Week 7 Challenge - Assembly Workbench
ANS 1
PART 1

PART 2

PART 3

PART 4

PART 5

PROCEDURE
- Create new part file ande draw each diagram as shown in the question seperately.
- Now create new Prodect file ande inport all created 5 parts to it
- By anlysing the questions assamble each part to its correct position by creating axis.
- By creating constrines fix the part to requred position
- Fix the main body by using Fix components constrain.
- By creating Coincidence Contraints fix the part by its Axis.
- By using the tool Surface Contact specify the correct position in the axis.
- And save the file using save management.


ANS 2
PART 1

PART 2

PART 3

PROCEDURE
- Create new part file ande draw each diagram as shown in the question seperately.
- Now create new Prodect file ande inport all created 5 parts to it
- By anlysing the questions assamble each part to its correct position by creating axis.
- By creating constrines fix the part to requred position
- Fix the main body by using Fix components constrain.
- By creating Coincidence Contraints fix the part by its Axis.
- By using the tool Surface Contact specify the correct position in the axis.
- And save the file using save management.

