connectors as connectors, mouting parts as mounting parts , clips as clips etc..
While defining the parts we have give the no of terminals it have and othre things all should be defined. so, that while converting the mechanical parts to electrical parts it will have electrical properties likes no of terminals etc..
After defining the each part individually assemble them at one place with help of the electrical assembly design workbench. here we can define each and every conection of each mating part and constrain accordingly.
NOTE:
This will be the common process for every converting mechanical part into electrical part.









