Week 12:- Documentation Challenge
#Objective: To Create Bill of Materials(BOM) Sheet and Bought out Parts(BOP) List For the complete Fixture assembly.
#Introduction:
- BOM: A bill of materials (BOM) is an extensive list of raw materials, components, and instructions required to construct, manufacture, or repair a product or service. A bill of materials usually appears in a hierarchical format, with the highest level displaying the finished product and the bottom level showing individual components and materials.
- BOP: A ‘bought-out’ part is a part used in a machine or equipment that is not manufactured in-house by the manufacturer of the machine or equipment.
#Bill Of Materials:
















#Bought out Parts:
