Week 11 Challenge
AIM-:1. Design the pile of the below mentioned bridge . considering 28 m straight span.
- With abutment having backfill
- With abutment having RE wall.
Vertical capacity-250 tonne horizontal capacity -40 tonne
Ans-:





























2)List out different components of pile foundations and calculate kg/cumec (poundage) steel quantity in the pile.
Add the detailing of the piles steel to the scale.
- Design Pile cap as well as per IRC 112
Aim-: