Week 8 - Challenge 3 - Coin Holder Design
Step 1
creation of tooling axis
extracted a surface
created point
created line
check it with draft analysis


Step 2
B surface creation
created base, sidewall, top wall, and outer flange
multiple extract, extract, untrim, trim extrapolation, offset and join tools are used
offset = 2.5mm
base, sidewall and top wall are trimmed first. the outer flange was created later and trimmed







The inner box like cutting portion created . and used replace options to add that on trimmed surface



step3
class c was created and joined with class A


finally it trimmed with class b.


Partbody closed surface



Draft analysis

