Week 12- Final project
AIM-:
- Create the Class B and Class C surface for all the given surface.
- Create the solid body for all given surface.
- Create the heat stakes and use boolen operation to add it.
- Cretate the Flanges as follow the master section.
- Create the Dog house and place the push pin.
- Create the locators and placed it.
- Create the draft analysis.
PROJECT ARE SUBIMMITED IN WORD FILE BECAUSE IMAGES ARE NOT PASTED HERE. IT IS SHOWING PROBLEM.