Week - 8 - Morphing
AIM :
To practice all the Morphing techniques that were shown in the video for Model-1 and to Perform morphing for the Model-2 and Increase the Height of the Dog houses and Ribs.
PROCEDURE :
MODEL - 1
- Topo is performed to get the stritch the single cons into double cons.

- After Topo.

- The geomentry check as been performed.

- The geomentry errors as been fixed using automatic and manual method.

- The Orientation of the geomentry model as been changed.

- New Ortho morph box as been created for required PID.
- The geomentry as been changed to the required axis.





MODEL -2
- Topo is performed to get the stritch the single cons into double cons.
- The geomentry check as been performed.
- The geomentry errors as been fixed using automatic and manual method.
- The Orientation of the geomentry model as been changed.
- New Ortho morph box as been created for each and every dog house.
- The Height as been changed to the required axis.





LEARNING OUTCOMES :
- Basic understanding of morphing.
- Learned how to create morph box.
- Idea of splitting the morph box.
- Moving according to the requirement.
CONCLUSION :
The Morphing techniques that were shown in the video for Model-1 as been practiced and to the morphing for the Model-2 and Increasing the Height of the Dog houses and Ribs as been peformed.