Week 12:- Documentation Challenge
OBJECTIVE: To Creat a bill of material(BOM) and Bill of parts (BOP) For the designed fixture.
THEORY:
Bill of Material: A bill of material (bom) is comprehensive inventory of the raw material , assemblies , part and components , as well as the quantity each needed to manufaturing a product .In is the complete list of all the that are requiried to build a product.A bom is something also referred to as a product structure , assembly component list or production recipe.
A well-definned BOM helps companies:
- Plan purchases of raw materials.
- Estimate material costs.
- Gain inventory control
- Track and plan material requirements
- maintain supply robustness and reduce waste
Bill of parts: A bill of parts is list that contain all the required hardware and parts which are to be bought from a supplier.
BILL OF MATERIAL OF DESIGNED FIXTURE






